If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-23100 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.01,"lon":-81.51,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: SOUND ENERGY CO INC | |
Well Pad ID: | |
Farm/Lease Name: GRIFFIS | |
License Status: Producing | |
License Date: 2009-11-23 | |
Spud Date: 2010-01-06 | |
Spud Drilling Contractor: ADVENT DRLG | |
Final Drill Date: 2010-01-12 | |
Well Total Depth: 4297.00 ft | |
Configuration: Directional | |
Latitude: 41.010000 | |
Longitude: -81.510000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2009-11-23 | Proposed Formations:CLINTON, Issued Date:11/23/2009, Expired Date:11/23/2010 6:00:00 AM, Drilling unit acres:20.64, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2010-01-12 | |
Completion Report Received | 2010-03-12 | |
Correction to Well | 2010-04-02 | CORRECTION TO TARGET INFORMATION: 291'SL & 5305'EL OF TRACT 11/X= 2,272, 878/Y= 494,361 (AS DRILLED SURVEY). |
Construction Permit Expires | 2010-11-23 | |
Change of Owner | 2015-05-12 | Operator changed from 7626, M & M ROYALTY LTD to 4327, SOUND ENERGY CO INC |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2010-06-17 | 4092 | 4168 | 74 |
4092 | 4168 | 74 | |
4092 | 4168 | 74 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 1500 Bbl | 60000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2010 | M & M ROYALTY LTD | 11669.00 | 626.00 | 365 |
2011 | M & M ROYALTY LTD | 34535.00 | 401.00 | 365 |
2012 | M & M ROYALTY LTD | 15663.00 | 378.00 | 366 |
2013 | M & M ROYALTY LTD | 12135.00 | 249.00 | 365 |
2014 | M & M ROYALTY LTD | 6512.00 | 118.00 | 365 |
2015 | SOUND ENERGY CO INC | 3844.00 | 173.00 | 305 |
2016 | SOUND ENERGY CO INC | 4701.00 | 122.00 | 365 |
2017 | SOUND ENERGY CO INC | 4268.00 | 120.00 | 365 |
2018 | SOUND ENERGY CO INC | 4642.00 | 123.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2010 | M & M ROYALTY LTD | Brine | 913 | 365 |
2011 | M & M ROYALTY LTD | Brine | 307 | 365 |
2012 | M & M ROYALTY LTD | Brine | 371 | 366 |
2013 | M & M ROYALTY LTD | Brine | 252 | 365 |
2014 | M & M ROYALTY LTD | Brine | 217 | 365 |
2015 | SOUND ENERGY CO INC | Brine | 181 | 305 |
2016 | SOUND ENERGY CO INC | Brine | 80 | 365 |
2017 | SOUND ENERGY CO INC | Brine | 242 | 365 |
2018 | SOUND ENERGY CO INC | Brine | 198 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1297778768 | 2011-6-22 0:00: | PL | No Violations | |
-163563265 | 2010-4-2 0:00:0 | DD | No Violations | |
-1905118627 | 2010-1-7 0:00:0 | DD | No Violations | |
-27461738 | 2010-2-17 0:00: | DD | No Violations | |
-940191397 | 2010-2-18 0:00: | DD | No Violations | |
0027461738 | 2010-02-17 | Drill / Deepen / Reopen | No Violations | Turbo Excavating and Chem Tech are on site to solidify the drilling pits. One load of dust was applied to each pit which will be left open overnight to continue setting. No violations at this time. |
0163563265 | 2010-04-02 | Drill / Deepen / Reopen | No Violations | The tank battery is under construction and the site has been rough graded. Turn on should be in the near future. No violations at this time. |
0320719505 | 2010-01-14 | Drill / Deepen / Reopen | No Violations | Advent Drilling has finished the well and rigged down. The rig and equipment are scheduled to move on Friday January 15. |
0460366187 | 2010-01-11 | Drill / Deepen / Reopen | No Violations | Advent is drilling ahead at 3300. The pits are lined, fenced and in good condition. No violations at this time. |
0922572770 | 2009-12-15 | Drill / Deepen / Reopen | No Violations | Neal Crowl was on site to start building the drilling location. Advent Drilling is scheduled to arrive on site just after the first of the year. |
0940191397 | 2010-02-18 | Drill / Deepen / Reopen | No Violations | The pits have been solidified and are now ready to be covered. The well has been fraced and is ready for a pump jack and the tank battery. No violtions at this time. |
1263590907 | 2010-01-12 | Drill / Deepen / Reopen | No Violations | Advent is drilling ahead and should TD the well later today. The plan is to finish the well and to shut down until Friday when the rig will be moved to the Gospel Tabernacle well (153-3074). The pits are fenced, lined and in good condition. |
1264029119 | 2010-01-20 | Drill / Deepen / Reopen | No Violations | The pits are fenced, lined, and have been pumped down. The site has also been rough graded. |
1266872156 | 2010-02-11 | Drill / Deepen / Reopen | No Violations | M&M called and, for scheduling reasons, requested permission to solidify the pits at the Gospel Tabernacle well (PN-3074) before the Griffis well. Permission was granted and the pits at the Gospel Tabernacle well were solidified the first week of February. The Griffis is schedulued to be solidified on February 17. The pits have been pumped down and are fenced and in good condition. |
1275407444 | 2010-05-24 | Production Wells | No Violations | The well is now in production. The required security fencing is in place and the identification is posted. Preliminary restoration is due later this summer. |
1297778768 | 2011-06-22 | Preliminary Restoration | No Violations | The affected areas have been graded, seeded and are growing. The containment dike, security fence and well identification are in place and the well is in production. Preliminary restoration is approved. |
1304641513 | 2010-04-30 | Drill / Deepen / Reopen | No Violations | The tank battery is under construction and the location is being reclaimed. The well should be ready for turn on in the near future. |
1381773410 | 2009-12-21 | Drill / Deepen / Reopen | No Violations | Turbo Excavating was on site to build the entrance and lease road. The drilling rig should arrive the second week of January. The required identification is posted at the lease entrance. |
1524708402 | 2010-01-06 | Drill / Deepen / Reopen | No Violations | Advent was mixing mud and preparing to spud the well this morning. The pits are fenced, lined and in good condition. No violations at this time. |
1785107193 | 2010-01-04 | Drill / Deepen / Reopen | No Violations | Turbo excavating was on site to dig and fence the drilling pits. Advent Drilling is scheduled to arrive on site on 1/05. The required information is posted at the lease road entrance. |
1905118627 | 2010-01-07 | Drill / Deepen / Reopen | No Violations | Advent is drilling the surface hole with a 12-1/4 PDC bit. They should be ready to set surface casing either late tonight or tomorrow morning. The pits are fenced, lined and in good condition. The required signage is posted and the permit is on location. |
2102627270 | 2010-01-05 | Drill / Deepen / Reopen | No Violations | Advent Drilling is on site and rigging up. The plan is to mix drilling mud and spud the well on 1/06. Expect to encounter 250+ feet of glacial drift at this location. |
320719505 | 2010-1-14 0:00: | DD | No Violations | |
460366187 | 2010-1-11 0:00: | DD | No Violations | |
922572770 | 2009-12-15 0:00 | DD | No Violations |
For data sources see[9]