Well Details

Well ID: 34-151-25881
Loading map...
Country: United States
State: Ohio
County: Stark
Municipality: Plain Township
Operator Name: OHIO VALLEY ENERGY SYSTEMS COR
Well Pad ID:
Farm/Lease Name: LOUISVILLE RD PROPERTIES
License Status: Producing
License Date: 2015-04-09
Spud Date: 2015-09-30
Spud Drilling Contractor: WILDCAT DRILLING
Final Drill Date: 2015-10-07
Well Total Depth: 4977.00 ft
Configuration: Vertical
Latitude: 40.820000
Longitude: -81.310000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2015-04-09 Proposed Formations:BEREA THRU CLINTON, Issued Date:4/9/2015, Expired Date:4/8/2017 12:00:00 PM, Drilling unit acres:57.31, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2015-10-07
Completion Report Received 2015-12-09
Construction Permit Expires 2016-04-08
Record Last Modified 2017-10-23

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2015-12-10 4694 4772 46
4694 4772 46
4694 4772 46

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2015-11-03 H2O 0 95063 Gal 56400 Producers Service Corporation 500 gallons of 15% HCl acid was spotted on this well the day before and another 500 gallons of 15% HCl was pumped by Producers. Breakdown was achieved at 1442psi and the average treating pressure was 1809psi at 31 barrels per minute (bpm) with a maximum of 32bpm. A volume of 95063 gallons were pumped in the job, 64000 gallons of which were for treatment. The instant shut in pressure was 1452psi and a 5 minute 1374psi. The well was immediately flowed back when the Producers Service Corporation eq

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2015 OHIO VALLEY ENERGY SYSTEMS COR 0.00 0.00 0
2016 OHIO VALLEY ENERGY SYSTEMS COR 4937.00 526.00 247
2017 OHIO VALLEY ENERGY SYSTEMS COR 5491.00 621.00 365
2018 OHIO VALLEY ENERGY SYSTEMS COR 5119.00 816.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2015 OHIO VALLEY ENERGY SYSTEMS COR Brine 3065 0
2016 OHIO VALLEY ENERGY SYSTEMS COR Brine 684 247
2017 OHIO VALLEY ENERGY SYSTEMS COR Brine 396 365
2018 OHIO VALLEY ENERGY SYSTEMS COR Brine 302 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1271640438 2015-9-30 0:00: SC No Violations 2.00
-1513127461 2015-10-23 0:00 PL No Violations 1.50
-1593957087 2015-10-7 0:00: UD No Violations 2.50
-2006234605 2015-11-2 0:00: CT No Violations 2.00
-372100959 2015-10-16 0:00 PL No Violations 1.00
-547269842 2015-11-20 0:00 SC No Violations 2.00
-987162792 2015-11-3 0:00: CT No Violations 4.50
0017061804 2015-10-08 Casing String Witnessed No Violations I was on location to witness the installation and cementing of the 4.5 diameter production casing. The Wildcat drilling rig installed 4952 of 4.5 diameter casing with guide shoe and 20 centralizers. Petroset circulated the wellbore and pumped 250sks of Special Rose Run Cement and displaced it with 79bbls of freshwater. The latch down plug was landed and the plug pressured up to 1500psi. The plug held and the well did not flow back. The drilling rig will be moving to the yard once rigged down.
0065312128 2015-10-22 Preliminary Restoration No Violations I was on location to witness the solidifying of the drilling pits. Three loads of solidifying material has been mixed into pits. A fourth load is on its way to location to finish solidifying the blow pit. The working pit has been closed and covered with topsoil. The blow pit will be left open over night to allow it to fully solidify. The location will be fenced for the night.
0077603599 2015-10-01 Casing String Witnessed No Violations I was on location to witness the cementing of the 16 diameter conductor casing. A 22 diameter hole was drilled to 120 by Wildcat Drilling using fresh water mud. 114 of 16 65 lb/ft conductor casing was installed into the wellbore and circulated. Petroset pumped four (4) bags of gel and one bag of Baro-Seal before pumping 400sks of Class A 3% CaCl .5 lb/sk flake cement slurry. The cement was displaced with 26bbls of fresh water and 19bbls of cement were returned to surface. The rig will wait on cement for 8 hours before drilling ahead.
0088616142 2015-10-07 Urban Drill / Deepen / Reopen No Violations I was on location to check the status of Wildcat drilling this rig. The rig is drilling ahead on fluid at 4850. The rig is drilling in the Queenston, below the Clinton. The rig expects to reach total depth tonight and cement 4.5 production casing on 10/8/2015.
0372100959 2015-10-16 Preliminary Restoration No Violations I was on location to check the status of removing the drilling equipment from location. Two frac tanks and a dozer are still on location for the upcoming well stimulation. The pits are still open and are surrounded by steel fencing. The entrance to the drilling location has been fenced off and no trespassing and danger signs are posted. The pits are going to be closed the week of the 10/19/2015. There are no violations at this time.
0547269842 2015-11-20 Surface Facility Construction No Violations I was on location to check the status of putting this well into production. The wellhead is assembled and is currently set up as a plunger lift well. The frac tanks are still on location and the location is still fenced as required. The well is currently awaiting a sales line to the Columbia gas system.
0799875327 2015-10-03 Casing String Witnessed No Violations I was on location to witness the cementing of the 8.625 diameter intermediate casing. A 11 diameter hole was drilled to 856 by Wildcat Drilling on fluid. 818 of 8.625 23 lb/ft conductor casing was installed into the wellbore and circulated. Petroset pumped four (4) bags of gel and one bag of cotton seed hulls before pumping 275sks of Class A 3% CaCl .5 lb/sk flake cement slurry. The cement was displaced with 51.5bbls of fresh water and 13bbls of cement were returned to surface. The rig will wait on cement for 8 hours before drilling ahead.
0896656805 2015-09-14 Surface Facility Construction No Violations I was on location to check the status of building the drilling location for this well. The required fence for the drilling location is currently being installed. The poles and tops have been installed and are awaiting the chain-link. Wildcat Drilling LLC will drill this well when the location is complete.
0987162792 2015-11-03 Completion Testing No Violations I was on location to witness the stimulation of this well. 500 gallons of 15% HCl acid was spotted on this well the day before and another 500 gallons of 15% HCl was pumped by Producers. Breakdown was achieved at 1442psi and the average treating pressure was 1809psi at 31 barrels per minute (bpm) with a maximum of 32bpm. A volume of 95063 gallons were pumped in the job, 64000 gallons of which were for treatment. The instant shut in pressure was 1452psi and a 5 minute 1374psi. The well was immediately flowed back when the Producers Service Corp equipment was removed from location.
1271640438 2015-09-30 Surface Facility Construction No Violations The Wildcat Drilling rig has been brought onto location and the equipment was being spotted at the time of the inspection. The pits were being excavated into a firm sand/clay soil with no water infiltrating. The crews will begin to rig up on location and plan on spudding the well late tonight. Five (5) joints of 16 diameter casing have been ordered and will arrive on location later today.
1442583143 2015-09-18 Surface Facility Construction No Violations I was on location to check the status of installing a water tight cellar on location for this well. A corrugated PVC pipe has been installed in the ground and grouted with 4 cubic yards of concrete. A bulldozer has been parked over the cellar to keep it in place until the concrete has set and the drilling rig begins to move onto location. Wildcat drilling will drill this well.
1443468007 2015-09-28 Surface Facility Construction No Violations I was on location to check the status of building location. The temporary fencing has been installed around the location and the cellar installed. A bulldozer and backhoe are on location idle. The Wildcat Drilling rig has finished drilling its previous well and is going to begin moving onto location 9/29/2015.
1444057526 2015-10-02 Casing String Witnessed No Violations I was on location to witness the cementing of the 11.75 diameter surface casing. A 14.75 diameter hole was drilled to 526 by Wildcat Drilling using fresh water mud. 485 of 11.75 42 lb/ft conductor casing was installed into the wellbore with 5 centralizers and circulated. Petroset pumped 300sks of Class A 3% CaCl .5 lb/sk flake cement slurry. The cement was displaced with 37bbls of fresh water and 19bbls of cement were returned to surface. The rig will wait on cement for 8 hours before drilling ahead.
1490228494 2015-10-19 Preliminary Restoration No Violations I was on location to check the status of flocculating solids from the pits in order for the water to be hauled off location and the pits be solidified. The pits have not cleared after flocculation chemicals have been added. The operator is going to explore other options in order to clear the pits for solidification.
1513127461 2015-10-23 Preliminary Restoration No Violations I was on location to check the status of closing the pits. The pits have been solidified and covered with topsoil. The well has been prepped for the stimulation which is tentatively planned for 11/2/2015. There are no violations at this time.
1593957087 2015-10-07 Urban Drill / Deepen / Reopen No Violations I was on location to check the status of the Wildcat rig this well. The rig is currently drilling on fluid at 4500. The rig crew expects at least 1 additional day of drilling before they reach their expected total depth of 5000. The pits are currently intact and there are no violations at the time of inspection.
17061804 2015-10-8 0:00: CS No Violations 4.00
1909712596 2015-10-05 Urban Drill / Deepen / Reopen No Violations I was on location to check the status of the Wildcat rig at this well. The rig is currently switching over from air to fluid at 4100 per the urban drilling permit conditions. This is just about the top of the Newburg formation. The pits are currently intact and there are no violations at this time.
1932514079 2015-10-29 Completion Testing No Violations I was on location to check the status of preparing the location for stimulation. There are six (6) frac tanks on location staged for the frac. The well will be perforated on 11/2/2015 and the hydraulic fracturing will commence 8:00am on 11/3/2015.
2006234605 2015-11-02 Completion Testing No Violations I was on location to check the status of preparing the location for the frac. A service rig was on location and perforated the casing for the frac that is going to occur on 11/3/2015. There are no violations at this time.
65312128 2015-10-22 0:00 PL No Violations 2.00
77603599 2015-10-1 0:00: CS No Violations 4.00
799875327 2015-10-3 0:00: CS No Violations 4.50
88616142 2015-10-7 0:00: UD No Violations 1.50
896656805 2015-9-14 0:00: SC No Violations 2.00

For data sources see[9]