X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-153-21142

Well Details

Well ID: 34-153-21142
Loading map...
Country: United States
State: Ohio
County: <County>
Municipality:
Operator Name: BELDEN & BLAKE CORPORATION
Well Pad ID:
Farm/Lease Name: FLETCHER
License Status: Plugged and Abandoned
License Date: 2000-12-01
Spud Date: 1982-05-28
Spud Drilling Contractor: CUBBY DRLG
Final Drill Date: 1982-06-05
Well Total Depth: 4020.00 ft
Configuration: Vertical
Latitude: 41.270000
Longitude: -81.450000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1982-05-10 140 KST OIL & GAS CO INC GeoDate 5/10/82
Oil and Gas 1982-05-10 Issued Date 5/10/82 Expired Date 11/1/82 Acres 0020000 Tool Type RTA Proposed Formation CLINTON Proposed Depth 04020 Proposed Drill Depth 04020
Original Spud 1982-05-31
Completed 1982-06-05
Reached Total Depth 1982-06-05
Completion Report Received 1982-07-21
CO 1995-12-05 182 BELDEN & BLAKE CO GeoDate 5/10/82
APP 2000-12-01 Proposed Formations:CLINTON, Issued Date:12/1/2000, Expired Date:12/1/2001 6:00:00 AM, Drilling unit acres:0, Proposed Well Type:OG, Proposed Well Class:
Plugged/Abandoned 2000-12-04
Construction Permit Expires 2001-12-01
Change of Owner 2007-04-27 Operator changed from 182, BELDEN & BLAKE CORPORATION to 7578, ENERVEST OPERATING LLC well was plugged prior to transfer
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 3854 3948 120
3886 3938 0
1997-06-29 3886 3938 0
3854 3948 120
3854 3948 120

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 115000 Gal 0 FRAC'D WITH 115,000 GALS WATER

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1984 DOMINION EAST OHIO 441.00 0.00 0
1985 KST OIL & GAS CO INC 18668.00 95.00 365
1986 KST OIL & GAS CO INC 12005.00 108.00 365
1987 KST OIL & GAS CO INC 6854.00 123.00 365
1988 DOMINION EAST OHIO 379.00 0.00 0
1989 KST OIL & GAS CO INC 4279.00 36.00 365
1990 DOMINION EAST OHIO 0.00 0.00 365
1991 KST OIL & GAS CO INC 4013.00 60.00 365
1992 DOMINION EAST OHIO 0.00 0.00 365
1993 KST OIL & GAS CO INC 3882.00 25.00 365
1994 DOMINION EAST OHIO 0.00 0.00 365
1995 KST OIL & GAS CO INC 1756.00 0.00 365
1996 BELDEN & BLAKE CORPORATION 1709.00 54.00 289
1997 BELDEN & BLAKE CORPORATION 2239.00 0.00 349
1998 BELDEN & BLAKE CORPORATION 2296.00 0.00 347
1999 BELDEN & BLAKE CORPORATION 1577.00 0.00 365
2000 BELDEN & BLAKE CORPORATION 1029.00 0.00 299

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1984 DOMINION EAST OHIO Brine 0 0
1985 KST OIL & GAS CO INC Brine 188 365
1986 KST OIL & GAS CO INC Brine 115 365
1987 KST OIL & GAS CO INC Brine 64 365
1988 DOMINION EAST OHIO Brine 0 0
1989 KST OIL & GAS CO INC Brine 70 365
1990 DOMINION EAST OHIO Brine 0 365
1991 KST OIL & GAS CO INC Brine 70 365
1992 DOMINION EAST OHIO Brine 0 365
1993 KST OIL & GAS CO INC Brine 25 365
1994 DOMINION EAST OHIO Brine 0 365
1995 KST OIL & GAS CO INC Brine 0 365
1996 BELDEN & BLAKE CORPORATION Brine 100 289
1997 BELDEN & BLAKE CORPORATION Brine 94 349
1998 BELDEN & BLAKE CORPORATION Brine 52 347
1999 BELDEN & BLAKE CORPORATION Brine 16 365
2000 BELDEN & BLAKE CORPORATION Brine 17 299

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0000PL4806 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point
001240i147 2000-12-04 Plug / Plug Back No Violations ON SITE 08:30 AM TO COVER PLUG EQUIPMENT JUST ARRIVED GETTING SET UP MIXED AND PUMPED PLUG AT 10:45 WELL PRESSURED UP TO1000# PSI WHEN DISPLACEMENT WAS REACHED.RIGGING UP TO RIP WILL START AT 2900 AN WORK UP TO RIP AT 2833 PULLEDUP TO 2355
1240i147 2000-12-4 0:00: PB No Violations
PL4806 PL No Violations

For data sources see[9]

References