If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-22497 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.02,"lon":-81.55,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Summit | |
Municipality: Coventry Township | |
Operator Name: PIN OAK ENERGY PARTNERS LLC | |
Well Pad ID: | |
Farm/Lease Name: EAGON UNIT | |
License Status: Producing | |
License Date: 1988-07-06 | |
Spud Date: 1989-02-01 | |
Spud Drilling Contractor: [[P&R INC [PEEK & ROWAN]]] | |
Final Drill Date: 1989-02-08 | |
Well Total Depth: 3975.00 ft | |
Configuration: Vertical | |
Latitude: 41.020000 | |
Longitude: -81.550000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1988-07-06 | Issued Date 7/6/88 Expired Date 7/6/89 Acres 0020572 Tool Type CRAF Proposed Formation CLINTON Proposed Depth 03975 Proposed Drill Depth 03975 |
Original Spud | 1989-02-02 | |
Completed | 1989-02-08 | |
Reached Total Depth | 1989-02-08 | |
Completion Report Received | 1989-05-25 | |
CO | 1989-05-30 | 169 SMAIL JAMES R GeoDate 7/6/88 |
Construction Permit Expires | 1989-07-06 | |
Change of Owner | 2018-11-29 | Operator changed from 169, JAMES R SMAIL INC to 9722, PIN OAK ENERGY PARTNERS LLC |
Record Last Modified | 2018-11-29 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 3788 | 3880 | 0 |
3788 | 3880 | 0 | |
2006-09-11 | 3821 | 3859 | 22 |
3821 | 3859 | 22 | |
3788 | 3880 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
0 | 0 | 0 | FRAC:SAND/WATER |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1989 | JAMES R SMAIL INC | 9081.00 | 1455.00 | 182 |
1990 | JAMES R SMAIL INC | 20043.00 | 2052.00 | 365 |
1991 | JAMES R SMAIL INC | 12555.00 | 1372.00 | 365 |
1992 | JAMES R SMAIL INC | 9425.00 | 1489.00 | 365 |
1993 | JAMES R SMAIL INC | 7537.00 | 1089.00 | 365 |
1994 | JAMES R SMAIL INC | 8076.00 | 982.00 | 365 |
1995 | JAMES R SMAIL INC | 7890.00 | 946.00 | 365 |
1996 | JAMES R SMAIL INC | 6002.00 | 656.00 | 365 |
1997 | JAMES R SMAIL INC | 5929.00 | 804.00 | 365 |
1998 | JAMES R SMAIL INC | 5275.00 | 722.00 | 365 |
1999 | JAMES R SMAIL INC | 5260.00 | 616.00 | 365 |
2000 | JAMES R SMAIL INC | 5345.00 | 312.00 | 365 |
2001 | JAMES R SMAIL INC | 5261.00 | 927.00 | 365 |
2002 | JAMES R SMAIL INC | 4526.00 | 603.00 | 365 |
2003 | JAMES R SMAIL INC | 4057.00 | 476.00 | 365 |
2004 | JAMES R SMAIL INC | 4351.00 | 592.00 | 365 |
2005 | JAMES R SMAIL INC | 3649.00 | 502.00 | 365 |
2006 | JAMES R SMAIL INC | 3030.00 | 525.00 | 365 |
2007 | JAMES R SMAIL INC | 3229.00 | 428.00 | 365 |
2008 | JAMES R SMAIL INC | 3274.00 | 642.00 | 365 |
2009 | JAMES R SMAIL INC | 3282.00 | 554.00 | 365 |
2010 | JAMES R SMAIL INC | 4046.00 | 451.00 | 365 |
2011 | JAMES R SMAIL INC | 4481.00 | 542.00 | 365 |
2012 | JAMES R SMAIL INC | 4496.00 | 413.00 | 366 |
2013 | JAMES R SMAIL INC | 4093.00 | 538.00 | 365 |
2014 | JAMES R SMAIL INC | 4525.00 | 379.00 | 365 |
2015 | JAMES R SMAIL INC | 4627.00 | 429.00 | 365 |
2016 | JAMES R SMAIL INC | 3494.00 | 540.00 | 365 |
2017 | JAMES R SMAIL INC | 4088.00 | 375.00 | 365 |
2018 | JAMES R SMAIL INC | 4559.00 | 347.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1989 | JAMES R SMAIL INC | Brine | 0 | 182 |
1990 | JAMES R SMAIL INC | Brine | 0 | 365 |
1991 | JAMES R SMAIL INC | Brine | 194 | 365 |
1992 | JAMES R SMAIL INC | Brine | 0 | 365 |
1993 | JAMES R SMAIL INC | Brine | 179 | 365 |
1994 | JAMES R SMAIL INC | Brine | 127 | 365 |
1995 | JAMES R SMAIL INC | Brine | 135 | 365 |
1996 | JAMES R SMAIL INC | Brine | 56 | 365 |
1997 | JAMES R SMAIL INC | Brine | 147 | 365 |
1998 | JAMES R SMAIL INC | Brine | 108 | 365 |
1999 | JAMES R SMAIL INC | Brine | 63 | 365 |
2000 | JAMES R SMAIL INC | Brine | 365 | |
2001 | JAMES R SMAIL INC | Brine | 95 | 365 |
2002 | JAMES R SMAIL INC | Brine | 107 | 365 |
2003 | JAMES R SMAIL INC | Brine | 42 | 365 |
2004 | JAMES R SMAIL INC | Brine | 75 | 365 |
2005 | JAMES R SMAIL INC | Brine | 40 | 365 |
2006 | JAMES R SMAIL INC | Brine | 127 | 365 |
2007 | JAMES R SMAIL INC | Brine | 60 | 365 |
2008 | JAMES R SMAIL INC | Brine | 38 | 365 |
2009 | JAMES R SMAIL INC | Brine | 93 | 365 |
2010 | JAMES R SMAIL INC | Brine | 44 | 365 |
2011 | JAMES R SMAIL INC | Brine | 89 | 365 |
2012 | JAMES R SMAIL INC | Brine | 44 | 366 |
2013 | JAMES R SMAIL INC | Brine | 88 | 365 |
2014 | JAMES R SMAIL INC | Brine | 44 | 365 |
2015 | JAMES R SMAIL INC | Brine | 60 | 365 |
2016 | JAMES R SMAIL INC | Brine | 43 | 365 |
2017 | JAMES R SMAIL INC | Brine | 35 | 365 |
2018 | PIN OAK ENERGY PARTNERS LLC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0000PL4237 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
0120354918 | 2018-05-11 | UrbanProduction Wells | No Violations | Access was gained through parking lots of the Rocks R Us and the VFW. The wellhead was secured with a locked fence. The I. D. signage was posted and legible. The well was produced as a plunger lift utilizing 1.5 tubing and 4.5 production casing. A domestic manifold with a drip tank was connected to 4.5 casing. The tank battery was surrounded with a locked chain link fence and an earthen dike. The I. D. signage was posted and legible. Two (2) 100 barrels stock tanks, one (1) 50 barrel brine tank and one (1) vertical separator made up the tank battery. The load lines were plugged. A small amount of dried oil was found under the brine drain line. I will contact Operator concerning clean up and use of absorbent diapers in future. |
120354918 | 2018-5-11 0:00: | UP | No Violations | |
PL4237 | PL | No Violations |
For data sources see[9]