If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-22764 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.08,"lon":-81.54,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: EVERFLOW EASTERN PARTNERS LP | |
Well Pad ID: | |
Farm/Lease Name: ALBRECHT-EXCHANGE UNIT | |
License Status: Producing | |
License Date: 1992-12-31 | |
Spud Date: 1993-03-30 | |
Spud Drilling Contractor: MOHAWK DRLG | |
Final Drill Date: 1993-05-27 | |
Well Total Depth: 3992.00 ft | |
Configuration: Vertical | |
Latitude: 41.080000 | |
Longitude: -81.540000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1992-12-31 | 2455 WHIDBEY RESOURCES INC GeoDate 12/31/92 |
Oil and Gas | 1992-12-31 | Issued Date 12/31/92 Expired Date 12/31/93 Acres 0025280 Tool Type RTF Proposed Formation CLINTON Proposed Depth 03992 Proposed Drill Depth 03992 |
Original Spud | 1993-03-30 | |
Completed | 1993-05-27 | |
Reached Total Depth | 1993-05-27 | |
Completion Report Received | 1993-06-14 | |
Construction Permit Expires | 1993-12-31 | |
CO | 1994-11-25 | 84 EVERFLOW EASTERN PTNS L P GeoDate 12/31/92 |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 3816 | 3818 | 3 |
3796 | 3887 | 0 | |
1997-06-29 | 3796 | 3887 | 0 |
3816 | 3818 | 3 | |
3796 | 3887 | 0 | |
2006-09-11 | 3823 | 3827 | 5 |
2006-09-11 | 3860 | 3876 | 17 |
2006-09-11 | 3836 | 3840 | 5 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 40000 Gal | 60000 | |||
ACID | 8 | 200 Gal | 0 | FRAC W/40M GAL H20 & 600 SX SAND |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1995 | EVERFLOW EASTERN PARTNERS LP | 55515.00 | 951.00 | 365 |
1996 | EVERFLOW EASTERN PARTNERS LP | 38482.00 | 831.00 | 365 |
1997 | EVERFLOW EASTERN PARTNERS LP | 40326.00 | 605.00 | 365 |
1998 | EVERFLOW EASTERN PARTNERS LP | 31830.00 | 713.00 | 365 |
1999 | EVERFLOW EASTERN PARTNERS LP | 17962.00 | 369.00 | 365 |
2000 | EVERFLOW EASTERN PARTNERS LP | 29629.00 | 587.00 | 365 |
2001 | EVERFLOW EASTERN PARTNERS LP | 22836.00 | 216.00 | 365 |
2002 | EVERFLOW EASTERN PARTNERS LP | 14351.00 | 193.00 | 365 |
2003 | EVERFLOW EASTERN PARTNERS LP | 14615.00 | 148.00 | 365 |
2004 | EVERFLOW EASTERN PARTNERS LP | 11810.00 | 251.00 | 365 |
2005 | EVERFLOW EASTERN PARTNERS LP | 9905.00 | 277.00 | 365 |
2006 | EVERFLOW EASTERN PARTNERS LP | 9683.00 | 217.00 | 365 |
2007 | EVERFLOW EASTERN PARTNERS LP | 9610.00 | 175.00 | 365 |
2008 | EVERFLOW EASTERN PARTNERS LP | 6888.00 | 166.00 | 365 |
2009 | EVERFLOW EASTERN PARTNERS LP | 6183.00 | 59.00 | 365 |
2010 | EVERFLOW EASTERN PARTNERS LP | 7502.00 | 138.00 | 365 |
2011 | EVERFLOW EASTERN PARTNERS LP | 5774.00 | 118.00 | 365 |
2012 | EVERFLOW EASTERN PARTNERS LP | 5305.00 | 93.00 | 336 |
2013 | EVERFLOW EASTERN PARTNERS LP | 6140.00 | 120.00 | 365 |
2014 | EVERFLOW EASTERN PARTNERS LP | 4223.00 | 96.00 | 365 |
2015 | EVERFLOW EASTERN PARTNERS LP | 3914.00 | 89.00 | 365 |
2016 | EVERFLOW EASTERN PARTNERS LP | 874.00 | 0.00 | 365 |
2017 | EVERFLOW EASTERN PARTNERS LP | 3531.00 | 60.00 | 365 |
2018 | EVERFLOW EASTERN PARTNERS LP | 5140.00 | 85.00 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-382408812 | 2016-3-15 0:00: | UP | No Violations | |
0382408812 | 2016-03-15 | UrbanProduction Wells | No Violations | The Albrecht - Exchange Unit #1 was completed in 5/ 1993. A review of the RBDMS data base indicated that the production volumes were current. The lease road, which leads to both the tank battery and well head, is graveled. The tank battery is a common tank battery also servicing the John Brown # 1-D ( 34-153-2-3156 ) and St. Joseph Unit # 1-D ( 34-153-2-2807 ) wells. The tank battery is fenced and locked. One (1) 140 barrel oil tank, one (1) 33 barrel poly brine tank and a 2408 horizontal separator were allocated to the well. All the load line were locked and plugged. I did not identify any leaks or contamination associated with the tank battery equipment for the Albrecht-Exchange Unit #1. The required signage was in place and legible. The well was shut due to market conditions. The well was cycled on for two (2) weeks and off for three (3) months. The well was fenced and locked with proper signage in place. The well was constructed with 317 of 8.625 surface casing, 3917 of 4.5 production casing and 3810 of 1.5 tubing. The well was operated as a plunger lift well. The well was shut in at the sales line, I spoke with George Strawn ( Everflow ) and requested that the gate valve be utilized to shut in the well. The well head was leak free at the time of this inspection. No violations identified. |
For data sources see[9]