If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-151-25882 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.98,"lon":-81.26,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Stark | |
| Municipality: Marlboro Township | |
| Operator Name: ENERVEST OPERATING LLC | |
| Well Pad ID: | |
| Farm/Lease Name: RUFENERS CONGRESS LAKE UNIT | |
| License Status: Producing | |
| License Date: 2015-04-13 | |
| Spud Date: 2015-06-22 | |
| Spud Drilling Contractor: PEP DRLG | |
| Final Drill Date: 2015-07-04 | |
| Well Total Depth: 7415.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.980000 | |
| Longitude: -81.260000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2015-04-13 | Proposed Formations:BLACK RIVER THRU TREMPEALEAU, Issued Date:4/13/2015, Expired Date:4/12/2017 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:EW |
| Reached Total Depth | 2015-07-04 | |
| Completion Report Received | 2016-08-12 | |
| Construction Permit Expires | 2017-04-12 | |
| Record Last Modified | 2017-10-23 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2016-08-15 | 7234 | 7257 | 43 |
| 7234 | 7257 | 43 | |
| 7234 | 7257 | 43 |
For data sources see[3]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2015 | ENERVEST OPERATING LLC | 2268.00 | 781.00 | 166 |
| 2016 | ENERVEST OPERATING LLC | 2229.00 | 624.00 | 366 |
| 2017 | ENERVEST OPERATING LLC | 2802.00 | 309.00 | 365 |
| 2018 | ENERVEST OPERATING LLC | 2671.00 | 473.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2015 | ENERVEST OPERATING LLC | Brine | 1172 | 166 |
| 2016 | ENERVEST OPERATING LLC | Brine | 669 | 366 |
| 2017 | ENERVEST OPERATING LLC | Brine | 522 | 365 |
| 2018 | ENERVEST OPERATING LLC | Brine | 195 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1398818684 | 2015-6-25 0:00: | CS | No Violations | 6.00 |
| -1558042345 | 2015-6-24 0:00: | CS | No Violations | 6.00 |
| -68435436 | 2015-8-10 0:00: | PL | No Violations | 1.50 |
| -750780090 | 2015-7-16 0:00: | CT | No Violations | 1.50 |
| 0068435436 | 2015-08-10 | Preliminary Restoration | No Violations | I was on location to check the status of preliminary restoration. The tank battery has been installed and is properly identified and contained within a dike. The tank battery contains two (2) 210bbl production tanks, poly brine tank, vertical separator and chart box. The well is a gas driven pumpjack well that will be converted to electric. The well and tank battery contain all proper gauges and locks. The location has been graded flat, but vegetation has not yet been established. I will pass preliminary restoration when vegetation has been established. |
| 0619921165 | 2015-07-06 | Drill / Deepen / Reopen | No Violations | I was on location to check the status of the rig moving from this location. The fluid has been pulled from the pits and is being hauled for injection. The rig is currently being rigged down and will be moved to the Burns well site. The rig expects to be off location by 7-8-2015. There are no violations at this time. |
| 0750780090 | 2015-07-16 | Completion Testing | No Violations | I was on location to check the status of swabbing this well following stimulation. The Chipco service rig is swabbing the well and is only pulling water to surface. There is a show of gas but no oil at this time. They will continue to swab until they decide to install tubing and rods in the well. There are no violations at this time. |
| 0809646155 | 2015-07-17 | Completion Testing | No Violations | I was on location to check the status of putting this well into production. The well has had tubing and rods installed in it. A pumpjack will be on location 7/20/2015 and the well will be put into production then. |
| 0923338497 | 2015-06-23 | Drill / Deepen / Reopen | No Violations | I was on location to check the status of drilling this well. The rig is currently drilling ahead at 220 with a 17.5 diameter bit and will finish drilling this kelley. The drill string will be tripped out of the hole and a 14.5 diameter drilling bit will be installed. The rig will continue drilling to their surface casing point of 565. |
| 1143021870 | 2015-06-24 | Drill / Deepen / Reopen | No Violations | I was on location to check the status of drilling this well. The rig is currently drilling ahead with a 14.75 diameter bit at 465 and will continue drilling to 565. The rig is drilling on a freshwater mud and had to lighten the drilling mud due to the bit drilling slowly. The pits are intact and the 11.75 diameter surface casing will be cemented when the rig reaches the casing point. |
| 1398818684 | 2015-06-25 | Casing String Witnessed | No Violations | I was on location to witness the cementing of the 8.625 diameter intermediate casing. The Pep drilling rig drilled a 11.75 diameter hole from 545 to 1025. 1016 of 8.625 diameter 24 lb/ft casing was installed in the hole with a guide shoe and was centralized. Universal pumped 350sks of Type 1 cement slurry with 3% CaCl and .25lb/sk Celloflake at 15.6ppg. The cement was displaced with 63bbls of freshwater and 23bbls of good cement were returned to surface. The rig will wait on cement for 8 hours before beginning to drill ahead. |
| 1434463955 | 2015-06-16 | Surface Facility Construction | No Violations | I was on location to witness the installation of the watertight cellar for this well. A 5 hole was dug and a corrugated pipe installed. The pipe was sealed with bentonite clay and a flow ditch pipe installed in the flow ditch. The ditch was lined and the pipe sealed with expanding foam. The blow pit was being dig and consists of a sandy soil. There is no water in the pit and it is not caving in. The rig will continue to rig for the next three days. |
| 1445457858 | 2015-10-21 | Preliminary Restoration | No Violations | I was on location to check the status of preliminary restoration. The lease road is gravel and stable. The tank battery has been installed and is properly identified and contained within a dike. The tank battery contains two (2) 210bbl production tanks, poly brine tank, vertical separator and chart box. The well is an electrically driven pumpjack well. The well and tank battery contain all proper gauges and locks. The location has been graded flat, seeded and vegetation has been established. The tank battery, roadway and wellhead all conform to spacing requirements. At this time preliminary restoration has been passed. |
| 1448053270 | 2015-07-01 | Drill / Deepen / Reopen | No Violations | I was on location to check the status of Pep drilling this well. The rig is currently drilling at 4800 on air and is soaping the hole. While drilling through the Clinton Sandstone an oil show was encountered. The pits are intact and are not leaking. The rig will continue to drill its 7.875 diameter hole to total depth. |
| 1558042345 | 2015-06-24 | Casing String Witnessed | No Violations | I was on location to witness the cementing of the 11.75 diameter surface casing. The Pep drilling rig drilled a 17.5 diameter hole to 230 and a 14.75 diameter hole from 230 to 565. 555 of 11.75 diameter 42 lb/ft casing was installed in the hole with a guide shoe and was centralized. Universal pumped 535sks of Type 1 cement slurry with 3% CaCl and .25lb/sk Celloflake at 15.6ppg. The cement was displaced with 64bbls of freshwater and 29bbls of good cement were returned to surface. The rig will wait on cement for 8 hours before beginning to drill ahead. |
| 1610542369 | 2015-06-15 | Surface Facility Construction | No Violations | I was on location to check the status of preparing this location for drilling. Three loads of the Pep drilling rig are on location and Pyramid Pipeline is currently performing dirt work on the location to prepare it for the staging of the drilling rig. The pit for the well will be dug tomorrow 6/15. I will be on location to witness the pit digging. |
| 1707961690 | 2015-07-08 | Casing String Witnessed | No Violations | I was on location to witness the cementing of the 4.5 production string using a cement port collar to cover the Point Pleasant/Utica Shale and Clinton Sandstone formations with cement. The Chipco Service rig ran 6447 of 2.375 diameter tubing into the cement port collar. The port collar was opened and Universal Well Services pumped 350sks of Unifill Light 3% CaCl at 13.7ppg and displaced it with 23.4bbls of fresh water. The casing was reverse circulated with brine to remove any excess cement inside the casing. The well will be bond logged tomorrow to ensure that the Point Pleasant/Utica and Clinton Sandstone formations are covered. The frac for the well will occur on 7/14/2015. There are no violations at this time. |
| 1767425818 | 2015-07-21 | Production Wells | No Violations | I was on location to check the status of putting this well into production. The well has had tubing and rods installed in it. A pumpjack has been placed over the well and is running on a temporary gas engine. An electric motor will be installed when FirstEnergy install power service. A borehole drilling machine is on location to drill a borehole under Pinedale for a flowline for the Burns well. There are no violations at this time. |
| 619921165 | 2015-7-6 0:00:0 | DD | No Violations | 1.00 |
| 809646155 | 2015-7-17 0:00: | CT | No Violations | 1.50 |
| 923338497 | 2015-6-23 0:00: | DD | No Violations | 2.00 |
For data sources see[8]