If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-153-23022 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.06,"lon":-81.42,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: <County> | |
| Municipality: | |
| Operator Name: D & L ENERGY INC | |
| Well Pad ID: | |
| Farm/Lease Name: SHANNON UNIT | |
| License Status: Final Restoration | |
| License Date: 2007-10-18 | |
| Spud Date: 2007-10-22 | |
| Spud Drilling Contractor: ADVENT DRLG | |
| Final Drill Date: 2007-10-27 | |
| Well Total Depth: 4284.00 ft | |
| Configuration: Vertical | |
| Latitude: 41.060000 | |
| Longitude: -81.420000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2007-10-18 | Proposed Formations:CLINTON, Issued Date:10/18/2007, Expired Date:10/17/2008 6:00:00 AM, Drilling unit acres:46.93, Proposed Well Type:OG, Proposed Well Class:POOL |
| Reached Total Depth | 2007-10-27 | |
| Plugged/Abandoned | 2007-11-28 | |
| Completion Report Received | 2008-08-15 | |
| Construction Permit Expires | 2008-10-17 | |
| Record Last Modified | 2015-09-24 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2008-10-15 | 4072 | 4142 | 34 |
| 4072 | 4142 | 34 | |
| 4072 | 4142 | 34 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 0 | 81000 Gal | 70000 |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2011 | D & L ENERGY INC | 0.00 | 0.00 | 0 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2011 | D & L ENERGY INC | Brine | 0 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1140178494 | 2009-1-15 0:00: | FR | No Violations | |
| -1992338818 | 2007-10-29 0:00 | DD | No Violations | |
| 0011857578 | 2007-10-22 | Drill / Deepen / Reopen | No Violations | Advent Drilling is moving on site and should spud the well later tonight. The required signage is posted and the pits are being dug. |
| 0746450585 | 2007-11-29 | Drill / Deepen / Reopen | No Violations | Hardrock Excavating was on site to solidify the drilling pits as required by rule. The job should be completed by tomorrow. |
| 1140178494 | 2009-01-15 | Final Restoration | No Violations | Final restoration is approved. The well was plugged and abandoned soon after drilling and was never placed in production. The landowner has completed the finish grading and seeding. |
| 11857578 | 2007-10-22 0:00 | DD | No Violations | |
| 1992338818 | 2007-10-29 | Drill / Deepen / Reopen | No Violations | Advent Drilling is moving off location. The pits are lined and in good condition but the required fencing is not up. I called Nick at D&L and told him to install the fence. |
| 746450585 | 2007-11-29 0:00 | DD | No Violations |
For data sources see[9]