X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-153-22965

Well Details

Well ID: 34-153-22965
Loading map...
Country: United States
State: Ohio
County: Summit
Municipality: Coventry Township
Operator Name: EVERFLOW EASTERN PARTNERS LP
Well Pad ID:
Farm/Lease Name: VANDEVRE UNIT
License Status: Producing
License Date: 2005-11-22
Spud Date: 2006-01-07
Spud Drilling Contractor: WILDCAT DRILLING
Final Drill Date: 2006-01-14
Well Total Depth: 4198.00 ft
Configuration: Directional
Latitude: 41.010000
Longitude: -81.540000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2005-11-22 Proposed Formations:CLINTON, Issued Date:11/22/2005, Expired Date:11/22/2006 6:00:00 AM, Drilling unit acres:35.92, Proposed Well Type:OG, Proposed Well Class:POOL
Original Spud 2006-01-07 RBDMS Rec
Completed 2006-01-14 RBDMS Rec
Reached Total Depth 2006-01-14 RBDMS Rec
Completion Report Received 2006-02-17 RBDMS Rec
Correction to Well 2006-03-03 CHANGE IN TARGET INFORMATION: FOOTAGE= 440'NL & 1070'WL OF LOT 16, TRACT 12; Y= 490,560; ELEV.=970' (SOURCE OF LOCATION "AS DRILLED SURVEY").
Construction Permit Expires 2006-11-22 RBDMS Rec
Record Last Modified 2017-02-15 RBDMS Rec

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-04-24 3900 3974 126
3900 3974 126
3900 3974 126

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 7 2928 Bbl 100000 1000 GALLONS HCL ACID

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2005 EVERFLOW EASTERN PARTNERS LP 0.00 0.00 0
2006 EVERFLOW EASTERN PARTNERS LP 20815.00 229.00 365
2007 EVERFLOW EASTERN PARTNERS LP 21259.00 148.00 365
2008 EVERFLOW EASTERN PARTNERS LP 11509.00 177.00 365
2009 EVERFLOW EASTERN PARTNERS LP 8800.00 113.00 365
2010 EVERFLOW EASTERN PARTNERS LP 6253.00 48.00 365
2011 EVERFLOW EASTERN PARTNERS LP 6541.00 80.00 365
2012 EVERFLOW EASTERN PARTNERS LP 6492.00 21.00 306
2013 EVERFLOW EASTERN PARTNERS LP 5881.00 85.00 365
2014 EVERFLOW EASTERN PARTNERS LP 3423.00 101.00 365
2015 EVERFLOW EASTERN PARTNERS LP 4017.00 0.00 365
2016 EVERFLOW EASTERN PARTNERS LP 288.00 0.00 365
2017 EVERFLOW EASTERN PARTNERS LP 968.00 0.00 365
2018 EVERFLOW EASTERN PARTNERS LP 1643.00 145.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2005 EVERFLOW EASTERN PARTNERS LP Brine 0 0
2006 EVERFLOW EASTERN PARTNERS LP Brine 551 365
2007 EVERFLOW EASTERN PARTNERS LP Brine 264 365
2008 EVERFLOW EASTERN PARTNERS LP Brine 179 365
2009 EVERFLOW EASTERN PARTNERS LP Brine 867 365
2010 EVERFLOW EASTERN PARTNERS LP Brine 684 365
2011 EVERFLOW EASTERN PARTNERS LP Brine 665 365
2012 EVERFLOW EASTERN PARTNERS LP Brine 702 306
2013 EVERFLOW EASTERN PARTNERS LP Brine 311 365
2014 EVERFLOW EASTERN PARTNERS LP Brine 53 365
2015 EVERFLOW EASTERN PARTNERS LP Brine 150 365
2016 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2017 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2018 EVERFLOW EASTERN PARTNERS LP Brine 320 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1129808110 2006-1-9 0:00:0 DD No Violations
-1350236130 2006-1-12 0:00: DD No Violations
-782134849 2006-7-17 0:00: PL No Violations
-949866739 2006-2-10 0:00: DD No Violations
0137225738 2006-01-13 Drill / Deepen / Reopen No Violations Drilling should be completed later today with plans to start moving on Monday, January 16. No violations at this time.
0782134849 2006-07-17 Preliminary Restoration No Violations Preliminary restoration is approved.
0949866739 2006-02-10 Drill / Deepen / Reopen No Violations The drilling pits have been solidified and closed.
1129808110 2006-01-09 Drill / Deepen / Reopen No Violations Surface casing was cemented on January 8. On January 9, Wildcat Drilling rigged down and moved off the hole in order to place steel mats under the rig to stabilize and prevent sinking. The underlying soils contain a high percentage of organics and did cause some stability concerns while drilling the surface hole. It appears that groundwater was encountered while digging the working pit. I informed George Strawn that this pit would need to be solidified and the solidified material removed.
1138123942 2006-01-19 Drill / Deepen / Reopen No Violations The drilling rig has moved off. The pits are lined and have sufficient freeboard capacity.
1350236130 2006-01-12 Drill / Deepen / Reopen No Violations The rig is drilling ahead but continues to experience differential settling in the soils under the rig pad. The pits are lined and in fair condition. It appears that the working pit is floating which will require that this pit be solidified and removed.
137225738 2006-1-13 0:00: DD No Violations
1501578850 2006-01-17 Drill / Deepen / Reopen No Violations The drilling rig has moved off. The pits are lined and have been pumped down. No violations at this time.
1846718740 2006-04-13 Production Wells No Violations Status check inspection. Contacted George Strawn and requested that he plumb the second 140 bbl stock tank into the charcoal canister.

For data sources see[9]

References