If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-151-24231 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.74,"lon":-81.57,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Stark | |
| Municipality: Tuscarawas Township | |
| Operator Name: BELDEN & BLAKE CORPORATION | |
| Well Pad ID: | |
| Farm/Lease Name: SMITH J & G COMM | |
| License Status: Final Restoration | |
| License Date: 2005-05-13 | |
| Spud Date: 1986-09-02 | |
| Spud Drilling Contractor: | |
| Final Drill Date: 1986-09-07 | |
| Well Total Depth: 4255.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.740000 | |
| Longitude: -81.570000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| CO | 1985-12-03 | 182 BELDEN & BLAKE CO GeoDate 12/3/85 |
| Oil and Gas | 1985-12-03 | Issued Date 12/3/85 Expired Date 12/3/86 Acres 0150550 Tool Type CRAF Proposed Formation CLINTON Proposed Depth 00000 Proposed Drill Depth 00000 |
| Original Spud | 1986-09-02 | RL 8-9-86 |
| Completed | 1986-09-07 | RL 8-9-86 |
| Reached Total Depth | 1986-09-07 | RL 8-9-86 |
| APP | 2005-05-13 | Proposed Formations:CLINTON, Issued Date:5/13/2005, Expired Date:5/13/2006 6:00:00 AM, Drilling unit acres:150.55, Proposed Well Type:OG, Proposed Well Class: |
| Plugged/Abandoned | 2005-06-01 | RL 8-9-86 |
| Construction Permit Expires | 2006-05-13 | RL 8-9-86 |
| Change of Owner | 2007-04-27 | Operator changed from 182, BELDEN & BLAKE CORPORATION to 7578, ENERVEST OPERATING LLC well was plugged prior to transfer |
| Record Last Modified | 2015-09-24 | RL 8-9-86 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2006-09-11 | 4056 | 4140 | 30 |
| 4056 | 4140 | 30 | |
| 4056 | 4140 | 30 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 0 | 88000 Gal | 540000 |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1986 | BELDEN & BLAKE CORPORATION | 395.00 | 503.00 | 365 |
| 1987 | BELDEN & BLAKE CORPORATION | 14552.00 | 755.00 | 365 |
| 1988 | BELDEN & BLAKE CORPORATION | 7969.00 | 208.00 | 61 |
| 1990 | BELDEN & BLAKE CORPORATION | 5403.00 | 0.00 | 350 |
| 1991 | BELDEN & BLAKE CORPORATION | 3652.00 | 104.00 | 365 |
| 1992 | BELDEN & BLAKE CORPORATION | 2755.00 | 0.00 | 366 |
| 1993 | BELDEN & BLAKE CORPORATION | 2470.00 | 83.00 | 365 |
| 1994 | BELDEN & BLAKE CORPORATION | 2000.00 | 0.00 | 364 |
| 1995 | BELDEN & BLAKE CORPORATION | 1365.00 | 0.00 | 295 |
| 1996 | BELDEN & BLAKE CORPORATION | 2121.00 | 81.00 | 324 |
| 1997 | BELDEN & BLAKE CORPORATION | 2177.00 | 0.00 | 365 |
| 1998 | BELDEN & BLAKE CORPORATION | 2781.00 | 0.00 | 358 |
| 1999 | BELDEN & BLAKE CORPORATION | 1678.00 | 0.00 | 365 |
| 2000 | BELDEN & BLAKE CORPORATION | 2480.00 | 0.00 | 359 |
| 2001 | BELDEN & BLAKE CORPORATION | 1266.00 | 71.00 | 318 |
| 2002 | BELDEN & BLAKE CORPORATION | 1479.00 | 31.00 | 297 |
| 2003 | BELDEN & BLAKE CORPORATION | 2587.00 | 54.00 | 361 |
| 2004 | BELDEN & BLAKE CORPORATION | 594.00 | 8.00 | 366 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1986 | BELDEN & BLAKE CORPORATION | Brine | 1378 | 365 |
| 1987 | BELDEN & BLAKE CORPORATION | Brine | 39 | 365 |
| 1988 | BELDEN & BLAKE CORPORATION | Brine | 64 | 61 |
| 1990 | BELDEN & BLAKE CORPORATION | Brine | 52 | 350 |
| 1991 | BELDEN & BLAKE CORPORATION | Brine | 20 | 365 |
| 1992 | BELDEN & BLAKE CORPORATION | Brine | 19 | 366 |
| 1993 | BELDEN & BLAKE CORPORATION | Brine | 0 | 365 |
| 1994 | BELDEN & BLAKE CORPORATION | Brine | 0 | 364 |
| 1995 | BELDEN & BLAKE CORPORATION | Brine | 16 | 295 |
| 1996 | BELDEN & BLAKE CORPORATION | Brine | 16 | 324 |
| 1997 | BELDEN & BLAKE CORPORATION | Brine | 0 | 365 |
| 1998 | BELDEN & BLAKE CORPORATION | Brine | 0 | 358 |
| 1999 | BELDEN & BLAKE CORPORATION | Brine | 0 | 365 |
| 2000 | BELDEN & BLAKE CORPORATION | Brine | 0 | 359 |
| 2001 | BELDEN & BLAKE CORPORATION | Brine | 0 | 318 |
| 2002 | BELDEN & BLAKE CORPORATION | Brine | 0 | 297 |
| 2003 | BELDEN & BLAKE CORPORATION | Brine | 43 | 361 |
| 2004 | BELDEN & BLAKE CORPORATION | Brine | 20 | 366 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| 0000PL5169 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
| 1117592232 | 2005-05-31 | Plug / Plug Back | No Violations | Rig on location. Pit dug. Will pump cement on Wednesday. |
| 1238670708 | 2009-05-05 | Final Restoration | No Violations | The former wellhead location is reclaimed. The tank battery stone pad is still in place. There is a heat tube chimney and several feet of 2 diameter flow line left at the tank battery pad. The drip tank and house meter have been removed since my last inspection on 10-22-2007. I did not pass the Final Restoration at this time. I called Tim McConaha and requested additional restoration. |
| 1721497233 | 2007-10-22 | Final Restoration | No Violations | The former wellhead location is reclaimed. The tank battery stone pad is still in place. There is a heat tube chimney, drip tank and house meter, and 2 diameter flow line left at the tank battery pad. I did not pass the Final Restoration at this time. I called Tim McConaha and requested additional restoration. |
| 1916652144 | 2009-08-03 | Final Restoration | No Violations | This well was plugged and abandoned on 6-1-2005. The site has been reclaimed. The Final Restoration is PASSED. |
| PL5169 | PL | No Violations |
For data sources see[9]