If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-151-24415 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.9,"lon":-81.14,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: SOUND ENERGY CO INC | |
Well Pad ID: | |
Farm/Lease Name: BUTLER-RODMAN PARK | |
License Status: Producing | |
License Date: 1987-12-10 | |
Spud Date: 1987-12-12 | |
Spud Drilling Contractor: SHERMAN DRLG | |
Final Drill Date: 1987-12-18 | |
Well Total Depth: 5257.00 ft | |
Configuration: Vertical | |
Latitude: 40.900000 | |
Longitude: -81.140000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1987-12-10 | 3240 ANDERSON D CORP GeoDate 12/10/87 |
Oil and Gas | 1987-12-10 | Issued Date 12/10/87 Expired Date 12/9/88 Acres 0040000 Tool Type RTA Proposed Formation CLINTON Proposed Depth 05257 Proposed Drill Depth 05257 |
Original Spud | 1987-12-12 | |
Completed | 1987-12-18 | |
Reached Total Depth | 1987-12-18 | |
Completion Report Received | 1988-10-18 | |
Construction Permit Expires | 1988-12-09 | |
Change of Owner | 2018-03-26 | Operator changed from 3240, D ANDERSON CORP to 4327, SOUND ENERGY CO INC |
Record Last Modified | 2018-03-26 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 5051 | 5148 | 27 |
5051 | 5148 | 27 | |
5051 | 5148 | 27 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
CO2 | 0 | 30 Tons | 0 | FRAC:SAND/WATER/CO2 | ||
H2O | 0 | 90000 Gal | 50000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1990 | D ANDERSON CORP | 14312.00 | 135.00 | 365 |
1991 | D ANDERSON CORP | 11316.00 | 131.00 | 365 |
1992 | D ANDERSON CORP | 12220.00 | 137.00 | 365 |
1993 | D ANDERSON CORP | 6475.00 | 59.00 | 365 |
1994 | D ANDERSON CORP | 5262.00 | 74.00 | 365 |
1995 | D ANDERSON CORP | 3390.00 | 68.00 | 365 |
1996 | D ANDERSON CORP | 2967.00 | 64.00 | 365 |
1997 | D ANDERSON CORP | 3741.00 | 54.00 | 365 |
1998 | D ANDERSON CORP | 3606.00 | 69.00 | 365 |
1999 | D ANDERSON CORP | 3059.00 | 58.00 | 365 |
2000 | D ANDERSON CORP | 3102.00 | 60.00 | 365 |
2001 | D ANDERSON CORP | 2525.00 | 0.00 | 365 |
2002 | D ANDERSON CORP | 2999.00 | 63.00 | 365 |
2003 | D ANDERSON CORP | 2809.00 | 0.00 | 365 |
2004 | D ANDERSON CORP | 2773.00 | 0.00 | 365 |
2005 | D ANDERSON CORP | 1747.00 | 55.00 | 365 |
2006 | D ANDERSON CORP | 1465.00 | 0.00 | 365 |
2007 | D ANDERSON CORP | 1941.00 | 0.00 | 365 |
2008 | D ANDERSON CORP | 1948.00 | 0.00 | 365 |
2009 | D ANDERSON CORP | 1583.00 | 67.00 | 365 |
2010 | D ANDERSON CORP | 1932.00 | 0.00 | 365 |
2011 | D ANDERSON CORP | 1425.00 | 0.00 | 365 |
2012 | D ANDERSON CORP | 1042.00 | 0.00 | 366 |
2013 | D ANDERSON CORP | 816.00 | 0.00 | 365 |
2014 | D ANDERSON CORP | 1683.00 | 56.00 | 365 |
2015 | D ANDERSON CORP | 1214.00 | 0.00 | 365 |
2016 | D ANDERSON CORP | 1296.00 | 0.00 | 365 |
2017 | D ANDERSON CORP | 975.00 | 0.00 | 365 |
2018 | SOUND ENERGY CO INC | 614.00 | 63.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1990 | D ANDERSON CORP | Brine | 420 | 365 |
1991 | D ANDERSON CORP | Brine | 145 | 365 |
1992 | D ANDERSON CORP | Brine | 220 | 365 |
1993 | D ANDERSON CORP | Brine | 105 | 365 |
1994 | D ANDERSON CORP | Brine | 94 | 365 |
1995 | D ANDERSON CORP | Brine | 115 | 365 |
1996 | D ANDERSON CORP | Brine | 90 | 365 |
1997 | D ANDERSON CORP | Brine | 55 | 365 |
1998 | D ANDERSON CORP | Brine | 90 | 365 |
1999 | D ANDERSON CORP | Brine | 55 | 365 |
2000 | D ANDERSON CORP | Brine | 30 | 365 |
2001 | D ANDERSON CORP | Brine | 60 | 365 |
2002 | D ANDERSON CORP | Brine | 0 | 365 |
2003 | D ANDERSON CORP | Brine | 0 | 365 |
2004 | D ANDERSON CORP | Brine | 35 | 365 |
2005 | D ANDERSON CORP | Brine | 0 | 365 |
2006 | D ANDERSON CORP | Brine | 20 | 365 |
2007 | D ANDERSON CORP | Brine | 0 | 365 |
2008 | D ANDERSON CORP | Brine | 10 | 365 |
2009 | D ANDERSON CORP | Brine | 0 | 365 |
2010 | D ANDERSON CORP | Brine | 0 | 365 |
2011 | D ANDERSON CORP | Brine | 0 | 365 |
2012 | D ANDERSON CORP | Brine | 0 | 366 |
2013 | D ANDERSON CORP | Brine | 21 | 365 |
2014 | D ANDERSON CORP | Brine | 0 | 365 |
2015 | D ANDERSON CORP | Brine | 0 | 365 |
2016 | D ANDERSON CORP | Brine | 0 | 365 |
2017 | D ANDERSON CORP | Brine | 0 | 365 |
2018 | SOUND ENERGY CO INC | Brine | 130 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-477266610 | 2015-2-4 0:00:0 | UP | No Violations | 1.50 |
0000PL5014 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
0477266610 | 2015-02-04 | UrbanProduction Wells | No Violations | I was on location to perform an inspection on this urban production well. The well is located in the Butler Rodman Park. The lease road is stable and leads to a plunger lift well that has ID signage and is fenced with required locks. The tank battery is fenced, has a dike, ID signage, 100bbl production tank, poly brine tank and horizontal separator. There are no violations at this time. |
PL5014 | PL | No Violations |
For data sources see[9]