If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-151-25807 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.86,"lon":-81.17,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Stark | |
Municipality: Washington Township | |
Operator Name: ENERVEST OPERATING LLC | |
Well Pad ID: | |
Farm/Lease Name: MASON UNIT | |
License Status: Producing | |
License Date: 2012-07-20 | |
Spud Date: 2012-09-11 | |
Spud Drilling Contractor: KILBARGER DRLG | |
Final Drill Date: 2012-09-18 | |
Well Total Depth: 5275.00 ft | |
Configuration: Vertical | |
Latitude: 40.860000 | |
Longitude: -81.170000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2012-07-20 | Proposed Formations:OHIO SHALE THRU CLINTON, Issued Date:7/20/2012, Expired Date:7/20/2014 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2012-09-18 | |
Completion Report Received | 2012-11-29 | |
Correction to Well | 2014-03-07 | UNIT SIZE DECREASED TO 20 ACRES. |
Construction Permit Expires | 2014-07-20 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2012-12-13 | 5075 | 5118 | 71 |
5075 | 5118 | 71 | |
5075 | 5118 | 71 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 3503 Bbl | 60000 | Superior Well Services |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | ENERVEST OPERATING LLC | 3007.00 | 885.00 | 366 |
2013 | ENERVEST OPERATING LLC | 12144.00 | 2639.00 | 365 |
2014 | ENERVEST OPERATING LLC | 6670.00 | 976.00 | 365 |
2015 | ENERVEST OPERATING LLC | 5553.00 | 1336.00 | 356 |
2016 | ENERVEST OPERATING LLC | 5372.00 | 863.00 | 366 |
2017 | ENERVEST OPERATING LLC | 4024.00 | 647.00 | 365 |
2018 | ENERVEST OPERATING LLC | 3658.00 | 808.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | ENERVEST OPERATING LLC | Brine | 0 | 366 |
2013 | ENERVEST OPERATING LLC | Brine | 896 | 365 |
2014 | ENERVEST OPERATING LLC | Brine | 19 | 365 |
2015 | ENERVEST OPERATING LLC | Brine | 355 | 356 |
2016 | ENERVEST OPERATING LLC | Brine | 169 | 366 |
2017 | ENERVEST OPERATING LLC | Brine | 30 | 365 |
2018 | ENERVEST OPERATING LLC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1236226930 | 2012-9-14 0:00: | DD | No Violations | 4.00 |
-1403563749 | 2018-11-21 0:00 | PL | No Violations | 0.50 |
-2024737795 | 2012-9-12 0:00: | DD | No Violations | 0.50 |
-838345364 | 2012-9-17 0:00: | DD | No Violations | 0.50 |
0275805171 | 2012-10-05 | Preliminary Restoration | No Violations | I inspected the Mason 3 well site (34151258070000) on October 5, 2012. The access road is graveled to the tank battery but not to the wellhead. The pits have been filled. Chipco Well Services is on-site swabbing the well. |
0427334340 | 2012-11-20 | Preliminary Restoration | No Violations | I inspected the Mason 3 (34151258070000) well site on November 20, 2012. My inspection found the access road is in good condition and graveled to the well site. The site has been rough graded and preliminary restoration is due by April 2013. The pits have been solidified and filled. |
0838345364 | 2012-09-17 | Drill / Deepen / Reopen | No Violations | Kilbarger rig #17 drilling 7.875 borehole. Current depth is 4230. Access road and pits are in good working condition. |
1236226930 | 2012-09-14 | Drill / Deepen / Reopen | No Violations | |
1348615137 | 2012-09-12 | Drill / Deepen / Reopen | No Violations | |
1403563749 | 2018-11-21 | Preliminary Restoration | No Violations | My inspection found the pits have been filled and the land restored around the well and tank battery locations. There are no signs of active erosion at either location. The preliminary restoration is compliant with Ohio Revised Code 1509.072(A). The preliminary restoration is passed. The well is equipped with a pumpjack. There is a domestic gas connection at the well. The tank battery consists of four steel production tanks, three plastic brine tank, four vertical separator and four meters. The tank battery is shared with wells #151-25806, 25771 and 25858. The well is legibly identified. No compliance issues are cited. |
1689643255 | 2012-09-19 | Drill / Deepen / Reopen | No Violations | |
1773188024 | 2012-10-23 | Preliminary Restoration | No Violations | I inspected the Mason 3 well site (34151258070000) on October 23, 2012. The access road is graveled to the tank battery but not to the wellhead. The pits have been filled and the soil has been reclaimed to pre-drill conditions. No vegetation is growing on the site. The well is in production with a gas powered pumping unit. |
2024737795 | 2012-09-12 | Drill / Deepen / Reopen | No Violations | I inspected the Mason 3 (34151258070000) site on September 12, 2012. The operator, Kilbarger rig #17, was drilling 17.5 inch borehole. Circulation was lost at 126 feet and the operator added 94 bags of mud, 12 bags of microfiber, and 5 bags of cottonseed hulls in order to establish circulation. |
275805171 | 2012-10-5 0:00: | PL | No Violations | 1.00 |
427334340 | 2012-11-20 0:00 | PL | No Violations | 0.50 |
For data sources see[9]