X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-151-60629

Well Details

Well ID: 34-151-60629
Loading map...
Country: United States
State: Ohio
County: Stark
Municipality: Plain Township
Operator Name: ENERVEST OPERATING LLC
Well Pad ID:
Farm/Lease Name: HUMBERT
License Status: Final Restoration
License Date: 2015-04-09
Spud Date: 1934-06-26
Spud Drilling Contractor:
Final Drill Date: 1934-10-03
Well Total Depth: 4515.00 ft
Configuration: Vertical
Latitude: 40.880000
Longitude: -81.370000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Original Spud 1934-06-26
Completed 1934-10-03
Reached Total Depth 1934-10-03
Change of Owner 2007-04-27 Operator changed from 182, BELDEN & BLAKE CORPORATION to 7578, ENERVEST OPERATING LLC
APP 2015-04-09 Proposed Formations:CLINTON, Issued Date:4/9/2015, Expired Date:4/8/2017 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:OG, Proposed Well Class:
Plugged/Abandoned 2015-07-22
Construction Permit Expires 2017-04-08
Record Last Modified 2017-11-21

For data sources see[2]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
0 0 Mscf 0
0 0 0

For data sources see[3]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1994 DOMINION EAST OHIO 12756.00 0.00 365
1995 BELDEN & BLAKE CORPORATION 5125.00 0.00 151
1996 BELDEN & BLAKE CORPORATION 6572.00 0.00 366
1997 BELDEN & BLAKE CORPORATION 6624.00 0.00 365
1998 BELDEN & BLAKE CORPORATION 9758.00 0.00 365
1999 BELDEN & BLAKE CORPORATION 13126.00 0.00 365
2000 BELDEN & BLAKE CORPORATION 8906.00 0.00 303
2001 BELDEN & BLAKE CORPORATION 5205.00 0.00 318
2002 BELDEN & BLAKE CORPORATION 2045.00 0.00 293
2003 BELDEN & BLAKE CORPORATION 5646.00 0.00 365
2004 BELDEN & BLAKE CORPORATION 3471.00 0.00 366
2005 BELDEN & BLAKE CORPORATION 1204.00 0.00 221
2006 BELDEN & BLAKE CORPORATION 0.00 0.00 221
2008 ENERVEST OPERATING LLC 0.00 0.00 182
2009 ENERVEST OPERATING LLC 0.00 0.00 0
2010 ENERVEST OPERATING LLC 0.00 0.00 365
2011 ENERVEST OPERATING LLC 0.00 0.00 0
2012 ENERVEST OPERATING LLC 0.00 0.00 0
2013 ENERVEST OPERATING LLC 0.00 0.00 0
2014 ENERVEST OPERATING LLC 0.00 0.00 0
2015 ENERVEST OPERATING LLC 0.00 0.00 46

For data sources see[4] [5]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1994 DOMINION EAST OHIO Brine 2 365
1995 BELDEN & BLAKE CORPORATION Brine 0 151
1996 BELDEN & BLAKE CORPORATION Brine 0 366
1997 BELDEN & BLAKE CORPORATION Brine 0 365
1998 BELDEN & BLAKE CORPORATION Brine 0 365
1999 BELDEN & BLAKE CORPORATION Brine 0 365
2000 BELDEN & BLAKE CORPORATION Brine 0 303
2001 BELDEN & BLAKE CORPORATION Brine 0 318
2002 BELDEN & BLAKE CORPORATION Brine 0 293
2003 BELDEN & BLAKE CORPORATION Brine 0 365
2004 BELDEN & BLAKE CORPORATION Brine 0 366
2005 BELDEN & BLAKE CORPORATION Brine 0 221
2006 BELDEN & BLAKE CORPORATION Brine 0 221
2008 ENERVEST OPERATING LLC Brine 0 182
2009 ENERVEST OPERATING LLC Brine 0 0
2010 ENERVEST OPERATING LLC Brine 0 365
2011 ENERVEST OPERATING LLC Brine 0
2012 ENERVEST OPERATING LLC Brine 0 0
2013 ENERVEST OPERATING LLC Brine 0 0
2014 ENERVEST OPERATING LLC Brine 0 0
2015 ENERVEST OPERATING LLC Brine 0 46

For data sources see[6] [7]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1381952165 2015-6-24 0:00: PB No Violations 7.00
-1653579859 2015-7-1 0:00:0 PB No Violations 3.00
-413458204 2015-7-16 0:00: PB No Violations
0003477490 2017-11-07 Final Restoration No Violations With Stephen Ochs (District Supervisor - Oil & Gas): I did a Final Restoration inspection for this well. The well was plugged on 07-22-2015. The well site is graded and vegetated with no active erosion. There is no visual evidence of the well. The final restoration is passed.
0201087891 2015-07-21 Plug / Plug Back No Violations I was on location to witness the plugging of this well with 9 sack grout. The Berea Sandstone plug was tagged at 750. 2.375 diameter tubing was run into the well and 6.5 cubic yards of 19ppg grout were poured into the wellbore. The 9 sack grout displaced the wellbore full of fluid into the half round on location through the 2.375 diameter tubing. The cement plug will be tagged in the morning and an additional 9 sack grout plug will be set. There was no indication of the well gassing or have gas cut cement.
0413458204 2015-07-16 Plug / Plug Back No Violations I was on location to check the status of drilling out the failed cement plugs on this well. The Bishop service rig has drilled out the top plug from 0-260. The rig is reaming and attempting to find the top of the Berea Sandstone/Bottom of Surface Casing plug. The well will be re-plugged when the cement plug is found.
0459418328 2015-07-21 Plug / Plug Back No Violations I was on location to witness the plugging of this well with 9 sack grout. The previous plug was tagged at 217. 2.375 diameter tubing was run into the well and 3.5 cubic yards of 19ppg grout were poured into the wellbore. The 9 sack grout displaced the wellbore full of fluid into the half round on location through the 2.375 diameter tubing. The grout plug was brought to surface. The grout plug will be tagged in the morning to ensure it did not fall from surface. There was no indication of the well gassing or have gas cut cement.
0760772060 2015-06-30 Plug / Plug Back No Violations I was on location to witness the plugging of this well. The Bishop Well Service rig ran 2939 of 1.5 diameter tubing and Petroset pumped a 300 75sk 2% gel Big Lime plug and was displaced with 7bbls of brine. The tubing was pulled to 844 and a 250 65sk 2% gel bottom of surface and Berea Sandstone cement plug was pumped and displaced with 1.5bbls of fresh water. The tubing was pulled to 250 and a 75sk surface plug was set over the Pennsylvanian formation. The plug circulated but circulation was lost when the cement was being displaced. The cement plug did not return to surface and it is believed it is being lost in a thief zone downhole. The plug will be tagged in the morning and the cement plug topped off to surface if no issues are encountered.
0979266038 2015-07-14 Plug / Plug Back No Violations I was on location to check the status of Bishop Well Service drilling out this well. The rig had loss circulation at 100 and had to mix mud with cottonseed hulls. Circulation was established and the rig is currently drilling out the cement plug at 140 with no losses. The rig will continue to drill out the plug completely.
1381952165 2015-06-24 Plug / Plug Back No Violations I was on location to witness the plugging of this well. 1.5 diameter tubing was installed to 4487 into the wellbore. Petroset pumped a 25sk 2% gel cement slurry bottom plug and displaced it with 10.5bbls of brine. The tubing was pulled from the well and loaded with water. Appalachian Well Services was on location and logged the well from 3500 to surface to try to identify the location of the packer. The packer was not found on the Bond Log. It was decided to cut the 3 diameter tubing at 3100 and attempt to pull the tubing from the well. The tubing would not pull from the well and decided that Petroset Cementing would be on location in an attempt to circulate the well and remove blockages and possible fireclay used to mud the tubing into the 5 diameter casing. The 3 tubing and 5 diameter casing were not on casing hangers, indicating that they may be mudded in place. It is also not known if any modifications have been made to the well since drilling.
1424275795 2015-02-18 Production Wells Violations Noted I was on location to perform an inspection on this production well. The well has 4.5 diameter casing and a master gate valve present. Production equipment is not present. The well formally provided gas to the farm buildings on the property through a house gas connection. The property owner stated that the well no longer provides gas to the property. Production has never been filed for this well. This well is incapable of production. This well shall be plugged per Ohio Revised Code 1509.12(B) within 180 days.
1435252100 2015-06-25 Plug / Plug Back No Violations I was on location to witness the plugging of this well. Petroset was on location and circulated the 3 diameter tubing free. The well then began to flow green oil which indicates it may be from the Berea Sandstone. The flow of oil stopped and the 3 diameter tubing was pulled from the well. The 5 diameter casing will be shot off tomorrow and pulled from the well.
1435596655 2015-06-29 Plug / Plug Back No Violations I was on location to witness the plugging of this well. The Bishop Well Service rig is running 1.5 diameter tubing to 2930. Petroset cementing will be on location 6-30-15 to circulate the wellbore to clean up any oil and light cuttings. The Big Lime, Bottom of Surface/Berea and Surface plugs will be set and the pipe will be pulled.
1436208828 2015-07-06 Plug / Plug Back No Violations I was on location to check the plugs set in this well. The well is bubbling and it appears the well has gas cut cement. The Bishop Service rig is setting up today with a power swivel to drill out the cement plugs and replug the well. The drilling of the cement will occur on 7-8-2015.
1436364364 2015-07-08 Plug / Plug Back No Violations I was on location to check the status of drilling out the surface plug for this well. The Bishop Service rig is currently drilling 4min a foot at 26. They will continue to drill out the 250 surface plug and will tag the Berea plug to determine its depth.
1437655725 2015-07-22 Plug / Plug Back No Violations I was on location to check for the success of the plugging of this well. The well has been plugged to surface and is not leaking gas. The 9 sack grout fell 10 and was topped off with 5 bags of sakrete. The Bishop Well Service crew is going to cut the casing below grade and attach a steel plate with the API number on it. The compliance notice issued to plug this well can now be closed.
1653579859 2015-07-01 Plug / Plug Back No Violations I was on location to check the cement plugs set on 6-30-2015. The top cement plug is currently bubbling and the Spherian PHD6 gas meter indicates the bubbling is indeed leaking gas. The plugs will be drilled out on 7-6-2015 and the well will be replugged.
201087891 2015-7-21 0:00: PB No Violations 3.50
3477490 2017-11-7 0:00: FR No Violations 0.50
459418328 2015-7-21 0:00: PB No Violations 4.00
760772060 2015-6-30 0:00: PB No Violations 4.00
979266038 2015-7-14 0:00: PB No Violations 2.00

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
1424275795 US-OH-112364 2015-07-27 Well shall be plugged
1424275795 US-OH-112365 2015-07-27 Statement of annual production not filed

For data sources see[8]

References