If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-21419 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.27,"lon":-81.5,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: D & D ENERGY COMPANY | |
Well Pad ID: | |
Farm/Lease Name: BOKUN | |
License Status: Producing | |
License Date: 1984-04-25 | |
Spud Date: 1984-06-15 | |
Spud Drilling Contractor: CVAS DRLG | |
Final Drill Date: 1984-06-19 | |
Well Total Depth: 3865.00 ft | |
Configuration: Vertical | |
Latitude: 41.270000 | |
Longitude: -81.500000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1983-12-01 | 140 KST OIL & GAS CO INC GeoDate 12/1/83 |
Oil and Gas | 1983-12-01 | Issued Date 12/1/83 Expired Date 10/22/84 Acres 0023299 Tool Type CRAF Proposed Formation CLINTON Proposed Depth 00000 Proposed Drill Depth 00000 |
CO | 1984-04-25 | 140 KST OIL & GAS CO INC GeoDate 4/25/84 |
Oil and Gas | 1984-04-25 | Issued Date 4/25/84 Expired Date 10/22/84 Acres 0023299 Tool Type RTA Proposed Formation CLINTON Proposed Depth 03865 Proposed Drill Depth 03865 |
Original Spud | 1984-06-15 | R.I. 12-3-83, R.I. 4-28-84 |
Completed | 1984-06-19 | R.I. 12-3-83, R.I. 4-28-84 |
Reached Total Depth | 1984-06-19 | R.I. 12-3-83, R.I. 4-28-84 |
Completion Report Received | 1984-08-08 | R.I. 12-3-83, R.I. 4-28-84 |
Construction Permit Expires | 1984-10-22 | R.I. 12-3-83, R.I. 4-28-84 |
CO | 1995-12-05 | 182 BELDEN & BLAKE CO GeoDate 4/25/84 |
Change of Owner | 2001-05-24 | Operator changed from 182, BELDEN & BLAKE CORPORATION to 5601, MOORE WELL SERVICES INC |
Record Last Modified | 2017-02-15 | R.I. 12-3-83, R.I. 4-28-84 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 3590 | 3694 | 0 |
3590 | 3694 | 0 | |
2006-09-11 | 3638 | 3655 | 54 |
3638 | 3655 | 54 | |
3590 | 3694 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 96000 Gal | 0 | FRAC: H2O |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | KST OIL & GAS CO INC | 7061.00 | 104.00 | 365 |
1985 | KST OIL & GAS CO INC | 31822.00 | 321.00 | 365 |
1986 | KST OIL & GAS CO INC | 14545.00 | 161.00 | 365 |
1987 | KST OIL & GAS CO INC | 9433.00 | 99.00 | 365 |
1988 | KST OIL & GAS CO INC | 8241.00 | 48.00 | 365 |
1989 | KST OIL & GAS CO INC | 8387.00 | 56.00 | 365 |
1990 | KST OIL & GAS CO INC | 7169.00 | 54.00 | 365 |
1991 | KST OIL & GAS CO INC | 5032.00 | 59.00 | 365 |
1993 | KST OIL & GAS CO INC | 4608.00 | 48.00 | 365 |
1994 | KST OIL & GAS CO INC | 4216.00 | 54.00 | 365 |
1995 | KST OIL & GAS CO INC | 2532.00 | 0.00 | 365 |
1996 | BELDEN & BLAKE CORPORATION | 2830.00 | 66.00 | 364 |
1997 | BELDEN & BLAKE CORPORATION | 3054.00 | 0.00 | 344 |
1998 | BELDEN & BLAKE CORPORATION | 2480.00 | 56.00 | 323 |
1999 | BELDEN & BLAKE CORPORATION | 1250.00 | 0.00 | 258 |
2000 | BELDEN & BLAKE CORPORATION | 838.00 | 0.00 | 194 |
2001 | MOORE WELL SERVICES INC | 0.00 | 0.00 | 0 |
2002 | MOORE WELL SERVICES INC | 2065.00 | 0.00 | 351 |
2003 | MOORE WELL SERVICES INC | 2601.00 | 11.00 | 351 |
2004 | MOORE WELL SERVICES INC | 2316.00 | 18.00 | 365 |
2005 | MOORE WELL SERVICES INC | 2122.00 | 5.00 | 365 |
2006 | MOORE WELL SERVICES INC | 1911.00 | 10.00 | 357 |
2007 | MOORE WELL SERVICES INC | 1804.00 | 12.00 | 359 |
2008 | MOORE WELL SERVICES INC | 1802.00 | 5.00 | 365 |
2009 | MOORE WELL SERVICES INC | 1971.00 | 15.00 | 365 |
2010 | MOORE WELL SERVICES INC | 1751.00 | 0.00 | 365 |
2011 | MOORE WELL SERVICES INC | 1566.00 | 10.00 | 325 |
2012 | MOORE WELL SERVICES INC | 1578.00 | 10.00 | 366 |
2013 | MOORE WELL SERVICES INC | 1350.00 | 0.00 | 365 |
2014 | MOORE WELL SERVICES INC | 1203.00 | 15.00 | 365 |
2015 | MOORE WELL SERVICES INC | 2159.00 | 0.00 | 365 |
2016 | MOORE WELL SERVICES INC | 4673.00 | 11.00 | 365 |
2017 | MOORE WELL SERVICES INC | 2671.00 | 0.00 | 365 |
2018 | MOORE WELL SERVICES INC | 1662.00 | 0.00 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0472102403 | 2007-06-14 | Production Wells | No Violations | The Uniontown office received a request from Atty. Bill Williams to inspect this site for his client, the property owner. The owner plans to develop the property and was concerned about the flowline depth and location. My inspection found that the flowline is buried from the wellhead to the intersection with the Buckeye and North Coast transmission pipelines. The depth of burial was approximately 12 to 18 inches, where it could be determined. The flowline is exposed at the surface from the transmission pipelines to the Moore tank battery. OAC 1501:9-10-05 allows for burial exemptions in certain cases. In this case, 1) it is not reasonably expected that the property would be cultivated and 2) the potential negative environmental impact from encountering the high pressure/high volume transmission pipelines is greater than the potential environmental impact from the 2 inch flowline. According to Bob Moore, the two parties have been in negotiations to relocate the flowline in order to minimize the contact with the proposed site development. |
472102403 | 2007-6-14 0:00: | PW | No Violations |
For data sources see[9]