If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-21047 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.15,"lon":-81.58,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: PINE TOP INC | |
Well Pad ID: | |
Farm/Lease Name: MALOYAN R& NN | |
License Status: Producing | |
License Date: 1981-12-11 | |
Spud Date: 1981-12-20 | |
Spud Drilling Contractor: | |
Final Drill Date: 1982-01-05 | |
Well Total Depth: 3653.00 ft | |
Configuration: Vertical | |
Latitude: 41.150000 | |
Longitude: -81.580000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1981-12-11 | 570 PINE TOP INC GeoDate 12/11/81 |
Original Spud | 1981-12-20 | |
Completed | 1982-01-05 | |
Reached Total Depth | 1982-01-05 | |
Record Last Modified | 2013-10-03 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 3478 | 3492 | 29 |
3478 | 3492 | 29 | |
3478 | 3492 | 29 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 1353 Bbl | 60000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1985 | PINE TOP INC | 24867.00 | 3869.00 | 0 |
1988 | PINE TOP INC | 6561.00 | 1682.00 | 365 |
1989 | PINE TOP INC | 6111.00 | 1688.00 | 365 |
1990 | PINE TOP INC | 5772.00 | 1301.00 | 365 |
1991 | PINE TOP INC | 5877.00 | 1156.00 | 365 |
1992 | PINE TOP INC | 5211.00 | 1240.00 | 365 |
1993 | PINE TOP INC | 10149.00 | 1417.00 | 365 |
1994 | PINE TOP INC | 8414.00 | 1271.00 | 365 |
1995 | PINE TOP INC | 8472.00 | 1034.00 | 371 |
1996 | PINE TOP INC | 8621.00 | 1030.00 | 353 |
1997 | PINE TOP INC | 8621.00 | 1030.00 | 365 |
1998 | PINE TOP INC | 4015.00 | 459.00 | 365 |
1999 | PINE TOP INC | 2724.00 | 224.00 | 365 |
2000 | PINE TOP INC | 502.00 | 0.00 | 365 |
2001 | PINE TOP INC | 180.00 | 64.00 | 365 |
2002 | PINE TOP INC | 0.00 | 0.00 | 365 |
2003 | PINE TOP INC | 506.00 | 0.00 | 365 |
2004 | PINE TOP INC | 416.00 | 0.00 | 365 |
2005 | PINE TOP INC | 514.00 | 0.00 | 365 |
2006 | PINE TOP INC | 632.00 | 0.00 | 365 |
2007 | PINE TOP INC | 244.00 | 0.00 | 365 |
2009 | PINE TOP INC | 377.00 | 0.00 | 365 |
2010 | PINE TOP INC | 743.00 | 0.00 | 365 |
2011 | PINE TOP INC | 1218.00 | 0.00 | 365 |
2012 | PINE TOP INC | 1288.00 | 0.00 | 366 |
2013 | PINE TOP INC | 904.00 | 56.00 | 365 |
2014 | PINE TOP INC | 137.00 | 68.00 | 365 |
2015 | PINE TOP INC | 0.00 | 0.00 | 365 |
2016 | PINE TOP INC | 0.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1985 | PINE TOP INC | Brine | 0 | 0 |
1988 | PINE TOP INC | Brine | 0 | 365 |
1989 | PINE TOP INC | Brine | 30 | 365 |
1990 | PINE TOP INC | Brine | 24 | 365 |
1991 | PINE TOP INC | Brine | 0 | 365 |
1992 | PINE TOP INC | Brine | 80 | 365 |
1993 | PINE TOP INC | Brine | 200 | 365 |
1994 | PINE TOP INC | Brine | 410 | 365 |
1995 | PINE TOP INC | Brine | 193 | 371 |
1996 | PINE TOP INC | Brine | 285 | 353 |
1997 | PINE TOP INC | Brine | 285 | 365 |
1998 | PINE TOP INC | Brine | 1571 | 365 |
1999 | PINE TOP INC | Brine | 2027 | 365 |
2000 | PINE TOP INC | Brine | 997 | 365 |
2001 | PINE TOP INC | Brine | 748 | 365 |
2002 | PINE TOP INC | Brine | 0 | 365 |
2003 | PINE TOP INC | Brine | 0 | 365 |
2004 | PINE TOP INC | Brine | 0 | 365 |
2005 | PINE TOP INC | Brine | 0 | 365 |
2006 | PINE TOP INC | Brine | 0 | 365 |
2007 | PINE TOP INC | Brine | 0 | 365 |
2009 | PINE TOP INC | Brine | 0 | 365 |
2010 | PINE TOP INC | Brine | 0 | 365 |
2011 | PINE TOP INC | Brine | 0 | 365 |
2012 | PINE TOP INC | Brine | 0 | 366 |
2013 | PINE TOP INC | Brine | 0 | 365 |
2014 | PINE TOP INC | Brine | 275 | 365 |
2015 | PINE TOP INC | Brine | 0 | 365 |
2016 | PINE TOP INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-2144637596 | 2009-3-31 0:00: | PW | No Violations | |
-940810523 | 2009-3-17 0:00: | PW | No Violations | |
0940810523 | 2009-03-17 | Production Wells | No Violations | CASE 09-006 The Uniontown office received a call from Brian Thomas at 2136 Yellowcreek Road in old Northampton Township. The Maloyan tank battery is located approximately 150 northeast of his house. According to Mr. Thomas, he has called Pine Top four times in the past month to get a gas odor corrected and to cover an exposed flowline. A backhoe arrived on the day he called Uniontown with the complaint. According to Tony Carlisle, the odor originated with two leaks in the salesline located under the lease road, which he uncovered and clamped. The exposed flowline was due to erosion along the lease road caused by heavy rain. He stated that the road would be repaired as soon as weather permitted. I relayed this information to Mr. Thomas via a telephone message. |
1556281566 | 2019-04-25 | Production Wells | Violations Noted | My inspection found that the well is equipped with a pumpjack overgrown with vegetation. There is a domestic gas connection which was off. The tank battery consists of a 100--11-05(B), and plug the well within 180 days. The well owner/operator will be notified if the plugging schedule is approved or denied. |
1580324068 | 2020-1-28 0:00: | UP | No Violations | |
1596040247 | 2020-7-29 0:00: | UP | No Violations | 0.10 |
2144637596 | 2009-03-31 | Production Wells | No Violations | The lease road washout has been repaired as requested. No violations at this time. |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
1556281566 | US-OH-115161 | 2019-05-06 | 9-9-05(A)10 | Failure to legibly identify well |
1556281566 | US-OH-115162 | 2019-05-06 | NONE | Well shall be plugged |
For data sources see[9]