If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-22925 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.16,"lon":-81.62,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Summit | |
Municipality: Bath Township | |
Operator Name: TRANSCONTINENTAL OIL & GAS INC | |
Well Pad ID: | |
Farm/Lease Name: O'NEILL | |
License Status: Producing | |
License Date: 2002-07-22 | |
Spud Date: 2002-11-04 | |
Spud Drilling Contractor: LANDOGS DRILLING | |
Final Drill Date: 2002-11-11 | |
Well Total Depth: 3971.00 ft | |
Configuration: Directional | |
Latitude: 41.160000 | |
Longitude: -81.620000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2002-07-22 | Proposed Formations:CLINTON, Issued Date:7/22/2002, Expired Date:7/22/2003 6:00:00 AM, Drilling unit acres:41.215, Proposed Well Type:OG, Proposed Well Class:POOL |
Original Spud | 2002-11-04 | RBDMS Rec |
Completed | 2002-11-11 | RBDMS Rec |
Reached Total Depth | 2002-11-11 | RBDMS Rec |
Completion Report Received | 2003-03-27 | RBDMS Rec |
Correction to Well | 2003-04-04 | CHANGE IN TARGET LOCATION:401'SL & 176'EL OF LOT 46; X= 2,240,204 AND Y= 548,893. UNIT SIZE INCREASED TO 66.023 ACRES. |
Construction Permit Expires | 2003-07-22 | RBDMS Rec |
Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2003-05-15 | 3684 | 3760 | 39 |
3684 | 3760 | 39 | |
3684 | 3760 | 39 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 105000 Gal | 60000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2003 | TRANSCONTINENTAL OIL & GAS INC | 9448.00 | 1860.00 | 365 |
2004 | TRANSCONTINENTAL OIL & GAS INC | 13035.00 | 988.00 | 365 |
2005 | TRANSCONTINENTAL OIL & GAS INC | 6665.00 | 648.00 | 365 |
2006 | TRANSCONTINENTAL OIL & GAS INC | 5252.00 | 393.00 | 365 |
2007 | TRANSCONTINENTAL OIL & GAS INC | 3751.00 | 390.00 | 364 |
2008 | TRANSCONTINENTAL OIL & GAS INC | 3251.00 | 224.00 | 365 |
2009 | TRANSCONTINENTAL OIL & GAS INC | 2791.00 | 202.00 | 365 |
2010 | TRANSCONTINENTAL OIL & GAS INC | 5046.00 | 362.00 | 365 |
2011 | TRANSCONTINENTAL OIL & GAS INC | 6583.00 | 387.00 | 365 |
2012 | TRANSCONTINENTAL OIL & GAS INC | 5208.00 | 347.00 | 366 |
2013 | TRANSCONTINENTAL OIL & GAS INC | 3330.00 | 218.00 | 365 |
2014 | TRANSCONTINENTAL OIL & GAS INC | 2988.00 | 169.00 | 365 |
2015 | TRANSCONTINENTAL OIL & GAS INC | 4090.00 | 167.00 | 365 |
2016 | TRANSCONTINENTAL OIL & GAS INC | 3224.00 | 102.00 | 365 |
2017 | TRANSCONTINENTAL OIL & GAS INC | 2425.00 | 43.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2003 | TRANSCONTINENTAL OIL & GAS INC | Brine | 808 | 365 |
2004 | TRANSCONTINENTAL OIL & GAS INC | Brine | 45 | 365 |
2005 | TRANSCONTINENTAL OIL & GAS INC | Brine | 33 | 365 |
2006 | TRANSCONTINENTAL OIL & GAS INC | Brine | 0 | 365 |
2007 | TRANSCONTINENTAL OIL & GAS INC | Brine | 50 | 364 |
2008 | TRANSCONTINENTAL OIL & GAS INC | Brine | 33 | 365 |
2009 | TRANSCONTINENTAL OIL & GAS INC | Brine | 0 | 365 |
2010 | TRANSCONTINENTAL OIL & GAS INC | Brine | 210 | 365 |
2011 | TRANSCONTINENTAL OIL & GAS INC | Brine | 100 | 365 |
2012 | TRANSCONTINENTAL OIL & GAS INC | Brine | 70 | 366 |
2013 | TRANSCONTINENTAL OIL & GAS INC | Brine | 35 | 365 |
2014 | TRANSCONTINENTAL OIL & GAS INC | Brine | 35 | 365 |
2015 | TRANSCONTINENTAL OIL & GAS INC | Brine | 105 | 365 |
2016 | TRANSCONTINENTAL OIL & GAS INC | Brine | 37 | 365 |
2017 | TRANSCONTINENTAL OIL & GAS INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1886909233 | 2003-1-8 0:00:0 | PW | No Violations | |
-780460922 | 2002-11-18 0:00 | DD | No Violations | |
0780460922 | 2002-11-18 | Drill / Deepen / Reopen | No Violations | The drilling rig has moved off and the pits are being pumped out and solidified. |
1037198559 | 2002-11-06 | Drill / Deepen / Reopen | No Violations | Status check inspection on drilling operation. Just drilling out from under surface. 40 feet of cement was left inside the casing. |
1886909233 | 2003-01-08 | Production Wells | No Violations | November 18, 2002 - The subject site was inspected for the purpose of determining the distance between the tank battery under construction and a vacant house south of the tank battery. The inspection was prompted by a spacing question posed to me by the Bath Township Zoning office. A roustabout crew was on site at the time of this inspection and assisted in measuring the distance between the house and the nearest stock tank. The measured distance was 83 feet and the crew was informed of the minimum distance requirements, including 100 feet between an occupied dwelling and a stock tank. Mr. Cal Marks with Transcontinental was notified of the problem by phone. Several possible locations were discussed and I reminded him of the minimum spacing requirements before leaving the site. A NOV was not issued since the tank battery was not operational.
December 3, 2002 - I was informed that the tank battery was relocated south of house and that it met all spacing requirements. January 8, 2003 - The site was inspected and I was told by the same roustabout crew that the tanks were 108 feet from the house and 70 feet from the wellhead. The site has been rough graded and the pits have been solidified. The secondary containment dike has been constructed around the tank battery. The well will be turned on in the very near future. No violations at this time. |
For data sources see[9]