X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-153-23112

Well Details

Well ID: 34-153-23112
Loading map...
Country: United States
State: Ohio
County: <County>
Municipality:
Operator Name: EVERFLOW EASTERN PARTNERS LP
Well Pad ID:
Farm/Lease Name: AKRON FULTON AIRPORT
License Status: Producing
License Date: 2010-05-28
Spud Date: 2010-10-06
Spud Drilling Contractor: WILDCAT DRILLING
Final Drill Date: 2010-10-10
Well Total Depth: 4214.00 ft
Configuration: Vertical
Latitude: 41.030000
Longitude: -81.480000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2010-05-28 Proposed Formations:CLINTON, Issued Date:5/28/2010, Expired Date:5/28/2011 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2010-10-10
Completion Report Received 2010-11-16
Construction Permit Expires 2011-05-28
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2011-01-05 3948 4008 49
3948 4008 49
3948 4008 49

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2010-10-20 H2O 7 2380 Bbl 60000 Universal Well Services Inc.

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2011 EVERFLOW EASTERN PARTNERS LP 66729.00 3118.00 361
2012 EVERFLOW EASTERN PARTNERS LP 79884.00 2022.00 366
2013 EVERFLOW EASTERN PARTNERS LP 42697.00 1110.00 365
2014 EVERFLOW EASTERN PARTNERS LP 21875.00 985.00 365
2015 EVERFLOW EASTERN PARTNERS LP 8476.00 469.00 365
2016 EVERFLOW EASTERN PARTNERS LP 1005.00 0.00 365
2017 EVERFLOW EASTERN PARTNERS LP 3865.00 348.00 365
2018 EVERFLOW EASTERN PARTNERS LP 3843.00 320.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2011 EVERFLOW EASTERN PARTNERS LP Brine 1415 361
2012 EVERFLOW EASTERN PARTNERS LP Brine 577 366
2013 EVERFLOW EASTERN PARTNERS LP Brine 353 365
2014 EVERFLOW EASTERN PARTNERS LP Brine 214 365
2015 EVERFLOW EASTERN PARTNERS LP Brine 33 365
2016 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2017 EVERFLOW EASTERN PARTNERS LP Brine 70 365
2018 EVERFLOW EASTERN PARTNERS LP Brine 150 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1826927284 2011-1-25 0:00: UP No Violations
-1840147193 2010-10-4 0:00: UD No Violations
-446768733 2010-10-8 0:00: UD No Violations
-562694536 2010-10-6 0:00: UD No Violations
0335981506 2010-10-19 Urban Drill / Deepen / Reopen No Violations The drilling pits have been solidified and covered. The affected area has been rough graded. Frac tanks and the service rig are on site to complete the well.
0446768733 2010-10-08 Urban Drill / Deepen / Reopen No Violations Wildcat is drilling ahead. The pits are fenced, lined and in good condition. No violations at this time.
0562694536 2010-10-06 Urban Drill / Deepen / Reopen No Violations Wildcat Drilling spudded the well today. The drilling pits are fenced, lined and in good condition. No violations at this time.
1175766504 2011-07-05 Preliminary Restoration No Violations The affected areas have been graded, seeded and are growing. The containment dike, security fence and well identification are in place and the well is in production. Preliminary restoration is approved.
1285784923 2010-09-29 Urban Drill / Deepen / Reopen No Violations The drilling location has been built and the rig is scheduled to arrive early next week. The required identification is posted and the silt fence is in place.
1826927284 2011-01-25 UrbanProduction Wells No Violations The well is in production. Preliminary restoration will be evaluated after the snow in gone and the site can be inspected.
1840147193 2010-10-04 Urban Drill / Deepen / Reopen No Violations Wildcat Drilling is moving on location but will not spud until 10/6 per FAA permit conditions. The pits have been dug, lined and fenced as required by MRM permit. No violations at this time.
335981506 2010-10-19 0:00 UD No Violations

For data sources see[9]

References