X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-153-23069

Well Details

Well ID: 34-153-23069
Loading map...
Country: United States
State: Ohio
County: <County>
Municipality:
Operator Name: OHIO VALLEY ENERGY SYSTEMS COR
Well Pad ID:
Farm/Lease Name: WEST HILL BAPTIST CHURCH
License Status: Producing
License Date: 2008-11-10
Spud Date: 2009-02-27
Spud Drilling Contractor: WILDCAT DRILLING
Final Drill Date: 2009-03-05
Well Total Depth: 3903.00 ft
Configuration: Directional
Latitude: 41.130000
Longitude: -81.590000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2008-11-10 Proposed Formations:OHIO SHALE THRU CLINTON, Issued Date:11/10/2008, Expired Date:11/10/2009 6:00:00 AM, Drilling unit acres:24.57, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2009-03-05 LOGGER'S TD MEASURED IN CASED HOLE
Correction to Well 2009-04-24 AS DRILLED SURVEY CORRECTIONS TO TARGET INFORMATION: 885'SL & 380'WL OF LOT 91; X= 2,248,975 AND Y= 537,435.
Completion Report Received 2009-05-29 LOGGER'S TD MEASURED IN CASED HOLE
Construction Permit Expires 2009-11-10 LOGGER'S TD MEASURED IN CASED HOLE
Record Last Modified 2017-02-15 LOGGER'S TD MEASURED IN CASED HOLE

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2009-07-20 3624 3644 62
3624 3644 62
3624 3644 62

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 2167 Bbl 60000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2009 OHIO VALLEY ENERGY SYSTEMS COR 3758.00 951.00 90
2010 OHIO VALLEY ENERGY SYSTEMS COR 12090.00 1329.00 365
2011 OHIO VALLEY ENERGY SYSTEMS COR 9066.00 1090.00 365
2012 OHIO VALLEY ENERGY SYSTEMS COR 6898.00 645.00 366
2013 OHIO VALLEY ENERGY SYSTEMS COR 6628.00 767.00 365
2014 OHIO VALLEY ENERGY SYSTEMS COR 9346.00 810.00 365
2015 OHIO VALLEY ENERGY SYSTEMS COR 8595.00 558.00 365
2016 OHIO VALLEY ENERGY SYSTEMS COR 5327.00 97.00 365
2017 OHIO VALLEY ENERGY SYSTEMS COR 5115.00 295.00 365
2018 OHIO VALLEY ENERGY SYSTEMS COR 5173.00 636.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2009 OHIO VALLEY ENERGY SYSTEMS COR Brine 2511 90
2010 OHIO VALLEY ENERGY SYSTEMS COR Brine 214 365
2011 OHIO VALLEY ENERGY SYSTEMS COR Brine 25 365
2012 OHIO VALLEY ENERGY SYSTEMS COR Brine 37 366
2013 OHIO VALLEY ENERGY SYSTEMS COR Brine 115 365
2014 OHIO VALLEY ENERGY SYSTEMS COR Brine 0 365
2015 OHIO VALLEY ENERGY SYSTEMS COR Brine 0 365
2016 OHIO VALLEY ENERGY SYSTEMS COR Brine 0 365
2017 OHIO VALLEY ENERGY SYSTEMS COR Brine 44 365
2018 OHIO VALLEY ENERGY SYSTEMS COR Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-2086309548 2009-3-3 0:00:0 DD No Violations
-230108557 2010-4-20 0:00: PL No Violations
-253095275 2009-3-31 0:00: DD No Violations
-757800493 2009-2-19 0:00: DD No Violations
-858081414 2009-6-29 0:00: PW No Violations
0026007329 2009-03-09 Drill / Deepen / Reopen No Violations Pander Trucking was on site to pump down the pits which are scheduled to be solidified and closed on Wednesday 3/11. The pits are fenced and lined. The final total on material used to fill the void on the backside of the conductor casing was 175 sacks of dry cement, 35 sacks of Benseal, 9 tons of gravel and 125 sacks of class A grouted from the surface.
0152084698 2009-04-28 Drill / Deepen / Reopen No Violations The tank battery is under construction. The site has been rough graded and the access road has been relocated to the southeast corner of the asphalt paved parking lot. The access road with direct access to Revere Road has been removed.
0230108557 2010-04-20 Preliminary Restoration No Violations Preliminary restoration is approved.
0253095275 2009-03-31 Drill / Deepen / Reopen No Violations The well has been fraced and the tank battery equipment is on site. No violations at this time.
0375556002 2009-03-04 Drill / Deepen / Reopen No Violations Wildcat is drilling ahead and should finish drilling within 24 hours. To date, the rig crew has poured 70 sacks of Quikrete in the annular space and is shoveling in 8 tons of bank run gravel to try and fill the void. I suggested that they place and hydrate either 1/2 or 3/4 bentonite hole plug before using more dry cement.
0681582938 2009-04-08 Drill / Deepen / Reopen No Violations The well has been fraced and the site is being rough graded. The tank battery is being assembled. No violations at this time.
0708604559 2018-08-27 UrbanProduction Wells No Violations Access to the wellhead and tank battery was gained through a locked gate in the southeast corner of the parking lot for the West Hill Baptist Church. The wellhead was landscaped and secured with a locked board on board fence. I. D. signage was posted. The well was operated as a plunger lift well. A domestic gas connection with meter was attached to the casing. No leaks were found. The tank battery was surrounded with a board on board locked fence and earthen dike. I. D. signage was posted. The tank battery was comprised of one (1) 140 barrel stock tank, one (1) 50 barrel poly brine tank, one (1) 2408 separator and one (1) Dominion / EOG meter station. The 140 stock tank had a carbon filter, pressure relief valve, lightning arrestor and latching hatch lid. The load lines were locked and plugged. No leaks were found.
0757800493 2009-02-19 Drill / Deepen / Reopen No Violations The entrance and the lease road have been built. The required signage and permit are posted. The rig should arrive by February 26.
0858081414 2009-06-29 Production Wells No Violations The well has just been placed in production. The required fencing has been placed around the tank battery but still needs to be placed around the well. According to Dale Nething, the fence was not installed because they needed a swab rig to kick the well off. The fence will be installed this week.
1083075828 2009-03-17 Drill / Deepen / Reopen No Violations The drilling pits have been solidified and covered over. The concern at this time is that the new grade will be higher than the original, which will alter drainage patterns. The location will be monitored as reclamation progresses. No violations at this time.
152084698 2009-4-28 0:00: DD No Violations
1758699446 2009-02-27 Drill / Deepen / Reopen No Violations Wildcat is drilling surface hole. The shale pit has been dug and lined and the blow pit is being dug. The excavated material is primarily clay.
2086309548 2009-03-03 Drill / Deepen / Reopen No Violations Wildcat is drilling ahead. The pits are smaller than usual but are lined and fenced. The backside of the conductor casing still has a large void and will need to be filled before TD is reached.
26007329 2009-3-9 0:00:0 DD No Violations
375556002 2009-3-4 0:00:0 DD No Violations
681582938 2009-4-8 0:00:0 DD No Violations
708604559 2018-8-27 0:00: UP No Violations

For data sources see[9]

References