If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-22931 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.08,"lon":-81.52,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: EVERFLOW EASTERN PARTNERS LP | |
Well Pad ID: | |
Farm/Lease Name: GLENDALE CEMETERY UNIT | |
License Status: Producing | |
License Date: 2003-08-08 | |
Spud Date: 2003-11-11 | |
Spud Drilling Contractor: LANDOGS DRILLING | |
Final Drill Date: 2003-11-19 | |
Well Total Depth: 4455.00 ft | |
Configuration: Directional | |
Latitude: 41.080000 | |
Longitude: -81.520000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2003-08-08 | 84 EVERFLOW EASTERN PTNS L P Proposed Formation CLINTON Issued Date 8/8/2003 Expired Date 8/7/2004 6:00:00 AM |
Inspector Comments Cement Job | 2003-11-11 | 12-1/4" surface hole drilled with fresh water mud. Ran 13 joints (562') of new, R-3, 23#, 8-5/8" surface casing with a guide shoe. Set at 574. Cement with 200 sacks of light and 150 sacks of regular class A with 3% calcium chloride. Cement circulated to surface and stayed up. Plug down at 18:03 on 11/12/03.Cement Ticket Notes Inspector Reporting WORSTALL BOB |
Original Spud | 2003-11-11 | RBDMS Rec |
Completed | 2003-11-19 | RBDMS Rec |
Reached Total Depth | 2003-11-19 | RBDMS Rec |
Completion Report Received | 2004-01-02 | RBDMS Rec |
Correction to Well | 2004-05-07 | CHANGE IN TARGET INFORMATION: 8,239'SL & 12,413'EL OF TWP. X= 2,266,004; Y= 518,000; ELEV= 970'. CHANGE IN SURFACE INFORMATION: 7,655'SL & 10,800'EL OF TWP; X= 2,267,619; Y= 517,350; ELEV.= 950' (SOURCE OF INFORMATION: "AS DRILLED SURVEY"). CHANGE IN UNIT SIZE TO 45.77 ACRES. |
Construction Permit Expires | 2004-08-07 | RBDMS Rec |
Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2004-03-01 | 4186 | 4208 | 93 |
4186 | 4208 | 93 | |
4186 | 4208 | 93 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 8 | 2404 Bbl | 80000 | 1000 GALLONS HCL ACID |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2004 | EVERFLOW EASTERN PARTNERS LP | 12402.00 | 567.00 | 305 |
2005 | EVERFLOW EASTERN PARTNERS LP | 14780.00 | 589.00 | 365 |
2006 | EVERFLOW EASTERN PARTNERS LP | 12905.00 | 391.00 | 365 |
2007 | EVERFLOW EASTERN PARTNERS LP | 8951.00 | 282.00 | 365 |
2008 | EVERFLOW EASTERN PARTNERS LP | 8068.00 | 273.00 | 365 |
2009 | EVERFLOW EASTERN PARTNERS LP | 7350.00 | 177.00 | 365 |
2010 | EVERFLOW EASTERN PARTNERS LP | 6014.00 | 185.00 | 365 |
2011 | EVERFLOW EASTERN PARTNERS LP | 4980.00 | 107.00 | 365 |
2012 | EVERFLOW EASTERN PARTNERS LP | 5202.00 | 152.00 | 336 |
2013 | EVERFLOW EASTERN PARTNERS LP | 4876.00 | 137.00 | 365 |
2014 | EVERFLOW EASTERN PARTNERS LP | 2856.00 | 80.00 | 260 |
2015 | EVERFLOW EASTERN PARTNERS LP | 4762.00 | 119.00 | 365 |
2016 | EVERFLOW EASTERN PARTNERS LP | 111.00 | 0.00 | 365 |
2017 | EVERFLOW EASTERN PARTNERS LP | 4277.00 | 171.00 | 365 |
2018 | EVERFLOW EASTERN PARTNERS LP | 3961.00 | 121.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2004 | EVERFLOW EASTERN PARTNERS LP | Brine | 333 | 305 |
2005 | EVERFLOW EASTERN PARTNERS LP | Brine | 143 | 365 |
2006 | EVERFLOW EASTERN PARTNERS LP | Brine | 167 | 365 |
2007 | EVERFLOW EASTERN PARTNERS LP | Brine | 125 | 365 |
2008 | EVERFLOW EASTERN PARTNERS LP | Brine | 148 | 365 |
2009 | EVERFLOW EASTERN PARTNERS LP | Brine | 58 | 365 |
2010 | EVERFLOW EASTERN PARTNERS LP | Brine | 87 | 365 |
2011 | EVERFLOW EASTERN PARTNERS LP | Brine | 68 | 365 |
2012 | EVERFLOW EASTERN PARTNERS LP | Brine | 69 | 336 |
2013 | EVERFLOW EASTERN PARTNERS LP | Brine | 76 | 365 |
2014 | EVERFLOW EASTERN PARTNERS LP | Brine | 49 | 260 |
2015 | EVERFLOW EASTERN PARTNERS LP | Brine | 68 | 365 |
2016 | EVERFLOW EASTERN PARTNERS LP | Brine | 59 | 365 |
2017 | EVERFLOW EASTERN PARTNERS LP | Brine | 57 | 365 |
2018 | EVERFLOW EASTERN PARTNERS LP | Brine | 59 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
1070899362 | 2003-12-01 | Drill / Deepen / Reopen | No Violations | The blow pit has been closed in and the working pit remains open. Several loads of water have been removed and the pit has additional capacity. |
1073332853 | 2003-12-29 | Preliminary Restoration | No Violations | Status check inspection for preliminary restoration. The well has been fraced and site is being graded and the pits are being closed. Preliminary restoration should be approved within the alloted time. |
1096464937 | 2004-09-07 | Preliminary Restoration | No Violations | Preliminary restoration approved. |
For data sources see[9]