If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-23083 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.94,"lon":-81.62,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: DOMINION EAST OHIO | |
Well Pad ID: | |
Farm/Lease Name: ROBIL UNIT | |
License Status: Storage Well | |
License Date: 2014-03-05 | |
Spud Date: 2010-03-01 | |
Spud Drilling Contractor: WHIPSTOCK OHIO DRILLING | |
Final Drill Date: 2010-03-08 | |
Well Total Depth: 3956.00 ft | |
Configuration: Vertical | |
Latitude: 40.940000 | |
Longitude: -81.620000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2009-06-08 | Proposed Formations:CLINTON, Issued Date:6/8/2009, Expired Date:6/8/2010 6:00:00 AM, Drilling unit acres:60, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2010-03-08 | |
Completion Report Received | 2010-03-29 | |
Change of Owner | 2010-04-30 | Operator changed from 8321, DOMINION EXPL& PROD INC to 8632, DOMINION FIELD SERVICES INC |
Change of Owner | 2014-02-20 | Operator changed from 8632, DOMINION FIELD SERVICES INC to 240, DOMINION EAST OHIO |
APP | 2014-03-05 | Proposed Formations:CLINTON, Issued Date:3/5/2014, Expired Date:3/4/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:SO, Proposed Well Class: |
Construction Permit Expires | 2015-03-05 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2010-05-27 | 3798 | 3839 | 24 |
3798 | 3839 | 24 | |
3798 | 3839 | 24 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
N2 | 0 | 609 Mscf | 64854 | FRAC USED 1802 BBLS OF WATER |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2010 | DOMINION FIELD SERVICES INC | 2947.00 | 0.00 | 245 |
2011 | DOMINION EAST OHIO | 0.00 | 0.00 | 365 |
2012 | DOMINION FIELD SERVICES INC | 0.00 | 43.00 | 0 |
2013 | DOMINION FIELD SERVICES INC | 1865.00 | 62.00 | 355 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2010 | DOMINION FIELD SERVICES INC | Brine | 1072 | 245 |
2011 | DOMINION EAST OHIO | Brine | 0 | 365 |
2012 | DOMINION FIELD SERVICES INC | Brine | 0 | 0 |
2013 | DOMINION FIELD SERVICES INC | Brine | 1701 | 355 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1274058572 | 2019-2-20 0:00: | SO | No Violations | 0.50 |
-1992254804 | 2010-3-19 0:00: | DD | No Violations | |
-223651861 | 2017-1-30 0:00: | SO | No Violations | |
-286860378 | 2011-6-7 0:00:0 | PL | No Violations | |
-429049898 | 2014-12-26 0:00 | UP | No Violations | |
0042668564 | 2010-04-16 | Production Wells | No Violations | The required fencing has been installed and the well is in production. No violations at this time. |
0067015201 | 2010-03-01 | Drill / Deepen / Reopen | No Violations | Whipstock Drilling Rig 1 spudded the well and is drilling the conductor hole. The conductor casing will not be cemented in. |
0223651861 | 2017-01-30 | Storage Well | No Violations | At the time of this inspection, the well was equipped with an electric motor on a pumpjack. The valves on the wellhead were closed and locked. The well was fenced and locked. The tank battery consisted of one 100 BBL production tank, one 50 BBL poly brine tank and two mechanical separators. The valves on the separators were closed. The tank battery was diked and fenced with a locked man door. The proper, legible signage was located at the tank battery and the lease access was stable. No violations were observed. |
0286860378 | 2011-06-07 | Preliminary Restoration | No Violations | The site has been reclaimed, the vegetation has established, the security fence is in place, the identification is posted and the well is in production. Preliminary restoration is approved. |
0429049898 | 2014-12-26 | UrbanProduction Wells | No Violations | I was on location to conduct a status check of this well. The wellhead has a pump jack connected to it. The tank battery consists of a 140 BBL production tank, mechanical separator, a 1500 gallon poly brine tank. The valves at the wellhead were open. The low pressure relief valve, spark arrestor and charcoal filter were installed on the 140 BBL production tank. The tank battery was diked. The fencing around the tank battery and wellhead is an 8 foot high chain link fence and topped with three strands of barbed wire. The man doors to the well and tank battery were locked. The well is properly identified with a clear, legibly marked well identification sign. The lease road is stable and drivable. No violations found. |
0624620663 | 2018-03-15 | Storage Well | No Violations | I did a status check inspection for this storage well. The well is equipped with a pumpjack. The diked tank battery consists of a steel tank, a plastic brine tank, two vertical separators and two meters. The well is legibly identified. The well and tank battery are fenced in, gated and locked. No compliance issues are cited at this time. |
0665596226 | 2010-02-22 | Drill / Deepen / Reopen | No Violations | Daily Excavating is on site building the lease road and clearing the drilling location. The required permit and signage are posted. |
0679438473 | 2010-03-16 | Drill / Deepen / Reopen | No Violations | Bishop Well Service and Halliburton Services were on site to frac the well. The drilling pits are still open but are lined, fenced and in good condition. The pits are scheduled to be closed later this week. |
1274058572 | 2019-02-20 | Storage Well | No Violations | My inspection found the well is equipped with a pumpjack. The diked tank battery consists of a steel tank, a plastic brine tank, two vertical separators and two meters. The well is legibly identified. The well and tank battery are fenced in, gated and locked. No compliance issues are cited at this time. |
1600143284 | 2010-02-17 | Drill / Deepen / Reopen | No Violations | Daily Excavating is on site to build the lease road. The entrance location and direction has changed due to legal concerns with the property proposed for access. Dominion was directed to provide a new map showing the new location. |
1620237521 | 2010-04-12 | Production Wells | No Violations | The well has been turned into line before the required fence has been installed. I called Dominion and requested that they shut the well in until the fence is installed. The affected area is being graded and will be seeded and mulched in the near future. |
1906586126 | 2010-03-08 | Drill / Deepen / Reopen | No Violations | Whipstock is drilling ahead with a 6-1/2 bit and slimhole collars. The drilling pits are fenced, lined and in good condition. |
1958133341 | 2010-02-26 | Drill / Deepen / Reopen | No Violations | Whipstock Drilling is on site and rigged up. The plan is to dig the pits and spud the well on Monday 3/1. |
1992254804 | 2010-03-19 | Drill / Deepen / Reopen | No Violations | Bishop Well Service and Daily Excavating are on site. The drilling pits have been solidified and Daily is covering them over. The well was fraced and Bishop is blowing the well down to recover excess nitrogen used during the completion. |
42668564 | 2010-4-16 0:00: | PW | No Violations | |
429702152 | 2020-6-25 0:00: | SO | No Violations | 0.50 |
624620663 | 2018-3-15 0:00: | SO | No Violations | 0.50 |
665596226 | 2010-2-22 0:00: | DD | No Violations | |
67015201 | 2010-3-1 0:00:0 | DD | No Violations | |
679438473 | 2010-3-16 0:00: | DD | No Violations |
For data sources see[9]