If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-153-22625 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.14,"lon":-81.64,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Summit | |
| Municipality: Bath Township | |
| Operator Name: EMBASSY ENERGY INC. | |
| Well Pad ID: | |
| Farm/Lease Name: J D I I I | |
| License Status: Producing | |
| License Date: 1990-01-03 | |
| Spud Date: 1990-03-15 | |
| Spud Drilling Contractor: [[JL COATS [COATS-GOFF]]] | |
| Final Drill Date: 1990-03-22 | |
| Well Total Depth: 3728.00 ft | |
| Configuration: Vertical | |
| Latitude: 41.140000 | |
| Longitude: -81.640000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| CO | 1990-01-03 | 2455 WHIDBEY RESOURCES INC GeoDate 1/3/90 |
| Oil and Gas | 1990-01-03 | Issued Date 12/29/89 Expired Date 12/29/90 Acres 0020000 Tool Type RTF Proposed Formation CLINTON Proposed Depth 03728 Proposed Drill Depth 03728 |
| Original Spud | 1990-03-14 | |
| Completed | 1990-03-22 | |
| Reached Total Depth | 1990-03-22 | |
| Completion Report Received | 1990-10-29 | |
| Construction Permit Expires | 1990-12-29 | |
| Change of Owner | 2002-02-21 | Operator changed from 2455, WHIDBEY RESOURCES INC to 3802, NORTH AMERICAN PETROLEUM |
| Change of Owner | 2016-07-05 | Operator changed from 3802, NORTH AMERICAN PETROLEUM to 9683, EMBASSY ENERGY INC. |
| Record Last Modified | 2017-02-15 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 1997-06-29 | 3515 | 3602 | 0 |
| 3515 | 3602 | 0 | |
| 2006-09-11 | 3536 | 3600 | 26 |
| 3536 | 3600 | 26 | |
| 3515 | 3602 | 0 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| ACID | 8 | 150 Gal | 60000 | 7 1/2 HCL. | ||
| H2O | 0 | 2100 Bbl | 0 | FRAC:WATER/SAND |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1991 | WHIDBEY RESOURCES INC | 11085.00 | 1287.00 | 365 |
| 1992 | WHIDBEY RESOURCES INC | 14387.00 | 1004.00 | 365 |
| 1993 | WHIDBEY RESOURCES INC | 12457.00 | 1032.00 | 365 |
| 2002 | NORTH AMERICAN PETROLEUM INC | 2820.00 | 483.00 | 365 |
| 2003 | NORTH AMERICAN PETROLEUM INC | 577.00 | 3457.00 | 365 |
| 2004 | NORTH AMERICAN PETROLEUM INC | 3449.00 | 514.00 | 365 |
| 2005 | NORTH AMERICAN PETROLEUM INC | 3360.00 | 462.00 | 365 |
| 2006 | NORTH AMERICAN PETROLEUM INC | 2743.00 | 391.00 | 365 |
| 2007 | NORTH AMERICAN PETROLEUM INC | 1405.00 | 229.00 | 365 |
| 2008 | NORTH AMERICAN PETROLEUM INC | 2712.00 | 301.00 | 365 |
| 2009 | NORTH AMERICAN PETROLEUM INC | 3311.00 | 574.00 | 365 |
| 2010 | NORTH AMERICAN PETROLEUM INC | 3323.00 | 640.00 | 365 |
| 2011 | NORTH AMERICAN PETROLEUM INC | 3076.00 | 493.00 | 365 |
| 2012 | NORTH AMERICAN PETROLEUM INC | 3856.00 | 382.00 | 366 |
| 2013 | NORTH AMERICAN PETROLEUM INC | 3784.00 | 471.00 | 365 |
| 2014 | NORTH AMERICAN PETROLEUM INC | 3645.00 | 429.00 | 178 |
| 2015 | NORTH AMERICAN PETROLEUM INC | 3881.00 | 383.00 | 365 |
| 2016 | NORTH AMERICAN PETROLEUM INC | 2564.00 | 175.00 | 180 |
| 2017 | EMBASSY ENERGY INC. | 4785.00 | 416.00 | 365 |
| 2018 | EMBASSY ENERGY INC. | 4089.00 | 376.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1991 | WHIDBEY RESOURCES INC | Brine | 965 | 365 |
| 1992 | WHIDBEY RESOURCES INC | Brine | 332 | 365 |
| 1993 | WHIDBEY RESOURCES INC | Brine | 0 | 365 |
| 2002 | NORTH AMERICAN PETROLEUM INC | Brine | 0 | 365 |
| 2003 | NORTH AMERICAN PETROLEUM INC | Brine | 0 | 365 |
| 2004 | NORTH AMERICAN PETROLEUM INC | Brine | 84 | 365 |
| 2005 | NORTH AMERICAN PETROLEUM INC | Brine | 219 | 365 |
| 2006 | NORTH AMERICAN PETROLEUM INC | Brine | 501 | 365 |
| 2007 | NORTH AMERICAN PETROLEUM INC | Brine | 77 | 365 |
| 2008 | NORTH AMERICAN PETROLEUM INC | Brine | 429 | 365 |
| 2009 | NORTH AMERICAN PETROLEUM INC | Brine | 1030 | 365 |
| 2010 | NORTH AMERICAN PETROLEUM INC | Brine | 689 | 365 |
| 2011 | NORTH AMERICAN PETROLEUM INC | Brine | 192 | 365 |
| 2012 | NORTH AMERICAN PETROLEUM INC | Brine | 187 | 366 |
| 2013 | NORTH AMERICAN PETROLEUM INC | Brine | 184 | 365 |
| 2014 | NORTH AMERICAN PETROLEUM INC | Brine | 365 | 178 |
| 2015 | NORTH AMERICAN PETROLEUM INC | Brine | 169 | 365 |
| 2016 | EMBASSY ENERGY INC. | Brine | 0 | 365 |
| 2017 | EMBASSY ENERGY INC. | Brine | 54 | 365 |
| 2018 | EMBASSY ENERGY INC. | Brine | 23 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| 0315624720 | 2003-12-31 | Production Wells | No Violations | Status check inspection - I asked Rick Batta to ID the wellhead since all four JD III wells share a common tank battery. |
| 1817590400 | 2018-12-10 | UrbanPreliminary Restoration | No Violations | The well was configured to operate as a 1.5 tubing plunger lift well. Legible signage was posted at the wellhead. The wellhead was leak free. The tank battery was shared with JD III # 1 ( 34-153-2-2624) and JD III # 3 ( 34-153-2-2725). The tanks for the tank battery was recessed below grade and was comprised of two (2) 140 barrel tanks, two (2) 100 barrel tanks, three (3) separators ( 2 vertical and 1 horizontal ) and one orifice gas meter. The gas meter had a paper chart which reflected the current production period. Legible I. D. signage was posted at the tank battery. The load lines were plugged. No violations were found during this inspection. |
| 315624720 | 2003-12-31 0:00 | PW | No Violations |
For data sources see[9]