If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-22998 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.3,"lon":-81.42,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: SUMMIT PETROLEUM INC | |
Well Pad ID: | |
Farm/Lease Name: MICHELE D UNIT | |
License Status: Producing | |
License Date: 2007-02-28 | |
Spud Date: 2007-04-18 | |
Spud Drilling Contractor: CAPSTAR DRILLING | |
Final Drill Date: 2007-04-26 | |
Well Total Depth: 3871.00 ft | |
Configuration: Vertical | |
Latitude: 41.300000 | |
Longitude: -81.420000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2007-02-28 | Proposed Formations:CLINTON, Issued Date:2/28/2007, Expired Date:2/28/2008 6:00:00 AM, Drilling unit acres:23.3601, Proposed Well Type:OG, Proposed Well Class:POOL |
Completed | 2007-04-26 | |
Reached Total Depth | 2007-04-26 | |
Completion Report Received | 2007-05-25 | |
Construction Permit Expires | 2008-02-28 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2007-09-12 | 3693 | 3760 | 16 |
3693 | 3760 | 16 | |
3693 | 3760 | 16 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 2500 Bbl | 0 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2007 | SUMMIT PETROLEUM INC | 8613.00 | 94.00 | 365 |
2008 | SUMMIT PETROLEUM INC | 20739.00 | 76.00 | 365 |
2009 | SUMMIT PETROLEUM INC | 18271.00 | 91.00 | 365 |
2010 | SUMMIT PETROLEUM INC | 15007.00 | 84.00 | 365 |
2011 | SUMMIT PETROLEUM INC | 11927.00 | 0.00 | 365 |
2012 | SUMMIT PETROLEUM INC | 9104.00 | 0.00 | 366 |
2013 | SUMMIT PETROLEUM INC | 10886.00 | 84.00 | 365 |
2014 | SUMMIT PETROLEUM INC | 7961.00 | 0.00 | 365 |
2015 | SUMMIT PETROLEUM INC | 7306.00 | 0.00 | 365 |
2016 | SUMMIT PETROLEUM INC | 6653.00 | 0.00 | 365 |
2017 | SUMMIT PETROLEUM INC | 5811.00 | 0.00 | 365 |
2018 | SUMMIT PETROLEUM INC | 5166.00 | 77.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2007 | SUMMIT PETROLEUM INC | Brine | 127 | 365 |
2008 | SUMMIT PETROLEUM INC | Brine | 355 | 365 |
2009 | SUMMIT PETROLEUM INC | Brine | 145 | 365 |
2010 | SUMMIT PETROLEUM INC | Brine | 165 | 365 |
2011 | SUMMIT PETROLEUM INC | Brine | 0 | 365 |
2012 | SUMMIT PETROLEUM INC | Brine | 144 | 366 |
2013 | SUMMIT PETROLEUM INC | Brine | 67 | 365 |
2014 | SUMMIT PETROLEUM INC | Brine | 0 | 365 |
2015 | SUMMIT PETROLEUM INC | Brine | 82 | 365 |
2016 | SUMMIT PETROLEUM INC | Brine | 75 | 365 |
2017 | SUMMIT PETROLEUM INC | Brine | 72 | 365 |
2018 | SUMMIT PETROLEUM INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1224853711 | 2007-8-1 0:00:0 | PW | No Violations | |
-1405076654 | 2008-6-11 0:00: | PL | No Violations | |
-2073829984 | 2007-4-26 0:00: | DD | No Violations | |
-249028165 | 2007-4-11 0:00: | DD | No Violations | |
-753125601 | 2008-5-14 0:00: | PL | No Violations | |
0249028165 | 2007-04-11 | Drill / Deepen / Reopen | No Violations | Summit Petroleum was on site to start clearing and building the drilling location. Modifications to the pre-permit site inspection conditions were discussed and approved. I reminded Summit that they must post the drilling permit and identification signs before breaking ground. They will be posted today. |
0753125601 | 2008-05-14 | Preliminary Restoration | No Violations | Preliminary restoration is past due. I contacted Summit and told them what needed to be done before preliminary restoration would be approved and when it had to be done. |
0775310400 | 2007-05-14 | Drill / Deepen / Reopen | No Violations | The drilling pits have been solidified and closed. The artesian flow coming around the backside of the surface casing has been channeled to a drainage swale that discharges into the wetland north of the drill site. A Quantab test of the water indicated chloride concentrations less than 100 ppm. |
1177678937 | 2007-04-23 | Drill / Deepen / Reopen | No Violations | Before coming out from under surface on 4/21/2007, Capstar reported that there was a small gas leak at the wellhead. After drilling out, the leak stopped. The pits are lined and full. I talked to Bill Kinney who told me that they had ordered out a frac tank to pump into. Otherwise they will have to switch to fluid in order to manage the pit levels. |
1178219638 | 2007-04-30 | Drill / Deepen / Reopen | No Violations | After the drilling rig moved off, Summit started experiencing artesian water flow around the outside of the 8-5/8 surface casing. Quantab analysis of the water indicated chloride concentrations less than 200 ppm. The initial response has been to excavate a ditch and install 4 schedule 40 PVC drain pipe from the wellhead to a nearby ditch 100 east of the well. The quality of the discharge water will be periodically checked for chloride content. The flow rate was also reduced by placing 14 bags of bentonite hole plug in the annular space. |
1183752134 | 2007-06-12 | Drill / Deepen / Reopen | No Violations | Still discharging atresian flow into the nearby drainage ditch. The well has been completed and the tank battery is under construction. No violations at this time. |
1224853711 | 2007-08-01 | Production Wells | No Violations | The tank battery has been set, the fences are up and the well is in production. Finish grading and seeding are required before preliminary restoration is approved. |
1405076654 | 2008-06-11 | Preliminary Restoration | No Violations | Preliminary restoration is approved. |
1567786090 | 2007-05-04 | Drill / Deepen / Reopen | No Violations | The well has been fraced. The artesian water flow around the outside of the sruface casing continues and is being discharged into the nearby drainage ditch via the PVC collection system. The discharge will be periodically tested for chloride content. |
1752477015 | 2007-04-20 | Drill / Deepen / Reopen | No Violations | At 23:30 on 4/19, while drilling surface hole, Capstar encountered a good shale gas show at 353. The gas unloaded some of the drilling fluid but the rig was still circulating and appeared to have the situation under control. Surface casing will be run and cemented after the gas show has been addressed. The were no gas odor complaints reported to the local fire department. |
2043321966 | 2007-04-19 | Drill / Deepen / Reopen | No Violations | Capstar Drilling Rig 1 is on site drilling surface hole. The pits are lined and in good condition. The drilling permit and ID are posted. No violations at this time. |
2073829984 | 2007-04-26 | Drill / Deepen / Reopen | No Violations | Drilling has completed and the rig should be moving tomorrow. The pits are full but are lined and in good condition. No violations at this time. |
2107500349 | 2008-02-05 | Drill / Deepen / Reopen | No Violations | Preliminary restoration was due by the end of January. The site still needs finish grading where the gas lines were installed and seeding over the entire site. If the work is not completed as soon as the weather breaks, a NOV will be issued. |
775310400 | 2007-5-14 0:00: | DD | No Violations |
For data sources see[9]