Well Details

Well ID: 34-153-22828
Loading map...
Country: United States
State: Ohio
County: <County>
Municipality:
Operator Name: BASS ENERGY CO INC
Well Pad ID:
Farm/Lease Name: CANAL PLACE LTD UNIT
License Status: Final Restoration
License Date: 2016-02-01
Spud Date: 1996-02-14
Spud Drilling Contractor: IPSCO
Final Drill Date: 1996-02-28
Well Total Depth: 4325.00 ft
Configuration: Directional
Latitude: 41.070000
Longitude: -81.520000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1995-11-01 1639 BASS ENERGY CO INC GeoDate 11/1/95
Oil and Gas 1995-11-01 Issued Date 11/1/95 Expired Date 10/31/96 Acres 0029530 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 04325 Proposed Drill Depth 04325
Original Spud 1996-02-14 RBDMS Rec
Completed 1996-02-28 RBDMS Rec
Reached Total Depth 1996-02-28 RBDMS Rec
Completion Report Received 1996-06-14 RBDMS Rec
Correction to Well 1997-08-28 CORRECTION IN TARGET X-COORDINATE FROM 2,267,830 TO 2,367,860; DRILL UNIT: 29.24; TARGET FOOTAGE: 295'SL & 10,320'EL OF TRACT 7. SURFACE IS THE SAME AS BEFORE.
APP 2016-02-01 Proposed Formations:CLINTON, Issued Date:2/1/2016, Expired Date:1/31/2018 12:00:00 PM, Drilling unit acres:29.53, Proposed Well Type:OG, Proposed Well Class:
Plugged/Abandoned 2016-08-05 RBDMS Rec
Construction Permit Expires 2018-01-31 RBDMS Rec
Record Last Modified 2018-06-23 RBDMS Rec

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 4139 4223 0
4139 4223 0
4139 4223 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
0 0 0 FRAC W/1500 BW & 46,460 LB SAND

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1996 BASS ENERGY CO INC 14381.00 0.00 184
1997 BASS ENERGY CO INC 8578.00 0.00 365
1998 BASS ENERGY CO INC 6454.00 448.00 365
1999 BASS ENERGY CO INC 4899.00 172.00 365
2000 BASS ENERGY CO INC 4941.00 249.00 365
2001 BASS ENERGY CO INC 2740.00 189.00 365
2002 BASS ENERGY CO INC 9228.00 267.00 365
2003 BASS ENERGY CO INC 11686.00 189.00 365
2004 BASS ENERGY CO INC 10735.00 91.00 365
2005 BASS ENERGY CO INC 5684.00 89.00 365
2006 BASS ENERGY CO INC 2635.00 82.00 365
2007 BASS ENERGY CO INC 2867.00 68.00 365
2008 BASS ENERGY CO INC 2009.00 0.00 365
2009 BASS ENERGY CO INC 986.00 0.00 365
2010 BASS ENERGY CO INC 512.00 75.00 365
2011 BASS ENERGY CO INC 320.00 41.00 0
2012 BASS ENERGY CO INC 261.00 87.00 366
2013 BASS ENERGY CO INC 68.00 0.00 365
2014 BASS ENERGY CO INC 27.00 0.00 365
2015 BASS ENERGY CO INC 3.00 0.00 365
2016 BASS ENERGY CO INC 0.00 0.00 0

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1996 BASS ENERGY CO INC Brine 1179 184
1997 BASS ENERGY CO INC Brine 390 365
1998 BASS ENERGY CO INC Brine 969 365
1999 BASS ENERGY CO INC Brine 661 365
2000 BASS ENERGY CO INC Brine 570 365
2001 BASS ENERGY CO INC Brine 133 365
2002 BASS ENERGY CO INC Brine 655 365
2003 BASS ENERGY CO INC Brine 524 365
2004 BASS ENERGY CO INC Brine 588 365
2005 BASS ENERGY CO INC Brine 450 365
2006 BASS ENERGY CO INC Brine 312 365
2007 BASS ENERGY CO INC Brine 130 365
2008 BASS ENERGY CO INC Brine 0 365
2009 BASS ENERGY CO INC Brine 309 365
2010 BASS ENERGY CO INC Brine 221 365
2011 BASS ENERGY CO INC Brine 228
2012 BASS ENERGY CO INC Brine 295 366
2013 BASS ENERGY CO INC Brine 0 365
2014 BASS ENERGY CO INC Brine 80 365
2015 BASS ENERGY CO INC Brine 0 365
2016 BASS ENERGY CO INC Brine 25 0

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-150462473 2004-1-7 0:00:0 PW No Violations
-1534715487 2016-8-5 0:00:0 PB No Violations 6.80
0000008587 Preliminary Restoration No Violations PASSED Y WITNESSED 9/30/96 INSPECTOR NORBERT LOWDER DATE 09/3019/96 DATA FROM OLD VAX INFO
0150462473 2004-01-07 Production Wells No Violations Status check inspection - no violations at this time.
0407778397 2016-08-08 Plug / Plug Back No Violations Upon inspection, I found the cement top of the surface plug to be eight (8) inches down from the top collar of the surface casing. Cement was set and the well was static. No violations were identified during this inspection.
0572973139 2007-05-23 Production Wells No Violations Status check inspection - no violations at this time.
1457373425 2016-02-17 UrbanProduction Wells No Violations The Canal Place # 3-D well was completed 2/96. The well is located in the parking lot of the Spaghetti Warehouse. The wells production is current as reflected by RBDMS. The well is operated by an electric pump jack. The well construction is 8.625 surface casing ( 352 ), 4.5 production casing with 2.375 tubing. A downhole pump is actuated by the sucker rods. The signage at the well is complete and legible. The well is surrounded by a locked fence and evergreen landscaping. There are six ( 6) 55 gallon barrels marked non hazardous waste on the north side of the well. There was not any sign of a previous release around the well head. I will inquire with Operator as to the nature of the material and request its disposal. All the piping and fittings were free from leaks during my inspection. The tank battery is shared with the Canal Place # 1 well ( 34-153-2-2772 ). The tank battery is surrounded with a concrete dike with chain link fencing on top. The fencing was locked. The required urban production I.D. signage was in place and legible. The tank battery ( for the Canal Place # 3 ) consisted of one (1) 140 barrel oil tank, one (1) poly 25 barrel brine tank and a 2408 mechanical separator. The tank battery was free from leaks and contamination. There were no violations identified during my inspection.
1473442237 2016-07-29 UrbanProduction Wells No Violations I conducted a status check inspection of this directional, Clinton Sandstone well prior to the commencement of plugging operations scheduled for next week beginning 8/1/2016. My inspection found the wellhead equipped with rods and tubing. The pumping unit has been removed and the area around the wellhead remains fenced and secured. The valves on the tubing head and 4.5 production casing are open to the tank battery and the valve on the annulus between the 8.625 surface casing and 4.5 casing is closed. The proper ID and warning signage is posted on the fencing. The well produces to a tank battery to the south that is shared with the Canal Place #1 (PN#2772) and contains two (2) horizontal separators, two (2) 140 barrel tanks, and two (2) 35 barrel poly tanks. The battery has been constructed 4-5 below the grade of the parking lot and is fenced, screened, and secured with locks. The domestic hook-up for Canal Place has been disconnected. The proper ID and required warning signage are posted on the tank battery fence. No violations.
1526477595 2018-05-16 Final Restoration No Violations The previous location for the Canal Place # 3-D has been paved over, with asphalt, and was being utilized as part of the parking lot for the Canal Place complex. The wellhead and tank battery were accessed on existing roads within the complex. The tank battery was completely removed and paved. I did not find any surface expression of previous oil and gas activity during this inspection. The flow lines were reported to be purged with fresh water. The Owners of Canal Place have submitted a Landowner Waiver to allow the flowlines to remain in place. The Canal Place # 3-D was in compliance to meet the Final Restorations parameters. Final Restoration was passed.
1534715487 2016-08-05 Plug / Plug Back No Violations I was on location at 6:50am with Nicks Well Plugging (NWP), Appalachian Well Surveys (AWS), and Ralph Gregory (Bass Energy) to witness plugging operations on this Clinton Sandstone well. AWS shot off the 4.5 production casing at a depth of 2150 and NWP set a 300 plug to isolate the Big Lime and a 200 plug at he bottom of the surface casing. AWS set a steel bridge plug at a depth of 210 and NWP filled the 8.625 surface casing with cement from the top of the bridge plug to ground level. The hole was topped off and the casing will be cut off and fitted with the proper ID plate next week. See plugging report for more details on this job. No violations.
1775839054 2016-08-04 Plug / Plug Back No Violations I was on location at 9:30am with Nicks Well Plugging (NWP) and Ralph Gregory (Bass Energy) to witness plugging operations on this Clinton Sandstone well. NWP recovered the tubing remaining in the hole and rigged up to bullhead the bottom plug. NWP mixed and pumped 30 sacks (6.3bbls) of Class A cement with 50lbs of cottonseed hulls into the casing and bullheaded the cement plug with 63 barrels of water. The plug landed and the well locked up at 600psi. The well was shut-in and plugging operations will continue tomorrow (8/5/16). No violations.
407778397 2016-8-8 0:00:0 PB No Violations
572973139 2007-5-23 0:00: PW No Violations
8587 PL No Violations