If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-23113 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.03,"lon":-81.48,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: OHIO VALLEY ENERGY SYSTEMS COR | |
Well Pad ID: | |
Farm/Lease Name: BLIMP CITY | |
License Status: Producing | |
License Date: 2010-07-01 | |
Spud Date: 2011-03-28 | |
Spud Drilling Contractor: | |
Final Drill Date: 2011-04-04 | |
Well Total Depth: 4318.00 ft | |
Configuration: Directional | |
Latitude: 41.030000 | |
Longitude: -81.480000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2010-07-01 | Proposed Formations:OHIO SHALE THRU CLINTON, Issued Date:7/1/2010, Expired Date:7/1/2011 6:00:00 AM, Drilling unit acres:42.28, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2011-04-04 | |
Correction to Well | 2011-05-20 | CORRECTION TO TARGET INFORMATION : FOOTAGE= 12,260'NL & 550'EL OF TRACT 1; X=2,280,240 AND Y= 499,635. |
Completion Report Received | 2011-05-23 | |
Construction Permit Expires | 2011-07-01 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2011-08-04 | 3990 | 4026 | 30 |
3990 | 4026 | 30 | |
3990 | 4026 | 30 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2011-05-03 | H2O | 15 | 77000 Gal | 44000 | Producers Service Corporation | Ball off
Start sand at 3/4 ppg and finish at 1 ppg |
2011-05-03 | H2O | 15 | 77000 Gal | 44000 | Producers Service Corporation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | OHIO VALLEY ENERGY SYSTEMS COR | 11918.00 | 1135.00 | 75 |
2012 | OHIO VALLEY ENERGY SYSTEMS COR | 49349.00 | 1165.00 | 366 |
2013 | OHIO VALLEY ENERGY SYSTEMS COR | 21519.00 | 606.00 | 365 |
2014 | OHIO VALLEY ENERGY SYSTEMS COR | 12781.00 | 471.00 | 365 |
2015 | OHIO VALLEY ENERGY SYSTEMS COR | 9764.00 | 242.00 | 365 |
2016 | OHIO VALLEY ENERGY SYSTEMS COR | 6689.00 | 177.00 | 365 |
2017 | OHIO VALLEY ENERGY SYSTEMS COR | 4478.00 | 312.00 | 365 |
2018 | OHIO VALLEY ENERGY SYSTEMS COR | 3968.00 | 137.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 3274 | 75 |
2012 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 554 | 366 |
2013 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 350 | 365 |
2014 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 427 | 365 |
2015 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 157 | 365 |
2016 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 153 | 365 |
2017 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 120 | 365 |
2018 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 165 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1090050963 | 2011-3-29 0:00: | DD | No Violations | |
-1430048878 | 2011-9-7 0:00:0 | UP | No Violations | |
-1903827949 | 2011-5-3 0:00:0 | UD | No Violations | |
-628449558 | 2011-4-21 0:00: | UD | No Violations | |
-731118180 | 2011-3-29 0:00: | DD | No Violations | |
-857964569 | 2011-3-28 0:00: | DD | No Violations | |
0628449558 | 2011-04-21 | Urban Drill / Deepen / Reopen | No Violations | The drilling pits have been solidified and covered over. The frac job is scheduled for the first part of May. No violations at this time. |
0658015976 | 2011-12-13 | UrbanPreliminary Restoration | No Violations | Preliminary Restoration is approved. |
0726521726 | 2011-04-04 | Urban Drill / Deepen / Reopen | No Violations | Wildcat Drilling is laying down drill pipe and Appalachian Well Surveys is on site to run nuclear and electric logs. Wildcat should be ready to run and cement long string later this afternoon. The pits are lined, fenced and in good condition. There is an empty 500 bbl tank on site to pump pit water into during the cementing operation. No violations at this time. |
0730800909 | 2011-03-03 | Urban Drill / Deepen / Reopen | No Violations | The location is being cut and graded in anticipation of the rig arriving within the next 30 days. The identification and permit are posted at the lease entrance. |
0731118180 | 2011-03-29 | Drill / Deepen / Reopen | No Violations | Cementing surface casing.Ray Wallace, Chris Grimm and Jon Brauer |
0857964569 | 2011-03-28 | Drill / Deepen / Reopen | No Violations | Training for new inspectors. Ray Wallace,Chris Grimm. |
1090050963 | 2011-03-29 | Drill / Deepen / Reopen | No Violations | BOP training. Ray Wallace, Chris Grimm and Jon Brauer. |
1303744494 | 2011-04-11 | Urban Drill / Deepen / Reopen | No Violations | The drilling pits are still open but have been pumped down. They are still lined and fenced. Solidification is scheduled for later this week. No violations at this time. |
1304688780 | 2011-05-02 | Urban Drill / Deepen / Reopen | No Violations | Appalachian Well Surveys was on site to perforate the well with steel carriers. J-Well is the service rig. The frac is scheduled for 5/3. |
1430048878 | 2011-09-07 | UrbanProduction Wells | No Violations | The well is in production and the security fence is installed. Preliminary restoration will be approved as soon as the vegetation has been established. Part of the affected area will not be seeded since it is used for the daily business activity on this property. |
1785636776 | 2011-04-05 | Urban Drill / Deepen / Reopen | No Violations | Wildcat Drilling is moving off location. The drilling pits have been pumped down and are lined, fenced and in good condition. No violations at this time. |
1903827949 | 2011-05-03 | Urban Drill / Deepen / Reopen | No Violations | Producers Services is on site to frac the well. The transfer pump on the blender went down and delayed the job after breakdown and before starting sand. The completion data will be entered in the completion module. |
658015976 | 2011-12-13 0:00 | UL | No Violations | |
726521726 | 2011-4-4 0:00:0 | UD | No Violations | |
730800909 | 2011-3-3 0:00:0 | UD | No Violations |
For data sources see[9]