If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-22241 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.17,"lon":-81.61,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Summit | |
Municipality: Bath Township | |
Operator Name: ST CROIX LTD | |
Well Pad ID: | |
Farm/Lease Name: FRANKLIN/SCHIESSWOHL | |
License Status: Producing | |
License Date: 1985-12-27 | |
Spud Date: 1986-02-24 | |
Spud Drilling Contractor: RAPID DRILLING | |
Final Drill Date: 1986-03-05 | |
Well Total Depth: 3688.00 ft | |
Configuration: Vertical | |
Latitude: 41.170000 | |
Longitude: -81.610000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1985-12-27 | 2364 ST CROIX LTD GeoDate 12/27/85 |
Oil and Gas | 1985-12-27 | Issued Date 12/27/85 Expired Date 12/27/86 Acres 0020000 Tool Type CRF Proposed Formation CLINTON Proposed Depth 03688 Proposed Drill Depth 03688 |
Original Spud | 1986-02-23 | |
Completed | 1986-03-05 | |
Reached Total Depth | 1986-03-05 | |
Completion Report Received | 1986-03-24 | |
Construction Permit Expires | 1986-12-27 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 3524 | 3564 | 22 |
3524 | 3564 | 22 | |
3524 | 3564 | 22 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
ACID | 0 | 500 Gal | 0 | |||
H2O | 0 | 1950 Bbl | 0 | FRAC;H2O |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1987 | ST CROIX LTD | 31499.00 | 2197.00 | 162 |
1988 | ST CROIX LTD | 20900.00 | 1323.00 | 365 |
1989 | ST CROIX LTD | 13651.00 | 840.00 | 365 |
1990 | ST CROIX LTD | 7081.00 | 329.00 | 365 |
1991 | ST CROIX LTD | 5310.00 | 246.00 | 365 |
1992 | ST CROIX LTD | 4743.00 | 228.00 | 365 |
1993 | ST CROIX LTD | 4790.00 | 136.00 | 365 |
1994 | ST CROIX LTD | 2438.00 | 132.00 | 365 |
1995 | ST CROIX LTD | 1633.00 | 130.00 | 365 |
1996 | ST CROIX LTD | 2022.00 | 102.00 | 365 |
1997 | ST CROIX LTD | 1905.00 | 234.00 | 365 |
1998 | ST CROIX LTD | 924.00 | 68.00 | 365 |
1999 | ST CROIX LTD | 686.00 | 58.00 | 365 |
2000 | ST CROIX LTD | 995.00 | 76.00 | 365 |
2001 | ST CROIX LTD | 820.00 | 60.00 | 365 |
2002 | ST CROIX LTD | 611.00 | 68.00 | 365 |
2003 | ST CROIX LTD | 587.00 | 30.00 | 365 |
2004 | ST CROIX LTD | 702.00 | 95.00 | 365 |
2005 | ST CROIX LTD | 716.00 | 57.00 | 365 |
2006 | ST CROIX LTD | 687.00 | 51.00 | 365 |
2007 | ST CROIX LTD | 676.00 | 84.00 | 365 |
2008 | ST CROIX LTD | 642.00 | 20.00 | 365 |
2009 | ST CROIX LTD | 558.00 | 9.00 | 365 |
2010 | ST CROIX LTD | 555.00 | 34.00 | 365 |
2011 | ST CROIX LTD | 561.00 | 34.00 | 365 |
2012 | ST CROIX LTD | 573.00 | 28.00 | 366 |
2013 | ST CROIX LTD | 554.00 | 28.00 | 365 |
2014 | ST CROIX LTD | 554.00 | 16.00 | 365 |
2015 | ST CROIX LTD | 595.00 | 105.00 | 365 |
2016 | ST CROIX LTD | 0.00 | 0.00 | 0 |
2017 | ST CROIX LTD | 0.00 | 0.00 | 0 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1987 | ST CROIX LTD | Brine | 143 | 162 |
1988 | ST CROIX LTD | Brine | 0 | 365 |
1989 | ST CROIX LTD | Brine | 87 | 365 |
1990 | ST CROIX LTD | Brine | 20 | 365 |
1991 | ST CROIX LTD | Brine | 28 | 365 |
1992 | ST CROIX LTD | Brine | 0 | 365 |
1993 | ST CROIX LTD | Brine | 56 | 365 |
1994 | ST CROIX LTD | Brine | 20 | 365 |
1995 | ST CROIX LTD | Brine | 0 | 365 |
1996 | ST CROIX LTD | Brine | 11 | 365 |
1997 | ST CROIX LTD | Brine | 11 | 365 |
1998 | ST CROIX LTD | Brine | 20 | 365 |
1999 | ST CROIX LTD | Brine | 36 | 365 |
2000 | ST CROIX LTD | Brine | 20 | 365 |
2001 | ST CROIX LTD | Brine | 13 | 365 |
2002 | ST CROIX LTD | Brine | 20 | 365 |
2003 | ST CROIX LTD | Brine | 20 | 365 |
2004 | ST CROIX LTD | Brine | 3 | 365 |
2005 | ST CROIX LTD | Brine | 118 | 365 |
2006 | ST CROIX LTD | Brine | 71 | 365 |
2007 | ST CROIX LTD | Brine | 91 | 365 |
2008 | ST CROIX LTD | Brine | 10 | 365 |
2009 | ST CROIX LTD | Brine | 8 | 365 |
2010 | ST CROIX LTD | Brine | 35 | 365 |
2011 | ST CROIX LTD | Brine | 20 | 365 |
2012 | ST CROIX LTD | Brine | 10 | 366 |
2013 | ST CROIX LTD | Brine | 31 | 365 |
2014 | ST CROIX LTD | Brine | 43 | 365 |
2015 | ST CROIX LTD | Brine | 35 | 365 |
2016 | ST CROIX LTD | Brine | 0 | 0 |
2017 | ST CROIX LTD | Brine | 0 | 0 |