If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-151-25845 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.88,"lon":-81.16,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Stark | |
Municipality: Washington Township | |
Operator Name: ENERVEST OPERATING LLC | |
Well Pad ID: | |
Farm/Lease Name: HARTER UNIT | |
License Status: Producing | |
License Date: 2013-10-23 | |
Spud Date: 2013-11-12 | |
Spud Drilling Contractor: PEP DRLG | |
Final Drill Date: 2013-11-19 | |
Well Total Depth: 5276.00 ft | |
Configuration: Vertical | |
Latitude: 40.880000 | |
Longitude: -81.160000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-10-23 | Proposed Formations:OHIO SHALE THRU CLINTON, Issued Date:10/23/2013, Expired Date:10/23/2015 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2013-11-19 | |
Completion Report Received | 2014-02-12 | |
Construction Permit Expires | 2015-10-23 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2014-02-14 | 5025 | 5074 | 54 |
5025 | 5074 | 54 | |
5025 | 5074 | 54 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2013-12-16 | H2O | 0 | 3338 Gal | 0 | Universal Well Services Inc. |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | ENERVEST OPERATING LLC | 0.00 | 0.00 | 365 |
2014 | ENERVEST OPERATING LLC | 2442.00 | 1803.00 | 365 |
2015 | ENERVEST OPERATING LLC | 1270.00 | 1141.00 | 365 |
2016 | ENERVEST OPERATING LLC | 996.00 | 849.00 | 366 |
2017 | ENERVEST OPERATING LLC | 1043.00 | 775.00 | 365 |
2018 | ENERVEST OPERATING LLC | 919.00 | 636.00 | 363 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | ENERVEST OPERATING LLC | Brine | 0 | 365 |
2014 | ENERVEST OPERATING LLC | Brine | 1922 | 365 |
2015 | ENERVEST OPERATING LLC | Brine | 417 | 365 |
2016 | ENERVEST OPERATING LLC | Brine | 236 | 366 |
2017 | ENERVEST OPERATING LLC | Brine | 62 | 365 |
2018 | ENERVEST OPERATING LLC | Brine | 37 | 363 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1721545694 | 2013-11-18 0:00 | DD | No Violations | 3.00 |
-427161811 | 2013-11-20 0:00 | CS | No Violations | 4.00 |
0189055611 | 2013-11-12 | Drill / Deepen / Reopen | No Violations | The rig is currently drilling ahead at 235. They had to change out bits because they had trouble making hole. They expect to TD the surface section tomorrow mourning and will cement the same. |
0190508539 | 2013-11-19 | Drill / Deepen / Reopen | No Violations | My inspection found Pep drilling the 7 7/8 production hole. Current depth is 5000 and they are nearing total depth. Once drilling is complete they will load and circulate the hole to condition it before cementing. They will then trip out of the hole, lay down drill bit, log well and run the 4.5 inch 10.5lb/ft production casing and use Universal Well Services to cement the casing . |
0267919278 | 2015-03-18 | Preliminary Restoration | No Violations | I was on location to pass preliminary restoration for this well. The graveled lease road leads up to a shared tank battery with #25846. The tank battery contains two 210bbl production tanks, two mechanical separators, and a poly brine tank. The tank battery is contained within a dike and contains proper ID signage. The pumpjack well has proper gauges and is identified by an ID sign. Vegetation has been established on location and restoration is complete. The tank battery, well and roadway conform to spacing requirements. The leak around the wellhead has been fixed and the well is now static at surface. Preliminary restoration has been passed at this time. |
0427161811 | 2013-11-20 | Casing String Witnessed | No Violations | I was on site to witness the cementing of the production casing. The 4.5 inch 10.5lbft production casing was set at 5268. Circulation was established before cementing started. Operator pumped 150 sacks of class A cement and displaced. Good circulation was maintained during the job. The rig will be moving to the Harter #5 after this well . |
0865353475 | 2013-11-25 | Drill / Deepen / Reopen | No Violations | The pits are being closed on this well currently. Two trucks are on location pumping solidification material into the pits and they will be solidified today. The two trucks did not contain enough lime to solidify the pits so 2 more trucks will be needed to be brought on location to complete the job. The pits at this time are partially solidified and will be closed fully when the excess trucks are brought in . |
1384358502 | 2013-11-13 | Drill / Deepen / Reopen | No Violations | I was on location for the cementing of the conductor casing. PEP drilling drilled a 17.5 hole to 188 and then a 14.75 hole to 447. PEP ran 421 of 11.75, 32 lbs. casing. A guide shoe and a 15 landing joint was installed on the bottom of the casing. There were 5 centralizers installed on joints 1, 3, 5, 7, and 9. Universal was the cement contractor on location to perform the job. Universal broke circulation and began pumping 15 BBLs of gel with 50 lbs. of flake. Universal proceeded to pump 400 sacks of Class A cement that was mudscaled at 15.6 ppg. They displaced with 51.2 BBLs of fresh water leaving a 20 shoe of cement in the casing. Cement returned to surface was 20 BBLs. Fire extinguishers were available around the location. The permit was in the dog house. The pits were in stable condition. The pit liners were in good condition. The pits were fenced with orange safety fence. The location was in stable condition. No violations found. |
1386865518 | 2013-12-10 | Drill / Deepen / Reopen | No Violations | I was on location to get GPS coordinates of the well. Currently an Enervest service rig is on location swabbing the well at this time. The swabbing is going well and there are no violations at this time. |
1420038222 | 2014-12-31 | Preliminary Restoration | No Violations | I was on location to pass preliminary restoration for this well. The graveled lease road leads up to a shared tank battery with #25846. The tank battery contains two 210bbl production tanks, two mechanical separators, and a poly brine tank. The tank battery is contained within a dike and contains proper ID signage. The pumpjack well has proper gauges and is identified by an ID sign. Vegetation has been established on location and restoration is complete. The dike around the wellhead is full of water and a visible gas leak from the buried wellhead is present. I have contacted Enervest and instructed them to dig up the wellhead and seal off the leak. When the leak has been stopped, preliminary restoration will be passed for this well. |
1721545694 | 2013-11-18 | Drill / Deepen / Reopen | No Violations | I was on location to check the status of Pep drilling. The rig is currently drilling ahead at 4350 in the Lockport. Drilling is slowing but they expect to TD the well tomorrow afternoon and cement the 4.5 production (new casing WT65 10.5lb/ft) Wednesday afternoon. The rig will be moving to the Harter #2 following this well . |
189055611 | 2013-11-12 0:00 | DD | No Violations | 1.50 |
190508539 | 2013-11-19 0:00 | DD | No Violations | 1.50 |
267919278 | 2015-3-18 0:00: | PL | No Violations | 1.50 |
865353475 | 2013-11-25 0:00 | DD | No Violations | 1.50 |
For data sources see[9]