If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-153-23069 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.13,"lon":-81.59,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: <County> | |
| Municipality: | |
| Operator Name: OHIO VALLEY ENERGY SYSTEMS COR | |
| Well Pad ID: | |
| Farm/Lease Name: WEST HILL BAPTIST CHURCH | |
| License Status: Producing | |
| License Date: 2008-11-10 | |
| Spud Date: 2009-02-27 | |
| Spud Drilling Contractor: WILDCAT DRILLING | |
| Final Drill Date: 2009-03-05 | |
| Well Total Depth: 3903.00 ft | |
| Configuration: Directional | |
| Latitude: 41.130000 | |
| Longitude: -81.590000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2008-11-10 | Proposed Formations:OHIO SHALE THRU CLINTON, Issued Date:11/10/2008, Expired Date:11/10/2009 6:00:00 AM, Drilling unit acres:24.57, Proposed Well Type:OG, Proposed Well Class:POOL |
| Reached Total Depth | 2009-03-05 | LOGGER'S TD MEASURED IN CASED HOLE |
| Correction to Well | 2009-04-24 | AS DRILLED SURVEY CORRECTIONS TO TARGET INFORMATION: 885'SL & 380'WL OF LOT 91; X= 2,248,975 AND Y= 537,435. |
| Completion Report Received | 2009-05-29 | LOGGER'S TD MEASURED IN CASED HOLE |
| Construction Permit Expires | 2009-11-10 | LOGGER'S TD MEASURED IN CASED HOLE |
| Record Last Modified | 2017-02-15 | LOGGER'S TD MEASURED IN CASED HOLE |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2009-07-20 | 3624 | 3644 | 62 |
| 3624 | 3644 | 62 | |
| 3624 | 3644 | 62 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 0 | 2167 Bbl | 60000 |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2009 | OHIO VALLEY ENERGY SYSTEMS COR | 3758.00 | 951.00 | 90 |
| 2010 | OHIO VALLEY ENERGY SYSTEMS COR | 12090.00 | 1329.00 | 365 |
| 2011 | OHIO VALLEY ENERGY SYSTEMS COR | 9066.00 | 1090.00 | 365 |
| 2012 | OHIO VALLEY ENERGY SYSTEMS COR | 6898.00 | 645.00 | 366 |
| 2013 | OHIO VALLEY ENERGY SYSTEMS COR | 6628.00 | 767.00 | 365 |
| 2014 | OHIO VALLEY ENERGY SYSTEMS COR | 9346.00 | 810.00 | 365 |
| 2015 | OHIO VALLEY ENERGY SYSTEMS COR | 8595.00 | 558.00 | 365 |
| 2016 | OHIO VALLEY ENERGY SYSTEMS COR | 5327.00 | 97.00 | 365 |
| 2017 | OHIO VALLEY ENERGY SYSTEMS COR | 5115.00 | 295.00 | 365 |
| 2018 | OHIO VALLEY ENERGY SYSTEMS COR | 5173.00 | 636.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2009 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 2511 | 90 |
| 2010 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 214 | 365 |
| 2011 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 25 | 365 |
| 2012 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 37 | 366 |
| 2013 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 115 | 365 |
| 2014 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 0 | 365 |
| 2015 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 0 | 365 |
| 2016 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 0 | 365 |
| 2017 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 44 | 365 |
| 2018 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 0 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -2086309548 | 2009-3-3 0:00:0 | DD | No Violations | |
| -230108557 | 2010-4-20 0:00: | PL | No Violations | |
| -253095275 | 2009-3-31 0:00: | DD | No Violations | |
| -757800493 | 2009-2-19 0:00: | DD | No Violations | |
| -858081414 | 2009-6-29 0:00: | PW | No Violations | |
| 0026007329 | 2009-03-09 | Drill / Deepen / Reopen | No Violations | Pander Trucking was on site to pump down the pits which are scheduled to be solidified and closed on Wednesday 3/11. The pits are fenced and lined. The final total on material used to fill the void on the backside of the conductor casing was 175 sacks of dry cement, 35 sacks of Benseal, 9 tons of gravel and 125 sacks of class A grouted from the surface. |
| 0152084698 | 2009-04-28 | Drill / Deepen / Reopen | No Violations | The tank battery is under construction. The site has been rough graded and the access road has been relocated to the southeast corner of the asphalt paved parking lot. The access road with direct access to Revere Road has been removed. |
| 0230108557 | 2010-04-20 | Preliminary Restoration | No Violations | Preliminary restoration is approved. |
| 0253095275 | 2009-03-31 | Drill / Deepen / Reopen | No Violations | The well has been fraced and the tank battery equipment is on site. No violations at this time. |
| 0375556002 | 2009-03-04 | Drill / Deepen / Reopen | No Violations | Wildcat is drilling ahead and should finish drilling within 24 hours. To date, the rig crew has poured 70 sacks of Quikrete in the annular space and is shoveling in 8 tons of bank run gravel to try and fill the void. I suggested that they place and hydrate either 1/2 or 3/4 bentonite hole plug before using more dry cement. |
| 0681582938 | 2009-04-08 | Drill / Deepen / Reopen | No Violations | The well has been fraced and the site is being rough graded. The tank battery is being assembled. No violations at this time. |
| 0708604559 | 2018-08-27 | UrbanProduction Wells | No Violations | Access to the wellhead and tank battery was gained through a locked gate in the southeast corner of the parking lot for the West Hill Baptist Church. The wellhead was landscaped and secured with a locked board on board fence. I. D. signage was posted. The well was operated as a plunger lift well. A domestic gas connection with meter was attached to the casing. No leaks were found. The tank battery was surrounded with a board on board locked fence and earthen dike. I. D. signage was posted. The tank battery was comprised of one (1) 140 barrel stock tank, one (1) 50 barrel poly brine tank, one (1) 2408 separator and one (1) Dominion / EOG meter station. The 140 stock tank had a carbon filter, pressure relief valve, lightning arrestor and latching hatch lid. The load lines were locked and plugged. No leaks were found. |
| 0757800493 | 2009-02-19 | Drill / Deepen / Reopen | No Violations | The entrance and the lease road have been built. The required signage and permit are posted. The rig should arrive by February 26. |
| 0858081414 | 2009-06-29 | Production Wells | No Violations | The well has just been placed in production. The required fencing has been placed around the tank battery but still needs to be placed around the well. According to Dale Nething, the fence was not installed because they needed a swab rig to kick the well off. The fence will be installed this week. |
| 1083075828 | 2009-03-17 | Drill / Deepen / Reopen | No Violations | The drilling pits have been solidified and covered over. The concern at this time is that the new grade will be higher than the original, which will alter drainage patterns. The location will be monitored as reclamation progresses. No violations at this time. |
| 152084698 | 2009-4-28 0:00: | DD | No Violations | |
| 1758699446 | 2009-02-27 | Drill / Deepen / Reopen | No Violations | Wildcat is drilling surface hole. The shale pit has been dug and lined and the blow pit is being dug. The excavated material is primarily clay. |
| 2086309548 | 2009-03-03 | Drill / Deepen / Reopen | No Violations | Wildcat is drilling ahead. The pits are smaller than usual but are lined and fenced. The backside of the conductor casing still has a large void and will need to be filled before TD is reached. |
| 26007329 | 2009-3-9 0:00:0 | DD | No Violations | |
| 375556002 | 2009-3-4 0:00:0 | DD | No Violations | |
| 681582938 | 2009-4-8 0:00:0 | DD | No Violations | |
| 708604559 | 2018-8-27 0:00: | UP | No Violations |
For data sources see[9]