If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-22870 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.13,"lon":-81.53,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: NORTH AMERICAN PETROLEUM INC | |
Well Pad ID: | |
Farm/Lease Name: NOVISKY | |
License Status: Producing | |
License Date: 1997-10-17 | |
Spud Date: 1998-04-01 | |
Spud Drilling Contractor: MARIC DRILLING CO. | |
Final Drill Date: 1998-04-08 | |
Well Total Depth: 3890.00 ft | |
Configuration: Vertical | |
Latitude: 41.130000 | |
Longitude: -81.530000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 1997-10-17 | Proposed Formations:CLINTON, Issued Date:10/17/97, Expired Date:10/17/98 6:00:00 AM, Drilling unit acres:22.2293, Proposed Well Type:OG, Proposed Well Class:POOL |
Original Spud | 1998-04-01 | RBDMS Rec |
Completed | 1998-04-08 | RBDMS Rec |
Reached Total Depth | 1998-04-08 | RBDMS Rec |
Completion Report Received | 1998-07-01 | RBDMS Rec |
Construction Permit Expires | 1998-10-17 | RBDMS Rec |
Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1998-09-04 | 3709 | 3748 | 26 |
3709 | 3748 | 26 | |
3709 | 3748 | 26 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 78000 Gal | 60000 | 500 GALLONS 7.5% HCL ACID |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1998 | NORTH AMER PETROLEUM INC | 0.00 | 594.00 | 31 |
1999 | NORTH AMERICAN PETROLEUM INC | 7290.00 | 2269.00 | 365 |
2000 | NORTH AMER PETROLEUM INC | 8131.00 | 2118.00 | 365 |
2001 | NORTH AMERICAN PETROLEUM INC | 8234.00 | 1697.00 | 365 |
2002 | NORTH AMERICAN PETROLEUM INC | 4902.00 | 1318.00 | 365 |
2003 | NORTH AMERICAN PETROLEUM INC | 4093.00 | 1234.00 | 365 |
2004 | NORTH AMERICAN PETROLEUM INC | 3844.00 | 1033.00 | 365 |
2005 | NORTH AMERICAN PETROLEUM INC | 2712.00 | 740.00 | 365 |
2006 | NORTH AMERICAN PETROLEUM INC | 2234.00 | 767.00 | 365 |
2007 | NORTH AMERICAN PETROLEUM INC | 1990.00 | 600.00 | 365 |
2008 | NORTH AMERICAN PETROLEUM INC | 2183.00 | 731.00 | 365 |
2010 | NORTH AMERICAN PETROLEUM INC | 978.00 | 287.00 | 365 |
2011 | NORTH AMERICAN PETROLEUM INC | 802.00 | 301.00 | 365 |
2012 | NORTH AMERICAN PETROLEUM INC | 648.00 | 171.00 | 366 |
2013 | NORTH AMERICAN PETROLEUM INC | 168.00 | 197.00 | 88 |
2014 | NORTH AMERICAN PETROLEUM INC | 484.00 | 254.00 | 0 |
2015 | NORTH AMERICAN PETROLEUM INC | 254.00 | 119.00 | 365 |
2016 | NORTH AMERICAN PETROLEUM INC | 425.00 | 139.00 | 199 |
2017 | NORTH AMERICAN PETROLEUM INC | 117.00 | 91.00 | 87 |
2018 | NORTH AMERICAN PETROLEUM INC | 246.00 | 294.00 | 87 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1998 | NORTH AMER PETROLEUM INC | Brine | 160 | 31 |
1999 | NORTH AMERICAN PETROLEUM INC | Brine | 496 | 365 |
2000 | NORTH AMER PETROLEUM INC | Brine | 326 | 365 |
2001 | NORTH AMERICAN PETROLEUM INC | Brine | 196 | 365 |
2002 | NORTH AMERICAN PETROLEUM INC | Brine | 112 | 365 |
2003 | NORTH AMERICAN PETROLEUM INC | Brine | 107 | 365 |
2004 | NORTH AMERICAN PETROLEUM INC | Brine | 52 | 365 |
2005 | NORTH AMERICAN PETROLEUM INC | Brine | 0 | 365 |
2006 | NORTH AMERICAN PETROLEUM INC | Brine | 118 | 365 |
2007 | NORTH AMERICAN PETROLEUM INC | Brine | 111 | 365 |
2008 | NORTH AMERICAN PETROLEUM INC | Brine | 54 | 365 |
2010 | NORTH AMERICAN PETROLEUM INC | Brine | 0 | 365 |
2011 | NORTH AMERICAN PETROLEUM INC | Brine | 20 | 365 |
2012 | NORTH AMERICAN PETROLEUM INC | Brine | 0 | 366 |
2013 | NORTH AMERICAN PETROLEUM INC | Brine | 0 | 88 |
2014 | NORTH AMERICAN PETROLEUM INC | Brine | 365 | 0 |
2015 | NORTH AMERICAN PETROLEUM INC | Brine | 0 | 365 |
2016 | NORTH AMERICAN PETROLEUM INC | Brine | 0 | 199 |
2017 | NORTH AMERICAN PETROLEUM INC | Brine | 0 | 87 |
2018 | NORTH AMERICAN PETROLEUM INC | Brine | 0 | 87 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1194542623 | 2009-6-26 0:00: | PW | No Violations | |
-1292102991 | 2009-7-9 0:00:0 | PW | No Violations | |
-1502102710 | 2009-6-4 0:00:0 | PW | No Violations | |
-2024730297 | 2009-6-11 0:00: | PW | No Violations | |
-923363801 | 2009-6-16 0:00: | PW | No Violations | |
0501446691 | 2004-05-13 | Production Wells | No Violations | Status check inspection - no violations at this time. |
0589072137 | 2009-06-19 | Production Wells | No Violations | The two siphon dams can be removed and the entire affected area can be reclaimed. The well still cannot be turned back into line until the containment dike is repaired. |
0923363801 | 2009-06-16 | Production Wells | No Violations | No change in the status of the well and tank battery. The lower siphon dam can be removed and the area reclaimed. The booms can be removed from the retention pond. The secondary containment dike still needs to be rebuilt before the well can be turned on and the upper siphon dam can be monitored for the next week. |
1155309041 | 2009-06-03 | Production Wells | No Violations | I received a call from Rick Batta at North American, reporting an oil spill at the Novisky well. The spill is a rule violation, but the company response was reasonably quick and effective. If the subsequent actions continue in a timely manor, a NOV will not be issued. The spill was caused by two events; 1) overfilling the 140 bbl stock tank and 2) insufficient secondary containment capacity. The spill exited the containment area and ran down the lease road to the landowners driveway, down both sides of the driveway via drainage ditches and into a retention pond. The driveway, ditches, culverts and pond were all impacted. According to the landowner, there are no discharge points from the retention pond other than overflow. The current pond level is at least three feet below that spill point. Moore Well Service was on site when I arrived and had started recovering oil with a vac truck. Additional equipment was enroute to install two siphon dams and continue product recovery. Additional recovery will continue tomorrow with hot water flushing and oil recovery. |
1194542623 | 2009-06-26 | Production Wells | No Violations | The affected areas have been graded but still need to be seeded and mulched. The siphon dams have been removed. The secondary containment dike has been raised several inches but needs additional attention. I passed this information on to Rick Batta. |
1292102991 | 2009-07-09 | Production Wells | No Violations | All of the spill issues have been addressed and corrected. I called Rick Batta and gave him permission to turn the well back into production. |
1502102710 | 2009-06-04 | Production Wells | No Violations | Two Moore Well Service vac trucks were on site flushing the impacted areas, when I arrived. A steam truck would not be available until tomorrow. The plan for today calls for flushing the impacted areas with fresh water and recovering any free oil. The catails in the pond will be cut off to allow for skimming the pond with both booms and suction. |
1691679368 | 2009-06-05 | Production Wells | No Violations | The hot water treatment was completed before I arrived on location. The majority of the spilled oil has been recovered from either the siphon dams or the retention pond. The siphon dams will remain for the next several weeks to collect any residual product and will be checked on a regular basis. I advised Rick Batta in a phone message, that the well cannot be turned back on until the secondary containment system meets the SPCC requirements. |
2024730297 | 2009-06-11 | Production Wells | No Violations | The lower siphon dam and the retention pond are in good condition. The lower siphon dam can be removed and the area can be graded and seeded. Any remaining impacted vegetation around this siphon dam can be removed. The upper siphon dam is still collecting small amounts of oil being released from the lease road stone, and needs to remain for the near future. The secondary containment dike around the tank battery still needs to be rebuilt before the well can be turned back on. |
501446691 | 2004-5-13 0:00: | PW | No Violations | |
589072137 | 2009-6-19 0:00: | PW | No Violations |
For data sources see[9]