If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-21237 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.27,"lon":-81.44,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: D & D ENERGY COMPANY | |
Well Pad ID: | |
Farm/Lease Name: MORIARTY-DRIVER | |
License Status: Producing | |
License Date: 1983-03-02 | |
Spud Date: 1983-03-27 | |
Spud Drilling Contractor: CUBBY DRLG | |
Final Drill Date: 1983-04-02 | |
Well Total Depth: 4052.00 ft | |
Configuration: Vertical | |
Latitude: 41.270000 | |
Longitude: -81.440000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1982-09-23 | 140 KST OIL & GAS CO INC GeoDate 9/23/82 |
Oil and Gas | 1982-09-23 | Issued Date 9/23/82 Expired Date 3/15/83 Acres 0045570 Tool Type RTA Proposed Formation CLINTON Proposed Depth 00000 Proposed Drill Depth 00000 |
CO | 1983-03-02 | 140 KST OIL & GAS CO INC GeoDate 3/2/83 |
Oil and Gas | 1983-03-02 | Issued Date 3/2/83 Expired Date 8/29/83 Acres 0045570 Tool Type RTA Proposed Formation CLINTON Proposed Depth 04052 Proposed Drill Depth 04052 |
Original Spud | 1983-03-27 | R.I. 3-5-83 |
Completed | 1983-04-02 | R.I. 3-5-83 |
Reached Total Depth | 1983-04-02 | R.I. 3-5-83 |
Completion Report Received | 1983-04-15 | R.I. 3-5-83 |
Construction Permit Expires | 1983-08-29 | R.I. 3-5-83 |
CO | 1995-12-12 | 182 BELDEN & BLAKE CO GeoDate 3/2/83 |
Change of Owner | 1997-06-23 | Operator changed from 182, BELDEN & BLAKE CO to 5601, MOORE WELL SERVICES INC |
Record Last Modified | 2017-02-15 | R.I. 3-5-83 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 3840 | 3926 | 0 |
3840 | 3926 | 0 | |
2006-09-11 | 3874 | 3926 | 156 |
3874 | 3926 | 156 | |
3840 | 3926 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 115000 Gal | 0 | FRAC;115MG H2O |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | KST OIL & GAS CO INC | 79054.00 | 463.00 | 365 |
1985 | KST OIL & GAS CO INC | 36064.00 | 243.00 | 365 |
1986 | KST OIL & GAS CO INC | 21495.00 | 152.00 | 365 |
1987 | KST OIL & GAS CO INC | 15139.00 | 72.00 | 365 |
1988 | KST OIL & GAS CO INC | 1715.00 | 96.00 | 365 |
1989 | KST OIL & GAS CO INC | 9424.00 | 137.00 | 365 |
1990 | KST OIL & GAS CO INC | 7440.00 | 112.00 | 365 |
1991 | KST OIL & GAS CO INC | 5956.00 | 64.00 | 365 |
1993 | KST OIL & GAS CO INC | 3787.00 | 62.00 | 365 |
1994 | KST OIL & GAS CO INC | 4059.00 | 0.00 | 365 |
1995 | KST OIL & GAS CO INC | 1995.00 | 78.00 | 365 |
1996 | BELDEN & BLAKE CORPORATION | 2935.00 | 62.00 | 366 |
1997 | BELDEN & BLAKE CORPORATION | 3318.00 | 0.00 | 358 |
1998 | BELDEN & BLAKE CORPORATION | 2241.00 | 91.00 | 260 |
1999 | BELDEN & BLAKE CORPORATION | 2039.00 | 18.00 | 351 |
2000 | BELDEN & BLAKE CORPORATION | 1208.00 | 40.00 | 331 |
2001 | BELDEN & BLAKE CORPORATION | 396.00 | 0.00 | 150 |
2002 | MOORE WELL SERVICES INC | 2049.00 | 26.00 | 351 |
2003 | MOORE WELL SERVICES INC | 2325.00 | 31.00 | 351 |
2004 | MOORE WELL SERVICES INC | 2105.00 | 13.00 | 365 |
2005 | MOORE WELL SERVICES INC | 2204.00 | 14.00 | 365 |
2006 | MOORE WELL SERVICES INC | 1822.00 | 54.00 | 357 |
2007 | MOORE WELL SERVICES INC | 1927.00 | 41.00 | 359 |
2008 | MOORE WELL SERVICES INC | 1979.00 | 41.00 | 365 |
2009 | MOORE WELL SERVICES INC | 2014.00 | 49.00 | 365 |
2010 | MOORE WELL SERVICES INC | 2246.00 | 46.00 | 365 |
2011 | MOORE WELL SERVICES INC | 1717.00 | 43.00 | 325 |
2012 | MOORE WELL SERVICES INC | 1827.00 | 24.00 | 366 |
2013 | MOORE WELL SERVICES INC | 2431.00 | 41.00 | 365 |
2014 | MOORE WELL SERVICES INC | 2121.00 | 14.00 | 365 |
2015 | MOORE WELL SERVICES INC | 1326.00 | 9.00 | 365 |
2016 | MOORE WELL SERVICES INC | 350.00 | 19.00 | 365 |
2017 | MOORE WELL SERVICES INC | 628.00 | 15.00 | 365 |
2018 | MOORE WELL SERVICES INC | 342.00 | 0.00 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-796458000 | 2017-9-19 0:00: | UP | No Violations | |
0000PL4755 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
0796458000 | 2017-09-19 | UrbanProduction Wells | No Violations | The access road was overgrown back to the tank battery. The well was operated as a plunger lift well. It was fenced and the I D signage was not legible. The tank battery consisted of one (1) 100 barrel stock tank, one (1) 50 barrel steel brine tank and a horizontal separator. The tank battery was surrounded with an earthen dike and locked chain link fence. The I D signage was not legible. There were rusted pipes and other non-essential material inside the tank battery. The brine tank appeared to have a bottom seam leak, but I could not confirm. I spoke with Jeff Moore ( Operator/Owner ) and requested that within one (1) week that the brine tanks integrity be confirmed, that the I D signage be replaced and remove all non-essential materials be removed. I also requested to be called when the tank is checked. Mr. Moore confirmed that this work shall be completed by 9/26/2017. |
1569333490 | 2019-9-24 0:00: | PW | No Violations | 1.00 |
PL4755 | PL | No Violations |
For data sources see[9]