If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-22926 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.02,"lon":-81.55,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Summit | |
Municipality: Coventry Township | |
Operator Name: CARGILL INC | |
Well Pad ID: | |
Farm/Lease Name: CITY OF AKRON(SMP#4) # 71 | |
License Status: Active Injection | |
License Date: 2002-12-13 | |
Spud Date: 2003-01-05 | |
Spud Drilling Contractor: UNION DRLG | |
Final Drill Date: 2003-01-22 | |
Well Total Depth: 3176.00 ft | |
Configuration: Vertical | |
Latitude: 41.020000 | |
Longitude: -81.550000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2002-12-13 | 5834 CARGILL INC Proposed Formation SALINA Issued Date 12/13/2002 Expired Date 12/13/2003 6:00:00 AM |
Original Spud | 2003-01-05 | Drilled a 20" hole to 142 feet and ran 3 joints of new, 60#, 16" casing to 130'. Casing was welded together and had a float shoe. Good circulation with cement to surface. Plug down at 19:55 on 01/06. The hole was drilled with fresh water mud using steel pits. The 14.75" surface hole was drilled to 593 feet with fresh water mud using steel pits. Ran 13 joints of new, 40.5# per foot, 10.75" casing, set at 573', with a float shoe on the bottom, baffle on the first joint, centralizers on every other joint and a wiper plug. Good circulation with cement to surface. Plug down at 04:55 on 1/10. |
Completed | 2003-01-22 | Drilled a 20" hole to 142 feet and ran 3 joints of new, 60#, 16" casing to 130'. Casing was welded together and had a float shoe. Good circulation with cement to surface. Plug down at 19:55 on 01/06. The hole was drilled with fresh water mud using steel pits. The 14.75" surface hole was drilled to 593 feet with fresh water mud using steel pits. Ran 13 joints of new, 40.5# per foot, 10.75" casing, set at 573', with a float shoe on the bottom, baffle on the first joint, centralizers on every other joint and a wiper plug. Good circulation with cement to surface. Plug down at 04:55 on 1/10. |
Reached Total Depth | 2003-01-22 | Drilled a 20" hole to 142 feet and ran 3 joints of new, 60#, 16" casing to 130'. Casing was welded together and had a float shoe. Good circulation with cement to surface. Plug down at 19:55 on 01/06. The hole was drilled with fresh water mud using steel pits. The 14.75" surface hole was drilled to 593 feet with fresh water mud using steel pits. Ran 13 joints of new, 40.5# per foot, 10.75" casing, set at 573', with a float shoe on the bottom, baffle on the first joint, centralizers on every other joint and a wiper plug. Good circulation with cement to surface. Plug down at 04:55 on 1/10. |
Completion Report Received | 2003-02-19 | Drilled a 20" hole to 142 feet and ran 3 joints of new, 60#, 16" casing to 130'. Casing was welded together and had a float shoe. Good circulation with cement to surface. Plug down at 19:55 on 01/06. The hole was drilled with fresh water mud using steel pits. The 14.75" surface hole was drilled to 593 feet with fresh water mud using steel pits. Ran 13 joints of new, 40.5# per foot, 10.75" casing, set at 573', with a float shoe on the bottom, baffle on the first joint, centralizers on every other joint and a wiper plug. Good circulation with cement to surface. Plug down at 04:55 on 1/10. |
Construction Permit Expires | 2003-12-13 | Drilled a 20" hole to 142 feet and ran 3 joints of new, 60#, 16" casing to 130'. Casing was welded together and had a float shoe. Good circulation with cement to surface. Plug down at 19:55 on 01/06. The hole was drilled with fresh water mud using steel pits. The 14.75" surface hole was drilled to 593 feet with fresh water mud using steel pits. Ran 13 joints of new, 40.5# per foot, 10.75" casing, set at 573', with a float shoe on the bottom, baffle on the first joint, centralizers on every other joint and a wiper plug. Good circulation with cement to surface. Plug down at 04:55 on 1/10. |
Last Compliance Report | 2018-05-14 | Drilled a 20" hole to 142 feet and ran 3 joints of new, 60#, 16" casing to 130'. Casing was welded together and had a float shoe. Good circulation with cement to surface. Plug down at 19:55 on 01/06. The hole was drilled with fresh water mud using steel pits. The 14.75" surface hole was drilled to 593 feet with fresh water mud using steel pits. Ran 13 joints of new, 40.5# per foot, 10.75" casing, set at 573', with a float shoe on the bottom, baffle on the first joint, centralizers on every other joint and a wiper plug. Good circulation with cement to surface. Plug down at 04:55 on 1/10. |
Record Last Modified | 2018-05-14 | Drilled a 20" hole to 142 feet and ran 3 joints of new, 60#, 16" casing to 130'. Casing was welded together and had a float shoe. Good circulation with cement to surface. Plug down at 19:55 on 01/06. The hole was drilled with fresh water mud using steel pits. The 14.75" surface hole was drilled to 593 feet with fresh water mud using steel pits. Ran 13 joints of new, 40.5# per foot, 10.75" casing, set at 573', with a float shoe on the bottom, baffle on the first joint, centralizers on every other joint and a wiper plug. Good circulation with cement to surface. Plug down at 04:55 on 1/10. |
For data sources see[2]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1255101943 | 2014-12-5 0:00: | SM | No Violations | |
-1512948448 | 2003-3-5 0:00:0 | SM | No Violations | |
-1799311352 | 2010-8-3 0:00:0 | SM | No Violations | |
-1899157272 | 2003-1-7 0:00:0 | DD | No Violations | |
-1914265208 | 2004-10-26 0:00 | SM | No Violations | |
-637436167 | 2003-1-13 0:00: | DD | No Violations | |
-8510548 | 2020-2-21 0:00: | SM | No Violations | 0.30 |
0025343218 | 2013-06-19 | Solution Mining Project | No Violations | I witnessed a water-brine interface mechanical integrity test. The well passed.
My inspection was accompanied by Robert Worstall. |
0055997946 | 2009-06-18 | Solution Mining Project | No Violations | Columbus requested an annual inspection of the solution mining wells. This inspection found no violations at this time. |
0189647168 | 2017-12-01 | Solution Mining Project | No Violations | I was on location to inspect the injection well. A locked chain link fence with barb wire surrounds the well. I observed no leaks or spills. An identification sign is posted. The access road gate was locked with an identification sign. There are no issues at this time. |
0422360999 | 2003-09-02 | Preliminary Restoration | No Violations | Preliminary restoration approved. |
0455421031 | 2008-06-26 | Solution Mining Project | No Violations | Successfully completed the 5 year MIT for this well using Akron 68 as the reference well. The pressure difference between the test well and the reference well over eight hours was 0.155 psi for an average of 0.019 psi/hour.
Start Time End Time Start Diff End Diff Total Diff Avg/ hour 0800 1600 266.168 psi 266.013 psi 0.155 psi 0.019 psi |
0516989129 | 2003-01-08 | Drill / Deepen / Reopen | No Violations | Status check on drilling progress. No violations at this time. |
0637436167 | 2003-01-13 | Drill / Deepen / Reopen | No Violations | Status check inspection on drilling progress. No violations at this time. |
1042656227 | 2003-01-06 | Drill / Deepen / Reopen | No Violations | Status check on drilling progress. No violations at this time. |
1042661541 | 2003-01-11 | Drill / Deepen / Reopen | No Violations | Witness the BOP test. Test began at 15:25 with pressure up to 500 psi. After 30 minutes the pressure had declined to 325 psi. No leak-off was visible around the wellhead. Pressure loss was apparently through the flowline and into the possumbelly. |
1043176412 | 2003-01-16 | Drill / Deepen / Reopen | No Violations | Status check inspection on drilling progress. No violations at this time. |
1255101943 | 2014-12-05 | Solution Mining Project | No Violations | An inspection of the well found no violations at the time. |
1512948448 | 2003-03-05 | Solution Mining Project | No Violations | Witness the cement bond log. No violations at this time. |
1679142799 | 2016-08-16 | Solution Mining Project | No Violations | There were no violations at the time of inspection. |
1799311352 | 2010-08-03 | Solution Mining Project | No Violations | Annual inspection of this solution mining well found no violations at this time. |
187181831 | 2019-2-14 0:00: | SM | No Violations | 0.50 |
189647168 | 2017-12-1 0:00: | SM | No Violations | 0.20 |
1899157272 | 2003-01-07 | Drill / Deepen / Reopen | No Violations | Status check on drilling progress. No violations at this time. |
1914265208 | 2004-10-26 | Solution Mining Project | No Violations | Status check inspection - no violations at this time. |
25343218 | 2013-6-19 0:00: | SM | No Violations | |
422360999 | 2003-9-2 0:00:0 | PL | No Violations | |
455421031 | 2008-6-26 0:00: | SM | No Violations | |
516989129 | 2003-1-8 0:00:0 | DD | No Violations | |
55997946 | 2009-6-18 0:00: | SM | No Violations |
For data sources see[3]