Well ID: 34-151-25108 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.73,"lon":-81.12,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Stark | |
Municipality: Paris Township | |
Operator Name: PDL SERVICES INC | |
Well Pad ID: | |
Farm/Lease Name: BELKNAP | |
License Status: Producing | |
License Date: 1998-08-04 | |
Spud Date: 1998-08-05 | |
Spud Drilling Contractor: GRIM DRILLING | |
Final Drill Date: 1998-09-23 | |
Well Total Depth: 800.00 ft | |
Configuration: Vertical | |
Latitude: 40.730000 | |
Longitude: -81.120000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 1998-08-04 | Proposed Formations:BEREA, Issued Date:8/4/98, Expired Date:8/4/99 6:00:00 AM, Drilling unit acres:1, Proposed Well Type:OG, Proposed Well Class:ESPW |
Original Spud | 1998-08-05 | THE SURFACE CASING WAS PULLED ON THIS WELL SO THE PRODUCTION CASING BECAME THE SURFACE CASING WHICH SHOULD NOT HAVE BEEN ALLOWED TO HAVE BEEN PERF'D. 5/23/05 JG |
Completed | 1998-09-23 | THE SURFACE CASING WAS PULLED ON THIS WELL SO THE PRODUCTION CASING BECAME THE SURFACE CASING WHICH SHOULD NOT HAVE BEEN ALLOWED TO HAVE BEEN PERF'D. 5/23/05 JG |
Reached Total Depth | 1998-09-23 | THE SURFACE CASING WAS PULLED ON THIS WELL SO THE PRODUCTION CASING BECAME THE SURFACE CASING WHICH SHOULD NOT HAVE BEEN ALLOWED TO HAVE BEEN PERF'D. 5/23/05 JG |
Completion Report Received | 1999-02-12 | THE SURFACE CASING WAS PULLED ON THIS WELL SO THE PRODUCTION CASING BECAME THE SURFACE CASING WHICH SHOULD NOT HAVE BEEN ALLOWED TO HAVE BEEN PERF'D. 5/23/05 JG |
Construction Permit Expires | 1999-08-04 | THE SURFACE CASING WAS PULLED ON THIS WELL SO THE PRODUCTION CASING BECAME THE SURFACE CASING WHICH SHOULD NOT HAVE BEEN ALLOWED TO HAVE BEEN PERF'D. 5/23/05 JG |
Record Last Modified | 2017-02-15 | THE SURFACE CASING WAS PULLED ON THIS WELL SO THE PRODUCTION CASING BECAME THE SURFACE CASING WHICH SHOULD NOT HAVE BEEN ALLOWED TO HAVE BEEN PERF'D. 5/23/05 JG |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
ACID | 0 | 500 Gal | 0 |
For data sources see[3]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | PDL SERVICES INC | 669.00 | 65.00 | 365 |
2012 | PDL SERVICES INC | 443.00 | 66.00 | 366 |
2013 | PDL SERVICES INC | 381.00 | 59.00 | 365 |
2014 | PDL SERVICES INC | 362.00 | 54.00 | 365 |
2015 | PDL SERVICES INC | 0.00 | 75.00 | 365 |
2016 | PDL SERVICES INC | 0.00 | 75.00 | 365 |
2017 | PDL SERVICES INC | 0.00 | 50.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | PDL SERVICES INC | Brine | 6 | 365 |
2012 | PDL SERVICES INC | Brine | 4 | 366 |
2013 | PDL SERVICES INC | Brine | 3 | 365 |
2014 | PDL SERVICES INC | Brine | 4 | 365 |
2015 | PDL SERVICES INC | Brine | 0 | 365 |
2016 | PDL SERVICES INC | Brine | 0 | 365 |
2017 | PDL SERVICES INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1369107201 | 2017-10-24 0:00 | PW | No Violations | 0.50 |
-1492720471 | 2016-3-18 0:00: | PW | No Violations | |
-1565652855 | 2015-9-18 0:00: | PW | No Violations | 1.50 |
-1694474548 | 2019-3-19 0:00: | PW | No Violations | 0.50 |
-216290345 | 2018-12-20 0:00 | PW | No Violations | 0.50 |
-655993811 | 2017-7-7 0:00:0 | PW | No Violations | 0.70 |
0210323414 | 2007-11-07 | Production Wells | Violations Noted | There is a service rig over the well with the elevators connected to the sucker rod string. The well is idle and has a slight gas leak. There is no I.D. sign. There is no record of reported production. Post an I.D. sign and produce the well or plug it. |
0216290345 | 2018-12-20 | Production Wells | No Violations | My inspection found the well is not plugged and not legibly identified as requested by the Compliance Notice issued on 11-07-2007. The motor has been removed from the pumpjack. There is a domestic line at the well which has an open valve. The production line is shut in. The well has reported production of 50 barrels of oil for 2017. The diked tank battery consists of two steel production tanks, a vertical separator and a meter. The compliance notice was amended by adding a remedy required by date of 03-16-2019 and mailed certified to the owner. An electronic postal receipt shows the Compliance Notice was delivered and signed for on 09-21-2018, |
0536081742 | 2018-01-18 | Production Wells | No Violations | I conducted a Compliance Notice follow-up inspection on this well. The well is not plugged or legibly identified. The motor has been removed from the pumpjack. The production is shut in. The annual production reports for years 2015 and 2016 are recorded in the wells record. There is a domestic line at the well which has an open valve. The diked tank battery consists of two steel production tanks, a vertical separator and a meter. The tank battery is share with wells 151-25144, 25245, 25167, 25099 and 25247. I called Denver Belknap Jr. (330-323-6976) and left a message. |
0644714550 | 2007-11-07 | Production Wells | No Violations | FOLLOW UP TO NOV # 210323414 There is a service rig over the well with the elevators connected to the sucker rod string. The well is idle and has a slight gas leak. There is no I.D. sign. There is no record of reported production. Post an I.D. sign and produce the well or plug it. |
0655993811 | 2017-07-07 | Production Wells | No Violations | I conducted a Compliance Notice follow-up inspection on this well. The well is not plugged or legibly identified. The motor has been removed from the pumpjack. The production is shut in. There is a domestic line which is open. The diked tank battery consists of two stock tanks, a vertical separator and a meter. It is share with wells 151-25144, 25245, 25167, 25099 and 25247. Ergon Trucking (Truck # 1504) is on location picking up a load of oil from the stock tank. |
1156335021 | 2015-10-29 | Production Wells | No Violations | I was on location to check the status of the required cleanup and maintenance for this well. The debris around the wellhead is still present. Identification on the wellhead was posted but has been blown off the sign. There has been no application to plug this well or an attempt to put the well into production. |
1315332219 | 2011-08-26 | Production Wells | No Violations | I met with Denver Belknap and Russ Lilly at the site. The well appears capable of production. There is still no I.D. sign posted at the wellhead or at the tank battery. |
1369107201 | 2017-10-24 | Production Wells | No Violations | I conducted a Compliance Notice follow-up inspection on this well. The well is not plugged or legibly identified. The motor has been removed from the pumpjack. The production is shut in. There is a domestic line at the well which has an open valve. The diked tank battery consists of two steel production tanks, a vertical separator and a meter. The tank battery is share with wells 151-25144, 25245, 25167, 25099 and 25247. I contacted PDL Services Inc. on 10-25-2017 via e-mail (krisrhiel@frontier.com) which was the email address given to me by Denver Belknap (PDL Owner). |
1442734797 | 2018-09-07 | Production Wells | No Violations | On location with Tom Hill (Regional Supervisor - ODNR, Oil & Gas), The well is not plugged or legibly identified as requested by the Compliance Notice issued on 11-07-2007. The motor has been removed from the pumpjack. There is a domestic line at the well which has an open valve. The production line is shut in. The well has reported production of 75 barrels of oil for 2016. There is no annual production report for 2017 shown in the wells record at this time. The diked tank battery consists of two steel production tanks, a vertical separator and a meter. The tank battery is shared with wells 151-25144, 25245, 25167, 25099 and 25247. This well presently is incapable of production. Consequently, this well shall be plugged in accordance with Ohio Revised Code section 1509.12(B). The well owner/operator shall submit a written plugging schedule to Shawn Murphy at 3575 Forest Lake Dr., Ste. 150, Uniontown, Ohio 44685 within 30 days, per OAC 1501:9-11-05(B), and plug the well within 180 days. The well owner/operator will be notified if the plugging schedule is approved or denied.
The following compliance issues cited on 11-07-2007 need to be completed by: *Legibly Identify the well by 10-01-2018. *Plug and Abandon the well by 03-16-2019 |
1492720471 | 2016-03-18 | Production Wells | No Violations | I was on site to conduct a compliance notice follow-up inspection of this well. The wellhead valve was open to the one inch domestic line with regulator. The flow line valves were closed. There was an audible gas leak on the wellhead where the flow line meets the 4.5 inch casing. The tank battery consisted of four 210 BBL production tanks, one 100 BBL production tank, a heater treater separator, drip bottle and chart box with no chart. Two of the 210 BBL tanks were leaking brine from the tank valve plugs. There was signage at the tank battery and the dike and access to the site was good. I called Denver Belknap of PDL Services, Inc to discuss the issue of the leaking tanks as well as the gas leak at the wellhead. Denver stated that someone would be out to immediately access and remedy the issue. There have been no updates regarding production records in the state database since 2012. |
1499434076 | 2017-05-04 | Production Wells | No Violations | I conducted a Compliance Notice follow-up inspection on this well. The well is not plugged or legibly identified. The motor has been removed from the pumpjack. The production is shut in. There is a domestic line which is open. The diked tank battery consists of two 210 barrel tanks, a vertical separator and a meter The tank battery is share with wells 151-25144, 25245, 25167, 25099 and 25247. I met with Denver Belknap (owner) and spoke with him about the compliance notice. |
1526915323 | 2018-05-21 | Production Wells | No Violations | I did a Compliance Notice follow-up inspection on this well. The well is not plugged or legibly identified. The motor has been removed from the pumpjack. There is a domestic line at the well which has an open valve. The production line is shut in. The annual production report for 2017 is not in the wells record at this time. The diked tank battery consists of two steel production tanks, a vertical separator and a meter. The tank battery is share with wells 151-25144, 25245, 25167, 25099 and 25247. I called Denver Belknap Jr. (330-323-6976) and left a message requesting a call back. |
1565652855 | 2015-09-18 | Production Wells | No Violations | I was on location to check the status of the required cleanup and maintenance for this well due on 9/17/2015. The debris around the wellhead is still present and the belt guard has not been installed as required. I have contacted Denny Belknap and left a voicemail explaining that the due date has passed and that the required work must be completed as soon as possible. |
1573332812 | 2009-05-06 | Production Wells | No Violations | I met with Denver (Denny) Belknap, Jr. on the location and discussed the well. The service rig is gone from the location and the well has been plumbed in. The gas leak has been resolved. However, there is still no I.D. sign at the wellhead or at the tank battery. Denny said that he will resolve the violations. |
1694474548 | 2019-03-19 | Production Wells | No Violations | My inspection found the well is not plugged and not legibly identified as requested by the Compliance Notice issued on 11-07-2007. The motor has been removed from the pumpjack. There is a domestic line at the well which has an open valve. The production line is shut in. The annual production report for 2017 shows 50 barrels of oil were produced. The diked tank battery consists of two steel production tanks, a vertical separator and a meter. I called PDL at 330-868-7766 and requested to speak with Mr. Denver Belknap (Owner). The secretary advised me he was out. I gave her my contact information and requested a return call from Mr. Belknap. |
1709692842 | 2018-08-14 | Production Wells | No Violations | I conducted a Compliance Notice follow-up inspection on this well. The well is not plugged or legibly identified. The motor has been removed from the pumpjack. The Annual Production Report for 2017 is not in the wells record. There is a domestic line at the well which has an open valve. The diked tank battery consists of two steel production tanks, a vertical separator and a meter. The tank battery is share with wells 151-25144, 25245, 25167, 25099 and 25247. I left a message for Denver Belknap Jr. requesting a return call and advising that further enforcement action may be taken at any time. |
1779344704 | 2015-12-30 | Production Wells | No Violations | I was on location with District Supervisor Rick Anderson to preform an inspection of this well and check the status of required actions. The wellhead has non mobile staining on the wellhead. The well has an audible leak on the wellhead. The well is currently supplying gas to a newly constructed building on the property. The operator has stated that this well may have the rods and tubing pulled from the well and sell gas from the casing. The compressor on location would need to be rebuilt to be able to sell gas into a Columbia gas line on the property. The operator states they will be cleaning up the location and reworking the compressor for gas sales. |
2088296961 | 2015-09-11 | Production Wells | No Violations | I was on location to check the status of bringing this well into compliance. The well has had proper identification posted at the wellhead as required. There is heavy machinery on location and continual work is being completed on the wells as required. A follow up inspection will be completed to ensure the wells are brought into compliance. |
210323414 | 2007-11-7 0:00: | PW | No Violations | |
536081742 | 2018-1-18 0:00: | PW | No Violations | 0.50 |
644714550 | 2007-11-7 0:00: | PW | No Violations |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
0210323414 | US-OH-121506 | 2007-11-15 | Well insufficiently equipped to prevent escape of oil and gas | |
0210323414 | US-OH-121507 | 2007-11-15 | Failure to legibly identify well | |
0210323414 | US-OH-121508 | 2007-11-15 | Well shall be plugged |