X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-151-25779

Well Details

Well ID: 34-151-25779
Loading map...
Country: United States
State: Ohio
County: Stark
Municipality: Bethlehem Township
Operator Name: ENERVEST OPERATING LLC
Well Pad ID: US-OH-000595
Farm/Lease Name: HABRUN
License Status: Final Restoration
License Date: 2012-02-27
Spud Date: 2012-05-01
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2012-06-07
Well Total Depth: 9380.00 ft
Configuration: Vertical
Latitude: 40.660000
Longitude: -81.500000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-02-27 Proposed Formations:BLACK RIVER, Issued Date:2/27/2012, Expired Date:2/26/2014 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
Reached Total Depth 2012-06-07 STATUS BASED ON INSPECTOR REPORT
Completion Report Received 2012-08-15 STATUS BASED ON INSPECTOR REPORT
Construction Permit Expires 2014-02-26 STATUS BASED ON INSPECTOR REPORT
Record Last Modified 2014-10-08 STATUS BASED ON INSPECTOR REPORT

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2012-08-16 6911 7145 40
2012-08-16 7790 8024 40
2012-08-16 8083 8317 40
2012-08-16 8376 8610 40
2012-08-16 7204 7438 40
9250 9256 37
8962 9196 40
8669 8903 40
8376 8610 40
8083 8317 40
7790 8024 40
7467 7731 40
7204 7438 40
6911 7145 40
6618 6842 40
6325 6559 40
6032 6266 40
6032 6266 40
2012-08-16 7467 7731 40
2012-08-16 6032 6266 40
2012-08-16 6325 6559 40
2012-08-16 6618 6842 40
2012-08-16 8669 8903 40
2012-08-16 8962 9196 40
2012-08-16 9250 9256 37

For data sources see[3]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1196419051 2012-5-16 0:00: DD No Violations
-132176054 2012-5-23 0:00: DD No Violations
-1457145771 2012-5-21 0:00: DD No Violations
-1613873997 2015-11-24 0:00 PL No Violations 1.50
-1822648855 2012-5-29 0:00: DD No Violations
-2023794853 2012-6-9 0:00:0 DD No Violations
0132176054 2012-05-23 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Patterson Drilling Rig #56 was drilling the 17-1/2 hole on fluid and they were at a depth of 380. All of the drilling equipment was on lined containment barriers and there were no leaks or spills. The site was fenced and a security guard was posted at the entrance. The permit was displayed in the trailer and an operators sign was posted at the site entrance. No violations at this time.
0452609672 2012-05-24 Drill / Deepen / Reopen No Violations I conducted an inspection of the drill site while on location to witness the cementing of the 13-3/8 casing. All of the drilling equipment was on lined containment barriers and there were no leaks or spills. The site was fenced and a security guard was posted at the entrance. The permit was displayed in the trailer and an operators sign was posted at the site entrance. No violations at this time. See casing report for details of cement job.
1097166923 2012-05-18 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Patterson Drilling Rig #56 was not drilling. The rig was undergoing repairs to the top-drive unit. All of the drilling equipment was on lined containment barriers. The site was fenced and a security guard was posted at the entrance. The permit was displayed in the trailer and an operators sign was posted at the site entrance. No violations at this time.
1196419051 2012-05-16 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Patterson Drilling Rig #56 was not drilling. The rig was undergoing repairs to the top-drive unit. All of the drilling equipment was on lined containment barriers. The site was fenced and a security guard was posted at the entrance. The permit was displayed in the trailer and an operators sign was posted at the site entrance. No violations at this time.
1334410616 2015-11-24 Preliminary Restoration No Violations I was on location to pass preliminary restoration for this well. The lease road is gravel and stable. The location is gated and surrounded by a fence. The well has been stimulated but is currently shut in. The fence, tank battery and wellhead are all properly identified. The tank battery is surrounded by a steel dike and contains twelve (12) 400bbl production tanks. The location contains disassembled production equipment and a gathering line. The location outside of the production pad has been reclaimed with vegetation established and no erosion control issues. The wellhead, tank battery and roadway all conform to spacing requirements. Contacted Enervest Utica foreman Tom Vosick and he stated Enervest has the well shut in because it needs a 9 miles pipeline installed to produce the well. At this time there are no violations and preliminary restoration has been passed.
1339086985 2012-06-01 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Patterson Rig #56 was drilling the production hole on fluid and they were at a depth of 4706. All of the drilling equipment was on lined containment barriers and there were no leaks or spills. The site was fenced and a security guard was posted at the entrance. The permit was displayed in the trailer and an operators sign was posted at the site entrance. No violations at this time.
1457145771 2012-05-21 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Patterson Drilling Rig #56 was not drilling. Enervest reported that they had problems with the fluid communicating with the mouse hole while drilling at approximately 180. Universal Well Services was on location to cement from the base of the 20 casing through the open hole to the mouse hole. The rig was undergoing repairs to the top-drive unit while the cement was setting up. All of the drilling equipment was on lined containment barriers. The site was fenced and a security guard was posted at the entrance. The permit was displayed in the trailer and an operators sign was posted at the site entrance. No violations at this time.
1613873997 2015-11-24 Preliminary Restoration No Violations I was on location to pass preliminary restoration for this well. The lease road is gravel and stable. The location is gated and surrounded by a fence. The well has been stimulated but is currently shut in. The fence, tank battery and wellhead are all properly identified. The tank battery is surrounded by a steel dike and contains twelve (12) 400bbl production tanks. The location contains disassembled production equipment and a gathering line. The location outside of the production pad has been reclaimed with vegetation established and no erosion control issues. The wellhead, tank battery and roadway all conform to spacing requirements. Contacted Enervest Utica foreman Tom Vosick and he stated Enervest has the well shut in because it needs a 9 miles pipeline installed to produce the well. At this time there are no violations and preliminary restoration has been passed.
1822648855 2012-05-29 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Patterson Drilling Rig #56 was drilling the production hole on fluid and they were at a depth of 1702. All of the drilling equipment was on lined containment barriers and there were no leaks or spills. The site was fenced and a security guard was posted at the entrance. The permit was displayed in the trailer and an operators sign was posted at the site entrance. No violations at this time.
1923060610 2012-06-07 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Patterson Drilling Rig #56 reached their total depth of 9380 and were in the process of tripping the drill pipe out of the hole. All of the drilling equipment was on lined containment barriers and there were no leaks or spills. The site was fenced and a security guard was posted at the entrance. The permit was displayed in the trailer and an operators sign was posted at the site entrance. No violations at this time.
2023794853 2012-06-09 Drill / Deepen / Reopen No Violations I conducted an inspection of the drill site while on location to witness the cementing of the production string. Patterson Drilling Rig #56 had reached their total depth of 9380. All of the drilling equipment was on lined containment barriers and there were no leaks or spills. The site was fenced and a security guard was posted at the entrance. The permit was displayed in the trailer and an operators sign was posted at the site entrance. No violations at this time. See casing report for details of cement job.
452609672 2012-5-24 0:00: DD No Violations

For data sources see[4]

References