If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-23044 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.12,"lon":-81.63,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: EVERFLOW EASTERN PARTNERS LP | |
Well Pad ID: | |
Farm/Lease Name: ROSEMONT COUNTRY CLUB | |
License Status: Producing | |
License Date: 2008-03-19 | |
Spud Date: 2008-03-28 | |
Spud Drilling Contractor: UNION DRLG | |
Final Drill Date: 2008-04-03 | |
Well Total Depth: 4046.00 ft | |
Configuration: Directional | |
Latitude: 41.120000 | |
Longitude: -81.630000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2008-03-19 | Proposed Formations:CLINTON, Issued Date:3/19/2008, Expired Date:3/19/2009 6:00:00 AM, Drilling unit acres:41.28, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2008-04-03 | PER DIRECTIONAL SURVEY, DEPTH @ 4015' = TRUE VERTICAL DEPTH OF 3749' |
Completion Report Received | 2008-05-01 | PER DIRECTIONAL SURVEY, DEPTH @ 4015' = TRUE VERTICAL DEPTH OF 3749' |
Correction to Well | 2008-06-06 | CORRECTION TO TARGET INFORMATION: NEW FOOTAGE= 251'NL & 298'EL OF LOT 8; X= 2,239,566; Y= 533,502. |
Construction Permit Expires | 2009-03-19 | PER DIRECTIONAL SURVEY, DEPTH @ 4015' = TRUE VERTICAL DEPTH OF 3749' |
Change of Owner | 2014-09-04 | Operator changed from 7626, M & M ROYALTY LTD to 84, EVERFLOW EASTERN PTNS L P |
Record Last Modified | 2017-02-15 | PER DIRECTIONAL SURVEY, DEPTH @ 4015' = TRUE VERTICAL DEPTH OF 3749' |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2008-08-26 | 3819 | 3890 | 44 |
3819 | 3890 | 44 | |
3819 | 3890 | 44 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 1500 Bbl | 60000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | M & M ROYALTY LTD | 986.00 | 91.00 | 365 |
2009 | M & M ROYALTY LTD | 7512.00 | 235.00 | 365 |
2010 | M & M ROYALTY LTD | 5934.00 | 124.00 | 365 |
2011 | M & M ROYALTY LTD | 6254.00 | 175.00 | 365 |
2012 | M & M ROYALTY LTD | 5918.00 | 119.00 | 366 |
2013 | M & M ROYALTY LTD | 4957.00 | 120.00 | 365 |
2014 | EVERFLOW EASTERN PARTNERS LP | 644.00 | 0.00 | 150 |
2015 | EVERFLOW EASTERN PARTNERS LP | 3656.00 | 57.00 | 365 |
2016 | EVERFLOW EASTERN PARTNERS LP | 3381.00 | 107.00 | 365 |
2017 | EVERFLOW EASTERN PARTNERS LP | 2860.00 | 56.00 | 365 |
2018 | EVERFLOW EASTERN PARTNERS LP | 2891.00 | 58.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | M & M ROYALTY LTD | Brine | 217 | 365 |
2009 | M & M ROYALTY LTD | Brine | 0 | 365 |
2010 | M & M ROYALTY LTD | Brine | 77 | 365 |
2011 | M & M ROYALTY LTD | Brine | 103 | 365 |
2012 | M & M ROYALTY LTD | Brine | 56 | 366 |
2013 | M & M ROYALTY LTD | Brine | 39 | 365 |
2014 | M & M ROYALTY LTD | Brine | 37 | 212 |
2015 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
2016 | EVERFLOW EASTERN PARTNERS LP | Brine | 135 | 365 |
2017 | EVERFLOW EASTERN PARTNERS LP | Brine | 31 | 365 |
2018 | EVERFLOW EASTERN PARTNERS LP | Brine | 28 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1692246529 | 2009-11-17 0:00 | PL | No Violations | |
-2036817694 | 2008-4-3 0:00:0 | DD | No Violations | |
-2098658527 | 2008-3-25 0:00: | DD | No Violations | |
-2127681114 | 2008-7-16 0:00: | DD | No Violations | |
-564037204 | 2008-4-1 0:00:0 | DD | No Violations | |
-839155786 | 2009-8-13 0:00: | PL | No Violations | |
0206395783 | 2009-06-04 | Production Wells | No Violations | I checked the site for preliminary restoration status. The seed has not germinated uniformly and large portions of the affected area are still bare ground. I called Mike Weinsz and requested that the area be reseeded and fertilized. He said that he may contract with the County Club to reclaim the affected areas. |
0564037204 | 2008-04-01 | Drill / Deepen / Reopen | No Violations | Union Drilling Rig 24 is drilling ahead. The pits are lined and in good condition. |
0839155786 | 2009-08-13 | Preliminary Restoration | Violations Noted | The affected area has been graded and seeded but still has large exposed areas where the seed has not taken. The area needs additional topsoil and fertilizer. Preliminary restoration was due February 2009. |
0903840531 | 2008-04-23 | Drill / Deepen / Reopen | No Violations | The shale pit has been solidified and covered over. The blow pit should be solidified next week. |
1206970058 | 2008-03-19 | Drill / Deepen / Reopen | No Violations | Building and stoning the drilling location and setting the silt fence and straw bales. The rig is scheduled to arrive next week. |
1207623311 | 2008-03-27 | Drill / Deepen / Reopen | No Violations | Union Drilling Rig 24 should spud the well tomorrow. The pits are dug, lined and fenced. No violations at this time. |
1692246529 | 2009-11-17 | Preliminary Restoration | No Violations | Preliminary restoration is approved. The violation is corrected. |
2036817694 | 2008-04-03 | Drill / Deepen / Reopen | No Violations | Union has completed drilling and should be ready to move tomorrow. The pits are lined, fenced and in good condition. |
206395783 | 2009-6-4 0:00:0 | PW | No Violations | |
2098658527 | 2008-03-25 | Drill / Deepen / Reopen | No Violations | Union Drilling Rig 24 is starting to move on location. All equipment will not be on site until tomorrow. The drilling pits will be dug tomorrow. |
2127681114 | 2008-07-16 | Drill / Deepen / Reopen | No Violations | Turbo Excavating is on site building the tank battery. No violations at this time. |
903840531 | 2008-4-23 0:00: | DD | No Violations |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
0839155786 | US-OH-129546 | 2009-08-26 | Failure to restore land surface within 9 mos. (CHANGE) (REPLACE) |
For data sources see[9]