If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-153-20561 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.05,"lon":-81.47,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: <County> | |
| Municipality: | |
| Operator Name: GOODYEAR TIRE & RUBBER | |
| Well Pad ID: | |
| Farm/Lease Name: GOODYEAR AKRON | |
| License Status: Final Restoration | |
| License Date: 2008-06-24 | |
| Spud Date: 1977-03-21 | |
| Spud Drilling Contractor: | |
| Final Drill Date: 1977-04-08 | |
| Well Total Depth: 3990.00 ft | |
| Configuration: Vertical | |
| Latitude: 41.050000 | |
| Longitude: -81.470000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| CO | 1977-03-08 | 518 GOODYEAR TIRE & RUBBER GeoDate 3/8/77 |
| Original Spud | 1977-03-21 | EB-999.45 |
| Completed | 1977-04-08 | EB-999.45 |
| Reached Total Depth | 1977-04-08 | EB-999.45 |
| APP | 2008-06-24 | Proposed Formations:CLINTON, Issued Date:6/24/2008, Expired Date:6/24/2009 6:00:00 AM, Drilling unit acres:0, Proposed Well Type:OG, Proposed Well Class: |
| Plugged/Abandoned | 2008-08-28 | EB-999.45 |
| Construction Permit Expires | 2009-06-24 | EB-999.45 |
| Record Last Modified | 2013-08-06 | EB-999.45 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2006-09-11 | 3892 | 3901 | 4 |
| 2006-09-11 | 3867 | 3879 | 4 |
| 3867 | 3879 | 4 | |
| 3867 | 3879 | 4 | |
| 2006-09-11 | 3922 | 3924 | 3 |
| 2006-09-11 | 3910 | 3919 | 4 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 0 | 80000 Gal | 60000 |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1984 | GOODYEAR TIRE & RUBBER | 124115.00 | 291.00 | 365 |
| 1985 | GOODYEAR TIRE & RUBBER | 76953.00 | 252.00 | 0 |
| 1986 | GOODYEAR TIRE & RUBBER | 30024.00 | 271.00 | 365 |
| 1987 | GOODYEAR TIRE & RUBBER | 42842.00 | 245.00 | 365 |
| 1988 | GOODYEAR TIRE & RUBBER | 13972.00 | 172.00 | 365 |
| 1989 | GOODYEAR TIRE & RUBBER | 11949.00 | 185.00 | 365 |
| 1990 | GOODYEAR TIRE & RUBBER | 23267.00 | 186.00 | 365 |
| 1991 | GOODYEAR TIRE & RUBBER | 40983.00 | 184.00 | 365 |
| 1992 | GOODYEAR TIRE & RUBBER | 55556.00 | 431.00 | 365 |
| 1993 | GOODYEAR TIRE & RUBBER | 58856.00 | 252.00 | 365 |
| 1994 | GOODYEAR TIRE & RUBBER | 25052.00 | 228.00 | 365 |
| 1995 | GOODYEAR TIRE & RUBBER | 15705.00 | 208.00 | 245 |
| 1996 | GOODYEAR TIRE & RUBBER | 33409.00 | 273.00 | 300 |
| 1997 | GOODYEAR TIRE & RUBBER | 33522.00 | 160.00 | 0 |
| 1998 | GOODYEAR TIRE & RUBBER | 9148.00 | 79.00 | 365 |
| 1999 | GOODYEAR TIRE & RUBBER | 1510.00 | 0.00 | 365 |
| 2000 | GOODYEAR TIRE & RUBBER | 1294.00 | 192.00 | 365 |
| 2001 | GOODYEAR TIRE & RUBBER | 1186.00 | 127.00 | 365 |
| 2002 | GOODYEAR TIRE & RUBBER | 876.00 | 0.00 | 365 |
| 2003 | GOODYEAR TIRE & RUBBER | 3084.00 | 191.00 | 365 |
| 2004 | GOODYEAR TIRE & RUBBER | 2171.00 | 210.00 | 365 |
| 2005 | GOODYEAR TIRE & RUBBER | 1565.00 | 0.00 | 365 |
| 2006 | GOODYEAR TIRE & RUBBER | 1031.00 | 0.00 | 365 |
| 2007 | GOODYEAR TIRE & RUBBER | 0.00 | 0.00 | 365 |
| 2008 | GOODYEAR TIRE & RUBBER | 0.00 | 140.00 | 0 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -862329704 | 2008-8-26 0:00: | PB | No Violations | |
| 0862329704 | 2008-08-26 | Plug / Plug Back | No Violations | Whipstock is rigging up over the hole to start plugging operations tomorrow. The well is recessed inside a concrete vault and will required special consideration during the plugging operation. |
| 1375279538 | 2013-07-30 | Final Restoration | No Violations | No indication of well equipment, access road, or tank battery. |
For data sources see[9]