If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-21366 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.14,"lon":-81.59,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: PINE TOP INC | |
Well Pad ID: | |
Farm/Lease Name: HINTON UNIT | |
License Status: Producing | |
License Date: 1983-03-21 | |
Spud Date: 1983-06-22 | |
Spud Drilling Contractor: MARTIN DRILLING | |
Final Drill Date: 1983-06-27 | |
Well Total Depth: 3876.00 ft | |
Configuration: Vertical | |
Latitude: 41.140000 | |
Longitude: -81.590000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1983-03-21 | 570 PINE TOP INC GeoDate 3/21/83 |
Oil and Gas | 1983-03-21 | Issued Date 3/21/83 Expired Date 9/17/83 Acres 0023180 Tool Type RTF Proposed Formation CLINTON Proposed Depth 03876 Proposed Drill Depth 03876 |
Original Spud | 1983-06-22 | FDT=SHALE |
Completed | 1983-06-27 | FDT=SHALE |
Reached Total Depth | 1983-06-27 | FDT=SHALE |
Completion Report Received | 1983-07-22 | FDT=SHALE |
Construction Permit Expires | 1983-09-17 | FDT=SHALE |
Record Last Modified | 2017-02-15 | FDT=SHALE |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 3655 | 3750 | 0 |
3655 | 3750 | 0 | |
2006-09-11 | 3689 | 3728 | 44 |
3689 | 3728 | 44 | |
3655 | 3750 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 1461 Bbl | 60000 | FRAC;H2O,SAND |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1988 | PINE TOP INC | 965.00 | 226.00 | 365 |
1989 | PINE TOP INC | 1451.00 | 486.00 | 365 |
1990 | PINE TOP INC | 1401.00 | 197.00 | 365 |
1991 | PINE TOP INC | 1382.00 | 240.00 | 365 |
1993 | PINE TOP INC | 525.00 | 266.00 | 365 |
1994 | PINE TOP INC | 307.00 | 127.00 | 365 |
1995 | PINE TOP INC | 345.00 | 269.00 | 308 |
1996 | PINE TOP INC | 333.00 | 130.00 | 219 |
1997 | PINE TOP INC | 233.00 | 117.00 | 365 |
1998 | PINE TOP INC | 244.00 | 122.00 | 365 |
1999 | PINE TOP INC | 208.00 | 129.00 | 365 |
2000 | PINE TOP INC | 269.00 | 117.00 | 365 |
2001 | PINE TOP INC | 182.00 | 111.00 | 365 |
2002 | PINE TOP INC | 272.00 | 116.00 | 365 |
2003 | PINE TOP INC | 319.00 | 0.00 | 365 |
2004 | PINE TOP INC | 256.00 | 0.00 | 365 |
2005 | PINE TOP INC | 63.00 | 0.00 | 365 |
2006 | PINE TOP INC | 96.00 | 0.00 | 365 |
2007 | PINE TOP INC | 191.00 | 73.00 | 365 |
2009 | PINE TOP INC | 410.00 | 79.00 | 365 |
2011 | PINE TOP INC | 297.00 | 68.00 | 365 |
2012 | PINE TOP INC | 292.00 | 0.00 | 366 |
2013 | PINE TOP INC | 273.00 | 71.00 | 365 |
2014 | PINE TOP INC | 221.00 | 58.00 | 365 |
2015 | PINE TOP INC | 119.00 | 0.00 | 365 |
2016 | PINE TOP INC | 23.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1988 | PINE TOP INC | Brine | 26 | 365 |
1989 | PINE TOP INC | Brine | 19 | 365 |
1990 | PINE TOP INC | Brine | 72 | 365 |
1991 | PINE TOP INC | Brine | 65 | 365 |
1993 | PINE TOP INC | Brine | 30 | 365 |
1994 | PINE TOP INC | Brine | 40 | 365 |
1995 | PINE TOP INC | Brine | 0 | 308 |
1996 | PINE TOP INC | Brine | 0 | 219 |
1997 | PINE TOP INC | Brine | 190 | 365 |
1998 | PINE TOP INC | Brine | 50 | 365 |
1999 | PINE TOP INC | Brine | 0 | 365 |
2000 | PINE TOP INC | Brine | 50 | 365 |
2001 | PINE TOP INC | Brine | 0 | 365 |
2002 | PINE TOP INC | Brine | 45 | 365 |
2003 | PINE TOP INC | Brine | 0 | 365 |
2004 | PINE TOP INC | Brine | 0 | 365 |
2005 | PINE TOP INC | Brine | 0 | 365 |
2006 | PINE TOP INC | Brine | 0 | 365 |
2007 | PINE TOP INC | Brine | 320 | 365 |
2009 | PINE TOP INC | Brine | 0 | 365 |
2011 | PINE TOP INC | Brine | 0 | 365 |
2012 | PINE TOP INC | Brine | 50 | 366 |
2013 | PINE TOP INC | Brine | 50 | 365 |
2014 | PINE TOP INC | Brine | 45 | 365 |
2015 | PINE TOP INC | Brine | 0 | 365 |
2016 | PINE TOP INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1005611932 | 2007-5-1 0:00:0 | PW | No Violations | |
-1455212329 | 2007-3-26 0:00: | PW | No Violations | |
-205173540 | 2019-4-9 0:00:0 | PW | No Violations | 0.60 |
-30793161 | 2007-9-7 0:00:0 | PW | No Violations | |
-849293637 | 2016-3-15 0:00: | UP | No Violations | |
0000PL4674 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
0003679178 | 2002-02-20 | Production Wells | No Violations | Noise complaint called in by Bill Snow (330-666-4007), Bath Twp. Admin., which he received from the resident at 908 N. Revere Rd. on 2-20-2002. I inspected the well and tank battery; NO VIOLATIONS. I went to the residence a 908 N. Revere, nobody was home. I met with Bill Snow at the Bath twp offices and informed him of my inspection. I also called Pine Top (330-929-2492) and left a message for the pumper to check the electric motor on the pumping unit. See Case #02-004 |
0030793161 | 2007-09-07 | Production Wells | No Violations | The pollution violation has been corrected. No violations at this time. |
0205173540 | 2019-04-09 | Production Wells | No Violations | My inspection found the well equipped with a pumpjack. The well has no Annual Production Report for 2017. The tank battery consists of a steel production tank, a steel brine tank and a horizontal separator. There is identification but contact numbers are not current. The well and tank battery are fenced and gated. Only the tank battery is locked. Both the well and tank battery are overgrown with vegetation. |
0849293637 | 2016-03-15 | UrbanProduction Wells | No Violations | The Hinton Unit # 1 was completed in 7 / 1983. A review of RBDMS data base indicated that the Operator was current in the filing of the production volumes. The well was constructed with 384 of 8.625 surface, 3829 of 4.5 production casing, 2.375 tubing and rods. The well was operated as a electric pumping well. The well was shut in due storm damage to the electric line. The well is surrounded by an earthen dike and chain link fencing. The tank battery consists of one (1) 100 barrel oil tank, one (1) 50 barrel steel brine tank and one (1) horizontal separator. The tank battery is surrounded by an earthen dike and chain link fence. The 3 load line had a valve freeze and split. I requested that Tony Carlisle ( Pine Top ) replace the valve and secure it with a plug asap. I will re-inspect the Hinton Unit # 1 tank battery to insure the requested work is completed. |
1005611932 | 2007-05-01 | Production Wells | No Violations | The impacted lawn area has been removed but still needs reclaimed. The new salesline trench also needs reclaimed. |
1175110212 | 2007-03-16 | Production Wells | Violations Noted | I received a call from Tony Carlisle reporting a crude oil/brine release from the Hinton Unit #1 tank battery. The release originated with the 210 bbl stock tank, entered a drain tile adjacent to the tank battery, surfaced 40 northeast of the tank battery and traveled north across a lawn. No surface waters were impacted. Jim Erwin with OEPA was notified and also responded. The lawn area was water saturated and considerable collateral damage would have been done while removing the impacted grass. Since the spill was contained by spreading peat and installing a siphon dam, Pine Top was given additional time to remove the grass. The tank battery however, needs immediate attention. The free oil must be removed and the impacted drain tile needs to be cleaned out. |
1175259852 | 2007-03-28 | Production Wells | No Violations | Pine Top has retained Moore Well Service to work on the spill remediation and they are scheduled to start later today. |
1176477861 | 2007-04-09 | Production Wells | No Violations | The sales line has been replaced but needs to be reclaimed. The scald area still needs to be removed, the tank battery rebuilt and the site reclaimed. |
1455212329 | 2007-03-26 | Production Wells | No Violations | Additional oil has accumulated in the tank battery. I called Tony Carlisle and instructed him to dismantle the tank battery completely, remove and properly dispose impacted gravel and soil, and replace any faulty equipment. |
1548541777 | 2007-03-19 | Production Wells | No Violations | Spill remediation inside of the containment dike will continue. |
3679178 | 2002-2-20 0:00: | PW | No Violations | 1.50 |
PL4674 | PL | No Violations |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
1175110212 | US-OH-104635 | 2007-03-28 | Well operation causing pollution and contamination |
For data sources see[9]