If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-23077 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.04,"lon":-81.48,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: OHIO VALLEY ENERGY SYSTEMS COR | |
Well Pad ID: | |
Farm/Lease Name: WRIGHT | |
License Status: Producing | |
License Date: 2009-04-13 | |
Spud Date: 2010-02-26 | |
Spud Drilling Contractor: WILDCAT DRILLING | |
Final Drill Date: 2010-03-01 | |
Well Total Depth: 4219.00 ft | |
Configuration: Vertical | |
Latitude: 41.040000 | |
Longitude: -81.480000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2009-04-13 | Proposed Formations:OHIO SHALE THRU CLINTON, Issued Date:4/13/2009, Expired Date:4/13/2010 6:00:00 AM, Drilling unit acres:41.03, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2010-03-01 | |
Construction Permit Expires | 2010-04-13 | |
Completion Report Received | 2010-06-22 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2010-08-26 | 3942 | 3990 | 78 |
3942 | 3990 | 78 | |
3942 | 3990 | 78 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 2167 Bbl | 0 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2010 | OHIO VALLEY ENERGY SYSTEMS COR | 1028.00 | 0.00 | 10 |
2011 | OHIO VALLEY ENERGY SYSTEMS COR | 66426.00 | 902.00 | 365 |
2012 | OHIO VALLEY ENERGY SYSTEMS COR | 55042.00 | 411.00 | 366 |
2013 | OHIO VALLEY ENERGY SYSTEMS COR | 35420.00 | 342.00 | 365 |
2014 | OHIO VALLEY ENERGY SYSTEMS COR | 31998.00 | 360.00 | 365 |
2015 | OHIO VALLEY ENERGY SYSTEMS COR | 23153.00 | 262.00 | 365 |
2016 | OHIO VALLEY ENERGY SYSTEMS COR | 8137.00 | 60.00 | 365 |
2017 | OHIO VALLEY ENERGY SYSTEMS COR | 8648.00 | 147.00 | 365 |
2018 | OHIO VALLEY ENERGY SYSTEMS COR | 12787.00 | 215.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2010 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 2217 | 10 |
2011 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 698 | 365 |
2012 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 132 | 366 |
2013 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 290 | 365 |
2014 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 157 | 365 |
2015 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 203 | 365 |
2016 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 0 | 365 |
2017 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 0 | 365 |
2018 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 103 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1598822197 | 2010-5-6 0:00:0 | DD | No Violations | |
-2068367688 | 2011-6-6 0:00:0 | PL | No Violations | |
-22310618 | 2010-4-20 0:00: | DD | No Violations | |
-691063533 | 2010-9-9 0:00:0 | DD | No Violations | |
-731170947 | 2010-3-10 0:00: | DD | No Violations | |
0022310618 | 2010-04-20 | Drill / Deepen / Reopen | No Violations | The area around the wellhead has been graded and stoned with concrete barriers for protection. The tank battery still needs to be built prior to turn on. The well and tank battery are located in a stone parking lot and will require little in the way of reclamation. |
0239687118 | 2010-03-02 | Drill / Deepen / Reopen | No Violations | Wildcat Drilling is moving off location. The pits are fenced, lined and in good condition. |
0691063533 | 2010-09-09 | Drill / Deepen / Reopen | No Violations | Well and tank battery are completed and waiting for a turn on date. |
0731170947 | 2010-03-10 | Drill / Deepen / Reopen | No Violations | The pits have been solidified and are being covered in stages. The pit area will remain fenced until the entire area is brought up to grade. The concrete barriers still protect the wellhead. |
0792636748 | 2010-01-26 | Drill / Deepen / Reopen | No Violations | Wildcat Drilling is on site and spudded the well. The working pit is lined and in good condition. The blow pit is being dug. The fence is also being installed. |
0878029787 | 2010-03-04 | Drill / Deepen / Reopen | No Violations | The drilling pits have been pumped down and the concrete barriers have been placed around the wellhead for protection. The pits are still fenced and lined. No violations at this time. |
1222414846 | 2010-05-25 | Drill / Deepen / Reopen | No Violations | The well is ready to turn on as soon as the pipeline connections are made. The tank battery and well are fenced and secured. I will contact OVE about placing bollards around the wellhead for added protection. |
1267823557 | 2010-03-01 | Drill / Deepen / Reopen | No Violations | Wildcat has finished drilling the well and is laying down drill pipe prior to logging the well. The pits are lined, fenced and in good condition. |
1273754303 | 2010-05-06 | Drill / Deepen / Reopen | No Violations | The tank battery is built and waiting to turn the well on. |
1444501477 | 2010-02-22 | Drill / Deepen / Reopen | No Violations | Dons Excavating is on site to build the drilling location. Wildcat is scheduled to arrive on site Thursday 2/24. The required signage and the permit are posted at the lease entrance. |
1598822197 | 2010-05-06 | Drill / Deepen / Reopen | No Violations | The tank battery is being built and the well has been completed. |
2068367688 | 2011-06-06 | Preliminary Restoration | No Violations | The site has been reclaimed, the parking lot rebuilt, the security fence is in place, the identification is posted and the well is in production. Preliminary restoration is approved. |
239687118 | 2010-3-2 0:00:0 | DD | No Violations | |
792636748 | 2010-1-26 0:00: | DD | No Violations | |
878029787 | 2010-3-4 0:00:0 | DD | No Violations |
For data sources see[9]