If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-23108 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.13,"lon":-81.61,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: OHIO VALLEY ENERGY SYSTEMS COR | |
Well Pad ID: | |
Farm/Lease Name: PRIDE ONE | |
License Status: Producing | |
License Date: 2010-04-16 | |
Spud Date: 2010-10-12 | |
Spud Drilling Contractor: WILDCAT DRILLING | |
Final Drill Date: 2010-10-16 | |
Well Total Depth: 3814.00 ft | |
Configuration: Vertical | |
Latitude: 41.130000 | |
Longitude: -81.610000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2010-04-16 | Proposed Formations:OHIO SHALE THRU CLINTON, Issued Date:4/16/2010, Expired Date:4/16/2011 6:00:00 AM, Drilling unit acres:25, Proposed Well Type:OG, Proposed Well Class:POOL |
Correction to Well | 2010-06-25 | UNIT SIZE DECREASED TO 22.84 ACRES. |
Reached Total Depth | 2010-10-16 | |
Completion Report Received | 2011-01-11 | |
Construction Permit Expires | 2011-04-16 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2011-03-04 | 3590 | 3610 | 50 |
3590 | 3610 | 50 | |
3590 | 3610 | 50 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2010-11-09 | H2O | 15 | 3144 Bbl | 60000 | Producers Service Corporation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | OHIO VALLEY ENERGY SYSTEMS COR | 566.00 | 584.00 | 240 |
2012 | OHIO VALLEY ENERGY SYSTEMS COR | 5005.00 | 1542.00 | 336 |
2013 | OHIO VALLEY ENERGY SYSTEMS COR | 6037.00 | 1005.00 | 365 |
2014 | OHIO VALLEY ENERGY SYSTEMS COR | 6673.00 | 583.00 | 365 |
2015 | OHIO VALLEY ENERGY SYSTEMS COR | 7970.00 | 634.00 | 365 |
2016 | OHIO VALLEY ENERGY SYSTEMS COR | 6892.00 | 502.00 | 365 |
2017 | OHIO VALLEY ENERGY SYSTEMS COR | 6312.00 | 399.00 | 365 |
2018 | OHIO VALLEY ENERGY SYSTEMS COR | 5291.00 | 390.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 432 | 240 |
2012 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 482 | 336 |
2013 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 365 | 365 |
2014 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 355 | 365 |
2015 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 385 | 365 |
2016 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 185 | 365 |
2017 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 144 | 365 |
2018 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 180 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1007037184 | 2020-4-8 0:00:0 | UP | No Violations | 1.50 |
-335491995 | 2010-10-19 0:00 | UD | No Violations | |
-370217443 | 2011-9-27 0:00: | PW | No Violations | |
-532790080 | 2011-12-14 0:00 | PL | No Violations | |
-70381202 | 2011-1-25 0:00: | UD | No Violations | |
0070381202 | 2011-01-25 | Urban Drill / Deepen / Reopen | No Violations | The well has been completed and the board-on-board fence has been installed. No indication from the company as to when the well will be turned on. Preliminary restoration is due this spring. |
0335491995 | 2010-10-19 | Urban Drill / Deepen / Reopen | No Violations | Wildcat Drilling has moved off and the pits are fenced, lined and in good condition. Pander Trucking was on site to start removing and transferring pits water to the next location. |
0370217443 | 2011-09-27 | Production Wells | No Violations | Don Nething called to report that, while tripping the tubing string, the well kicked off with the loss of approximately 1/2 barrel of oil. The impacted area was right around the wellhead and the oil was recovered with sorbent pads and peatsorb. The site will be rechecked after the service rig has moved off. |
0532790080 | 2011-12-14 | Preliminary Restoration | No Violations | Preliminary Restoration is approved. |
0740323102 | 2010-10-25 | Urban Drill / Deepen / Reopen | No Violations | The drilling pits have been solidified and covered over. Waiting to perforate and frac the well. No violations at this time. |
1239505616 | 2010-11-09 | Urban Drill / Deepen / Reopen | No Violations | Producers Services is on site to frac the well. There was no indication of any downhole problems. J-Well service rig and crew will run tubing as soon as possible. |
1287693420 | 2010-10-12 | Urban Drill / Deepen / Reopen | No Violations | Wildcat Drilling is on location and working on the rig. The pits are fenced, lined and in good condition. Will spud later today. |
1543246496 | 2018-11-26 | UrbanProduction Wells | No Violations | The wellhead was surrounded with a locked board on board fence. I. D. signage was posted and legible. The well was operated a an electric pumping well. The 8.625 annulus had a manifold plumbed above ground level for monitoring. I did not find any leaks at the wellhead. The tank battery was surrounded with a locked board on board fence and an earthen dike. I.D. signage was posted and legible. The tank battery was comprised of one (1) 140 barrel stock tank, one (1) 50 barrel poly brine tank, one (1) horizontal separator with orifice gas meter. The paper chart on the meter reflected the current production period. The was a Dominion / EOG meter run inside the tank battery. The load lines were plugged and locked. The 140 barrel stock tank had the required carbon filter, lightning arrestor, pressure relief valve and sealing inspection hatch. Access was gained on a gravel drive to the wellhead and tank battery. No leaks were found in the tank battery. |
1602721642 | 2010-10-07 | Urban Drill / Deepen / Reopen | No Violations | The drilling location has been built for Wildcat Drilling who should be moving on 10/11. The required permit is posted. |
740323102 | 2010-10-25 0:00 | UD | No Violations |
For data sources see[9]