If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-23111 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.04,"lon":-81.68,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: INDUSTRY STANDARD SUPPLIES INC | |
Well Pad ID: | |
Farm/Lease Name: GIBSON UNIT | |
License Status: Producing | |
License Date: 2010-05-18 | |
Spud Date: 2010-07-01 | |
Spud Drilling Contractor: POULSON DRILLING | |
Final Drill Date: 2010-07-07 | |
Well Total Depth: 3924.00 ft | |
Configuration: Vertical | |
Latitude: 41.040000 | |
Longitude: -81.680000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2010-05-18 | Proposed Formations:CLINTON, Issued Date:5/18/2010, Expired Date:5/18/2011 6:00:00 AM, Drilling unit acres:29.301, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2010-07-07 | |
Completion Report Received | 2011-02-17 | |
Construction Permit Expires | 2011-05-18 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2011-05-31 | 3725 | 3733 | 33 |
3725 | 3733 | 33 | |
3725 | 3733 | 33 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2010-07-16 | H2O | 15 | 66295 Gal | 35000 | Universal Well Services Inc. |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2010 | INDUSTRY STANDARD SUPPLIES INC | 441.00 | 263.00 | 273 |
2011 | INDUSTRY STANDARD SUPPLIES INC | 3225.00 | 875.00 | 365 |
2012 | INDUSTRY STANDARD SUPPLIES INC | 3104.00 | 500.00 | 366 |
2013 | INDUSTRY STANDARD SUPPLIES INC | 2390.00 | 363.00 | 365 |
2014 | INDUSTRY STANDARD SUPPLIES INC | 2155.00 | 368.00 | 365 |
2015 | INDUSTRY STANDARD SUPPLIES INC | 1597.00 | 362.00 | 365 |
2016 | INDUSTRY STANDARD SUPPLIES INC | 1334.00 | 109.00 | 365 |
2017 | INDUSTRY STANDARD SUPPLIES INC | 1300.00 | 119.00 | 365 |
2018 | INDUSTRY STANDARD SUPPLIES INC | 1049.00 | 206.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2010 | INDUSTRY STANDARD SUPPLIES INC | Brine | 0 | 273 |
2011 | INDUSTRY STANDARD SUPPLIES INC | Brine | 0 | 365 |
2012 | INDUSTRY STANDARD SUPPLIES INC | Brine | 0 | 366 |
2013 | INDUSTRY STANDARD SUPPLIES INC | Brine | 71 | 365 |
2014 | INDUSTRY STANDARD SUPPLIES INC | Brine | 0 | 365 |
2015 | INDUSTRY STANDARD SUPPLIES INC | Brine | 0 | 365 |
2016 | INDUSTRY STANDARD SUPPLIES INC | Brine | 0 | 365 |
2017 | INDUSTRY STANDARD SUPPLIES INC | Brine | 34 | 365 |
2018 | INDUSTRY STANDARD SUPPLIES INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1612931203 | 2011-11-16 0:00 | UL | No Violations | |
-2057685150 | 2010-8-9 0:00:0 | DD | No Violations | |
0102068552 | 2010-07-06 | Drill / Deepen / Reopen | No Violations | Poulson Drilling is drilling ahead with air/soap. Should TD the well tomorrow morning. The pits are fenced, lined and in good condition. |
0380140267 | 2010-08-24 | Urban Drill / Deepen / Reopen | No Violations | The required security fencing is installed and the well is being pumped up. No violations at this time. |
0689527107 | 2011-05-13 | UrbanProduction Wells | No Violations | The inspection was for preliminary restoration. There are erosion gullies along the lease road that need repaired and the required identification was missing. I contacted Tim Levengood and requested that these issues be corrected immediately. |
102068552 | 2010-7-6 0:00:0 | DD | No Violations | |
1278614516 | 2010-07-01 | Drill / Deepen / Reopen | No Violations | Poulson Drilling is moving on location and Hugh Palmer is digging the pits. |
1279156459 | 2010-07-07 | Drill / Deepen / Reopen | No Violations | Poulson Drilling is laying down drill pipe and should be ready to cement 4-1/2 production casing tonight. The pits are lined, fenced and in good condition. |
1282612114 | 2010-08-16 | Urban Drill / Deepen / Reopen | No Violations | Chem Tech is on site to solidify the drilling pits. The tank battery has been built and the required security fencing is being installed. No violations at this time. |
1286213159 | 2010-09-30 | UrbanProduction Wells | No Violations | The well is in production. The affected area has been graded and seeded and preliminary restoration will be approved as soon as the seed germinates. |
1612931203 | 2011-11-16 | UrbanPreliminary Restoration | No Violations | Preliminary Restoration is approved. |
1705123049 | 2010-06-22 | Drill / Deepen / Reopen | No Violations | ISSI has started clearing trees for the lease road and the drilling location. The permit has not been posted as required and I called Mike Abernathy for posting immediately. |
1890503573 | 2010-07-13 | Drill / Deepen / Reopen | No Violations | The frac tanks are being filled and the well is scheduled to be fraced next week. The pits are still open but are fenced, lined and in good condition. |
1951973113 | 2010-07-21 | Drill / Deepen / Reopen | No Violations | No change in the status of this well. The pits are fenced, lined and in good condition. |
1981521685 | 2010-07-15 | Drill / Deepen / Reopen | No Violations | The drilling pits are still open but are fenced, lined and in good condition. |
2057685150 | 2010-08-09 | Drill / Deepen / Reopen | No Violations | The drilling pits are still open and must be closed as soon as possible. I called Tim Levengood who said that 153-3110 would be solidified on 8/12 and this well will be solidified on 8/16. |
380140267 | 2010-8-24 0:00: | UD | No Violations | |
689527107 | 2011-5-13 0:00: | UP | No Violations |
For data sources see[9]