If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-151-25006 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.74,"lon":-81.14,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Stark | |
Municipality: Paris Township | |
Operator Name: PDL SERVICES INC | |
Well Pad ID: | |
Farm/Lease Name: WITTE UNIT | |
License Status: Producing | |
License Date: 1996-07-25 | |
Spud Date: 1996-07-30 | |
Spud Drilling Contractor: IPSCO | |
Final Drill Date: 1996-08-09 | |
Well Total Depth: 8198.00 ft | |
Configuration: Vertical | |
Latitude: 40.740000 | |
Longitude: -81.140000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1996-07-25 | 3766 PDL SERVICES INC GeoDate 7/25/96 |
Oil and Gas | 1996-07-25 | Issued Date 7/25/96 Expired Date 7/25/97 Acres 0098280 Tool Type RTAF Proposed Formation ROSE RUN Proposed Depth 00000 Proposed Drill Depth 00000 |
Completed | 1996-08-09 | |
Reached Total Depth | 1996-08-09 | |
Original Spud | 1996-10-02 | |
Completion Report Received | 1997-07-25 | |
Construction Permit Expires | 1997-07-25 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 7384 | 7430 | 102 |
7982 | 8024 | 32 | |
1997-10-03 | 7982 | 8024 | 32 |
7384 | 7430 | 102 | |
7384 | 7430 | 102 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 1200 Bbl | 100000 | |||
GEL | 0 | 54580 Gal | 30000 | 20/40 SAND |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1996 | PDL SERVICES INC | 0.00 | 0.00 | 0 |
2008 | PDL SERVICES INC | 18.00 | 5.00 | 365 |
2009 | PDL SERVICES INC | 20.00 | 4.00 | 365 |
2010 | PDL SERVICES INC | 19.00 | 4.00 | 365 |
2011 | PDL SERVICES INC | 0.00 | 0.00 | 0 |
2012 | PDL SERVICES INC | 0.00 | 0.00 | 0 |
2013 | PDL SERVICES INC | 0.00 | 0.00 | 0 |
2014 | PDL SERVICES INC | 0.00 | 0.00 | 0 |
2015 | PDL SERVICES INC | 230.00 | 0.00 | 365 |
2016 | PDL SERVICES INC | 250.00 | 0.00 | 365 |
2017 | PDL SERVICES INC | 0.00 | 0.00 | 0 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1996 | PDL SERVICES INC | Brine | 6920 | 0 |
2008 | PDL SERVICES INC | Brine | 20 | 365 |
2009 | PDL SERVICES INC | Brine | 12 | 365 |
2010 | PDL SERVICES INC | Brine | 10 | 365 |
2011 | PDL SERVICES INC | Brine | 0 | 0 |
2012 | PDL SERVICES INC | Brine | 0 | 0 |
2013 | PDL SERVICES INC | Brine | 0 | 0 |
2014 | PDL SERVICES INC | Brine | 0 | 0 |
2015 | PDL SERVICES INC | Brine | 0 | 365 |
2016 | PDL SERVICES INC | Brine | 0 | 365 |
2017 | PDL SERVICES INC | Brine | 0 | 0 |