X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-151-25883

Well Details

Well ID: 34-151-25883
Loading map...
Country: United States
State: Ohio
County: Stark
Municipality: Marlboro Township
Operator Name: ENERVEST OPERATING LLC
Well Pad ID:
Farm/Lease Name: BURNS UNIT
License Status: Producing
License Date: 2015-04-13
Spud Date: 2015-07-08
Spud Drilling Contractor: PEP DRLG
Final Drill Date: 2015-07-19
Well Total Depth: 7405.00 ft
Configuration: Vertical
Latitude: 40.970000
Longitude: -81.260000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2015-04-13 Proposed Formations:BLACK RIVER THRU TREMPEALEAU, Issued Date:4/13/2015, Expired Date:4/12/2017 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:EW
Reached Total Depth 2015-07-19
Completion Report Received 2016-08-11
Construction Permit Expires 2017-04-12
Record Last Modified 2017-10-23

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2016-08-15 7234 7252 36
7234 7252 36
7234 7252 36

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2020-07-28 H2O 0 1160 Bbl 40200 Universal Well Services Inc.

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2015 ENERVEST OPERATING LLC 3650.00 2341.00 151
2016 ENERVEST OPERATING LLC 4804.00 2657.00 366
2017 ENERVEST OPERATING LLC 3665.00 1746.00 365
2018 ENERVEST OPERATING LLC 2383.00 1028.00 339

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2015 ENERVEST OPERATING LLC Brine 1713 151
2016 ENERVEST OPERATING LLC Brine 1164 366
2017 ENERVEST OPERATING LLC Brine 899 365
2018 ENERVEST OPERATING LLC Brine 313 339

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1758278922 2015-8-10 0:00: PL No Violations 1.50
-610579319 2015-7-1 0:00:0 SC No Violations 1.00
-622453952 2015-7-23 0:00: CS No Violations 5.00
0100615786 2015-07-22 Surface Facility Construction No Violations I was on location to check the status of rigging down the Pep drilling rig from this location. The Pep rig has been moved from the location to the Kakish and is awaiting several loads of equipment to be hauled. A tubing trailer is on location to be run into the well for the cementing of the Point Pleasant/Clinton Sandstone cement job. A location for the Chipco service rig is being built around the wellhead for the cementing and stimulation of the well. Pyramid Pipeline will be on location within the next few days to close the drilling pits of this well. There are no violations at this time.
0356939753 2015-07-14 Drill / Deepen / Reopen No Violations I was on location to check the status of the Pep rig drilling this well. The rig is drilling a 7.875 diameter hole at 3040 on air. There are no oil or gas shows currently in the well. The pits are intact and there are no violations at this time.
0384113999 2015-07-16 Drill / Deepen / Reopen No Violations I was on location to check the status of Pep drilling this well. The rig is currently tripping back into the hole with a PDC bit at 4795. The rig will unload the hole and continue to drill on air. There have been no gas or oil shows drilling this well. There are no violations at this time.
0610579319 2015-07-01 Surface Facility Construction No Violations I was on location to check the status of building this location for well drilling. The lease road has been built and graveled. The location is currently having trees and brush removed and a bulldozer is on location to begin dirt work. Pep Drilling will move to this location to drill the well when it is built.
0622453952 2015-07-23 Casing String Witnessed No Violations
0783024562 2015-07-20 Drill / Deepen / Reopen No Violations I was on location to check the status of the Pep drilling rig. The well has hit a total depth of 7504. Weatherford logging is currently on location and is rigging up to log the well. Enervest will install and cement casing in this well as the Rose Run Sandstone has shown to be producible. There are no violations at this time.
100615786 2015-7-22 0:00: SC No Violations 2.00
1162585151 2015-07-14 Drill / Deepen / Reopen No Violations I was on location to check the status of the Pep rig drilling this well. The rig is drilling a 7.875 diameter hole at 3750 on air. There are no oil or gas shows currently in the well. The pits are intact and there are no violations at this time.
1269285706 2015-07-06 Surface Facility Construction No Violations I was on location to check the status of building the location. The Pep Drilling rig is moving from the Rufeners Congress Lake location to this location currently. The location is prepared and a small amount of dirt work is being completed. The drilling rig should be on location by 7-8-2015.
1437491724 2015-07-21 Drill / Deepen / Reopen No Violations I was on location to check the status of the Pep drilling rig. The well has hit a total depth of 7504 and 4.5 diameter casing has been cemented. The rig is now going to move to the Kakish well to drill another Rose Run well. There are no violations at this time.
1439331995 2015-07-24 Completion Testing No Violations I was on location to check the cement top of the cement job to cover the Point Pleasant/Clinton Sandstone formations. The cement top was found to be at 4220. Appalachian Well Services confirmed this with a cement bond log. The well is going to be perforated and fraced the week of 7/27/2015. There are no violations at this time.
1530489693 2015-07-08 Drill / Deepen / Reopen No Violations I was on location to conduct a pre spud meeting with Enervest and the Pep Drilling rig. The pits have been dug into a clay soil and the well has been spudded. A 17.5 hole will be drilled through the approximate 279 of drift and a 14.5 hole will be drilled to the surface casing point of approximately 565. There are no violations at this time.
1758278922 2015-08-10 Preliminary Restoration No Violations I was on location to check the status of preliminary restoration. The pits have been closed and the location has been partially graded out. The well is currently producing with a gas driven pumpjack. A crew is on location installing the equipment for the electric motor for the pumpjack. When restoration is complete and vegetation established I will pass preliminary restoration.
356939753 2015-7-14 0:00: DD No Violations 2.00
384113999 2015-7-16 0:00: DD No Violations 1.50
783024562 2015-7-20 0:00: DD No Violations 1.50

For data sources see[9]

References