If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-23102 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.05,"lon":-81.45,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: DISCOVERY OIL AND GAS | |
Well Pad ID: | |
Farm/Lease Name: BRANDEMERE APARTMENTS | |
License Status: Producing | |
License Date: 2009-12-09 | |
Spud Date: 2010-01-27 | |
Spud Drilling Contractor: POULSON DRILLING | |
Final Drill Date: 2010-02-03 | |
Well Total Depth: 4111.00 ft | |
Configuration: Vertical | |
Latitude: 41.050000 | |
Longitude: -81.450000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2009-12-09 | Proposed Formations:CLINTON, Issued Date:12/9/2009, Expired Date:12/9/2010 6:00:00 AM, Drilling unit acres:20.79, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2010-02-03 | |
Completion Report Received | 2010-04-13 | |
Construction Permit Expires | 2010-12-09 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2010-07-13 | 3924 | 3968 | 31 |
3924 | 3968 | 31 | |
3924 | 3968 | 31 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 7 | 1785 Bbl | 60000 | 1000 GALLONS HCL ACID |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2010 | DISCOVERY OIL AND GAS | 0.00 | 541.00 | 50 |
2011 | DISCOVERY OIL AND GAS | 15353.00 | 4646.00 | 365 |
2012 | DISCOVERY OIL AND GAS | 9014.00 | 3457.00 | 366 |
2013 | DISCOVERY OIL AND GAS | 6873.00 | 2694.00 | 365 |
2014 | DISCOVERY OIL AND GAS | 6460.00 | 2246.00 | 365 |
2015 | DISCOVERY OIL AND GAS | 5833.00 | 1938.00 | 365 |
2016 | DISCOVERY OIL AND GAS | 5708.00 | 1719.00 | 365 |
2017 | DISCOVERY OIL AND GAS | 4934.00 | 1616.00 | 365 |
2018 | DISCOVERY OIL AND GAS | 5255.00 | 1363.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2010 | DISCOVERY OIL AND GAS | Brine | 150 | 50 |
2011 | DISCOVERY OIL AND GAS | Brine | 1235 | 365 |
2012 | DISCOVERY OIL AND GAS | Brine | 929 | 366 |
2013 | DISCOVERY OIL AND GAS | Brine | 981 | 365 |
2014 | DISCOVERY OIL AND GAS | Brine | 889 | 365 |
2015 | DISCOVERY OIL AND GAS | Brine | 925 | 365 |
2016 | DISCOVERY OIL AND GAS | Brine | 834 | 365 |
2017 | DISCOVERY OIL AND GAS | Brine | 737 | 365 |
2018 | DISCOVERY OIL AND GAS | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1270331041 | 2010-2-17 0:00: | DD | No Violations | |
-1503332270 | 2010-1-14 0:00: | DD | No Violations | |
-1950583585 | 2010-8-18 0:00: | UL | No Violations | |
-1991162476 | 2010-5-6 0:00:0 | DD | No Violations | |
-2126569772 | 2010-4-2 0:00:0 | DD | No Violations | |
0085839074 | 2010-01-20 | Drill / Deepen / Reopen | No Violations | Daily Excavating is on site building the location. The required signage and the permit are posted. No violations at this time. |
0509675657 | 2010-01-28 | Drill / Deepen / Reopen | No Violations | Poulson is drilling ahead. Set 11-3/4 conductor casing last night and should be ready to set 8-5/8 surface casing later today. The pits are lined and in good condition and the location is fenced. |
0530665120 | 2010-03-01 | Drill / Deepen / Reopen | No Violations | No change in the status of the well or the condition of the location. Still waiting to perforate and frac the well. |
1012162569 | 2010-02-16 | Drill / Deepen / Reopen | No Violations | Daily Excavating and Chem Tech are on site to solidify the drilling pits. The steam and dust cloud caused by the dust application prompted one call from a neighbor to the east. I explained the activity and that it was a one day event which, seemed to address her concerns. |
1266444490 | 2010-02-12 | Drill / Deepen / Reopen | No Violations | The location is secured and pit solidification is scheduled for 2/16. No violations at this time. |
1270331041 | 2010-02-17 | Drill / Deepen / Reopen | No Violations | Daily Excavating was on on site to finish covering the drilling pits. |
1503332270 | 2010-01-14 | Drill / Deepen / Reopen | No Violations | Met on site with representatives of Discovery, Daily Excavating and Poulson Drilling to dig a test hole in the vicinity of the proposed drilling pits to determine the soil type and depth to water. The drilling permit has flood plane conditions that require steel pits. The test pit was dug to 8 feet with a minihoe and encountered approximately 2 feet of sand (fill) over 3 feet of organic rich soil over 2 feet of mixed clay and sand over gravel. Groundwater was not encountered in the test pit. The flood plane conditions are therefore waived. |
1950583585 | 2010-08-18 | UrbanPreliminary Restoration | No Violations | Preliminary restoration is approved. |
1991162476 | 2010-05-06 | Drill / Deepen / Reopen | No Violations | The well is not in production. The tank battery has been built and the site has been graded and seeded. No violations at this time. |
2043728909 | 2010-01-27 | Drill / Deepen / Reopen | No Violations | Poulson Drilling is moving on location and will spud the well later today. All permit conditions have been met. |
2126569772 | 2010-04-02 | Drill / Deepen / Reopen | No Violations | The tank battery is under construction and the site has been rough graded. Turn on should be in the near future. No violations at this time. |
509675657 | 2010-1-28 0:00: | DD | No Violations | |
530665120 | 2010-3-1 0:00:0 | DD | No Violations | |
85839074 | 2010-1-20 0:00: | DD | No Violations |
For data sources see[9]