If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-151-25852 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.76,"lon":-81.13,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Stark | |
Municipality: Paris Township | |
Operator Name: C & T ENERGY OF EAST CANTON IN | |
Well Pad ID: | |
Farm/Lease Name: EVANICH | |
License Status: Producing | |
License Date: 2014-01-24 | |
Spud Date: 2014-05-30 | |
Spud Drilling Contractor: ADVENT DRLG | |
Final Drill Date: 2014-06-07 | |
Well Total Depth: | |
Configuration: Vertical | |
Latitude: 40.760000 | |
Longitude: -81.130000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-01-24 | Proposed Formations:CLINTON, Issued Date:1/24/2014, Expired Date:1/24/2016 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2014-06-07 | |
Completion Report Received | 2014-09-08 | |
Construction Permit Expires | 2016-01-24 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2014-09-09 | 5203 | 5277 | 57 |
5203 | 5277 | 57 | |
5203 | 5277 | 57 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 8 | 131000 Gal | 80000 | OTHER | Nabors Completion Services |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | C & T ENERGY OF EAST CANTON IN | 1185.00 | 936.00 | 178 |
2015 | C & T ENERGY OF EAST CANTON IN | 2427.00 | 1406.00 | 365 |
2016 | C & T ENERGY OF EAST CANTON IN | 1640.00 | 957.00 | 365 |
2017 | C & T ENERGY OF EAST CANTON IN | 1257.00 | 788.00 | 365 |
2018 | C & T ENERGY OF EAST CANTON IN | 1252.00 | 693.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | C & T ENERGY OF EAST CANTON IN | Brine | 3277 | 178 |
2015 | C & T ENERGY OF EAST CANTON IN | Brine | 595 | 365 |
2016 | C & T ENERGY OF EAST CANTON IN | Brine | 385 | 365 |
2017 | C & T ENERGY OF EAST CANTON IN | Brine | 210 | 365 |
2018 | C & T ENERGY OF EAST CANTON IN | Brine | 280 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-761499524 | 2014-6-16 0:00: | DD | No Violations | 2.00 |
0761499524 | 2014-06-16 | Drill / Deepen / Reopen | No Violations | I was on location to check the status of Advent Drilling moving from this location to the Walker #1. The rig is currently sitting on location waiting for todays rain to move through before rigging down and moving. They expect to have the trucks on location to move the rig tomorrow. There are no violations at this time. |
1401673286 | 2014-06-01 | Casing String Witnessed | No Violations | I was on location to witness the cementing of the 11.75 surface casing. A 14.75 hole was drilled to 633 with a PDC bit and 11.75 32# limited service casing was set to 624. 350sks of Class A 3% CaCl were pumped at 15.6ppg and displaced with 72.5bbls of fresh water. There were full returns during the job and 22bbls of cement were returned to surface. Advent Drilling will wait on cement 8 hours before nippling up and testing their blow out preventer. They will only install 8 5/8 casing through the Berea Sandstone if it makes a lot of water during drilling. |
1516300374 | 2018-01-18 | Production Wells | No Violations | I did a status check inspection for this well. The well is equipped with a pumpjack. The tank battery consists of a steel production tank, a steel brine tank, a vertical separator and a meter. The tank battery is shared with well #151-25844. The well is legibly identified. No compliance issues are noted at this time. |
For data sources see[9]