If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-151-24456 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.8,"lon":-81.46,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Stark | |
| Municipality: Perry Township | |
| Operator Name: SOUND ENERGY CO INC | |
| Well Pad ID: | |
| Farm/Lease Name: SIPPO LAKE | |
| License Status: Producing | |
| License Date: 1988-09-26 | |
| Spud Date: 1988-10-04 | |
| Spud Drilling Contractor: [[JL COATS [COATS-GOFF]]] | |
| Final Drill Date: 1988-10-10 | |
| Well Total Depth: 4535.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.800000 | |
| Longitude: -81.460000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| Oil and Gas | 1988-09-26 | Issued Date 9/26/88 Expired Date 9/26/89 Acres 0042331 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 04535 Proposed Drill Depth 04535 |
| Original Spud | 1988-10-04 | |
| Completed | 1988-10-10 | |
| Reached Total Depth | 1988-10-10 | |
| CO | 1988-11-10 | 560 MARION OPERATING CORP GeoDate 9/26/88 |
| Completion Report Received | 1988-11-10 | |
| Construction Permit Expires | 1989-09-26 | |
| Change of Owner | 2018-11-08 | Operator changed from 560, MARION OPERATING CORP to 4327, SOUND ENERGY CO INC |
| Record Last Modified | 2018-11-08 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 1997-06-29 | 4328 | 4430 | 0 |
| 4328 | 4430 | 0 | |
| 2006-09-11 | 4354 | 4396 | 18 |
| 4354 | 4396 | 18 | |
| 4328 | 4430 | 0 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 0 | 60000 Gal | 40000 | FRAC:SAND/WATER |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1989 | MARION OPERATING CORP | 12359.00 | 1292.00 | 309 |
| 1990 | MARION OPERATING CORP | 19449.00 | 1014.00 | 365 |
| 1991 | MARION OPERATING CORP | 24259.00 | 765.00 | 360 |
| 1992 | MARION OPERATING CORP | 21945.00 | 882.00 | 360 |
| 1993 | MARION OPERATING CORP | 22541.00 | 672.00 | 360 |
| 1994 | MARION OPERATING CORP | 2314.00 | 691.00 | 360 |
| 1995 | MARION OPERATING CORP | 22551.00 | 457.00 | 360 |
| 1996 | MARION OPERATING CORP | 21515.00 | 488.00 | 336 |
| 1997 | BERG PETROLEUM INC | 19435.00 | 589.00 | 365 |
| 1998 | MARION OPERATING CORP | 18852.00 | 454.00 | 360 |
| 1999 | MARION OPERATING CORP | 16416.00 | 416.00 | 357 |
| 2000 | MARION OPERATING CORP | 17307.00 | 250.00 | 237 |
| 2001 | MARION OPERATING CORP | 16166.00 | 117.00 | 365 |
| 2002 | MARION OPERATING CORP | 15415.00 | 351.00 | 365 |
| 2003 | MARION OPERATING CORP | 12317.00 | 369.00 | 365 |
| 2004 | MARION OPERATING CORP | 14346.00 | 368.00 | 365 |
| 2005 | MARION OPERATING CORP | 13188.00 | 347.00 | 367 |
| 2007 | MARION OPERATING CORP | 11735.00 | 210.00 | 365 |
| 2009 | MARION OPERATING CORP | 9104.00 | 229.00 | 365 |
| 2010 | MARION OPERATING CORP | 10844.00 | 222.00 | 365 |
| 2011 | MARION OPERATING CORP | 7960.00 | 0.00 | 0 |
| 2012 | MARION OPERATING CORP | 5476.00 | 0.00 | 366 |
| 2013 | MARION OPERATING CORP | 4470.00 | 114.00 | 365 |
| 2014 | MARION OPERATING CORP | 4471.00 | 207.00 | 365 |
| 2015 | MARION OPERATING CORP | 4641.00 | 132.00 | 365 |
| 2016 | MARION OPERATING CORP | 2834.00 | 198.00 | 250 |
| 2017 | MARION OPERATING CORP | 2913.00 | 31.00 | 365 |
| 2018 | MARION OPERATING CORP | 1783.00 | 16.00 | 242 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| 0000PL4978 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
| 1505134967 | 2017-09-11 | Production Wells | No Violations | This is a plunger lift system well equipeed with 2.375 inch diameter tubing. Well head is fenced and secured. Tank battery consists of 1 (one) 210 barrel production tank and 1 (one) 50 barrel brine tank. Signage is in place and legible. Battery is fenced and secured. No apparent problems at time of inspection. |
| PL4978 | PL | No Violations |
For data sources see[9]