If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-23119 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.94,"lon":-81.63,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: DOMINION EAST OHIO | |
Well Pad ID: | |
Farm/Lease Name: SEBE UNIT NO. | |
License Status: Storage Well | |
License Date: 2014-03-05 | |
Spud Date: 2010-10-28 | |
Spud Drilling Contractor: WHIPSTOCK OHIO DRILLING | |
Final Drill Date: 2011-02-16 | |
Well Total Depth: 4350.00 ft | |
Configuration: Directional | |
Latitude: 40.940000 | |
Longitude: -81.630000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2010-09-01 | Proposed Formations:CLINTON, Issued Date:9/1/2010, Expired Date:8/31/2012 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2011-02-16 | |
Change of Owner | 2014-02-20 | Operator changed from 8632, DOMINION FIELD SERVICES INC to 240, DOMINION EAST OHIO |
APP | 2014-03-05 | Proposed Formations:CLINTON, Issued Date:3/5/2014, Expired Date:3/4/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:SO, Proposed Well Class: |
Construction Permit Expires | 2015-03-05 | |
Record Last Modified | 2015-09-24 |
For data sources see[2]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | DOMINION FIELD SERVICES INC | 11507.00 | 0.00 | 365 |
2012 | DOMINION FIELD SERVICES INC | 7023.00 | 0.00 | 366 |
2013 | DOMINION FIELD SERVICES INC | 2792.00 | 0.00 | 355 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | DOMINION FIELD SERVICES INC | Brine | 0 | 365 |
2012 | DOMINION FIELD SERVICES INC | Brine | 0 | 366 |
2013 | DOMINION FIELD SERVICES INC | Brine | 0 | 355 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1121749397 | 2011-1-27 0:00: | DD | No Violations | |
-1273135239 | 2011-2-14 0:00: | UD | No Violations | |
-1433909327 | 2010-12-2 0:00: | UD | No Violations | |
-1560050465 | 2018-2-15 0:00: | SO | No Violations | 0.50 |
-1924374251 | 2011-2-15 0:00: | UD | No Violations | |
-1952728147 | 2011-4-5 0:00:0 | UD | No Violations | |
-2001990211 | 2010-12-22 0:00 | UD | No Violations | |
-2117340244 | 2017-1-26 0:00: | SO | No Violations | |
-332233041 | 2010-10-13 0:00 | UD | No Violations | |
-369982073 | 2011-3-3 0:00:0 | UD | No Violations | |
-455445039 | 2010-10-28 0:00 | UD | No Violations | |
-491794112 | 2014-12-26 0:00 | UP | No Violations | |
-929824967 | 2011-2-24 0:00: | UD | No Violations | |
-989170800 | 2010-11-2 0:00: | UD | No Violations | |
0332233041 | 2010-10-13 | Urban Drill / Deepen / Reopen | No Violations | Dailey Excavating is building the location. The rig should arrive in the next ten days. |
0369982073 | 2011-03-03 | Urban Drill / Deepen / Reopen | No Violations | The pits have been solidified and covered over. The site has also been graded in anticipation of perforating and fracing in the next week to 10 days. No violations at this time. |
0455445039 | 2010-10-28 | Urban Drill / Deepen / Reopen | No Violations | Whipstock Rig 1 is moving on location and will spud later today. The pits are being dug and will be lined and fenced. |
0491794112 | 2014-12-26 | UrbanProduction Wells | No Violations | I was on location to conduct a status check of this well. The well is of plunger lift construction. The tank battery consists of a 140 BBL production tank, mechanical separator, a 1500 gallon poly brine tank. The valves at the wellhead were open. The low pressure relief valve, spark arrestor and charcoal filter were installed on the 140 BBL production tank. The tank battery was diked. The fencing around the wellhead and tank battery is an 8 foot high chain link fence and topped with three strands of barbed wire. The man doors to the tank battery and well were locked. The well is properly identified with a clear, legibly marked well identification sign. The lease road is stable and drivable. No violations found. |
0929824967 | 2011-02-24 | Urban Drill / Deepen / Reopen | No Violations | Daily Excavating and Chem Tech were on site to solidify and cover the drilling pits. Two loads (approximately 22 tons each) of cement dust will be applied to each pit to solidify. |
0989170800 | 2010-11-02 | Urban Drill / Deepen / Reopen | No Violations | Whipstock Rig 1 has been released by Dominion and has moved entirely off the location. The pits have been pumped down and fenced. According to John Suhar, they are looking for a rig capable of the drilling the directional hole that has been proposed. I told John that the pits could stay open for the near future but would have to be pumped out completely if a rig is not on site within the next two weeks. |
1121749397 | 2011-01-27 | Drill / Deepen / Reopen | No Violations | The drilling rig has been delayed and will not arrive until the second week of February. |
1253886544 | 2019-02-20 | Storage Well | No Violations | My inspection found the well is equipped with a plunger-lift system. The diked tank battery consists of a steel tank, a plastic brine tank, a vertical separator and a meter. The dike and heater are shared with the tank battery for well #153-23045. The well and tank battery are fenced in with locked gates. The well is legibly identified. No compliance issues are cited at this time. |
1273135239 | 2011-02-14 | Urban Drill / Deepen / Reopen | No Violations | Lost 50 bbl of fluid at the base of the Salina. Wildcat mixed starch and gel and healed the lost circulation zone. They will closely monitor the pits for any fluid loss or gain. |
1294067635 | 2010-12-27 | Urban Drill / Deepen / Reopen | No Violations | Dailey Excavating is on site to close the drilling pits. The pits will be redug when the rig arrives to finish drilling the well. |
1294836087 | 2011-01-04 | Urban Drill / Deepen / Reopen | No Violations | The drilling pits have been closed and waiting for a rig to finish drilling the well. According to Don Kreager, they anticipate a rig available by early February. |
1296218434 | 2011-01-25 | Urban Drill / Deepen / Reopen | No Violations | Still waiting for a drilling rig to complete this well. |
1297283137 | 2011-02-09 | Urban Drill / Deepen / Reopen | No Violations | Wildcat Drilling is on site and drilling ahead on air in the directional portion of the hole. The directional driller asked for permission to switch over to fluid drilling after drilling two kellys into the lime. Permission was granted. The drilling pits are lined and in good condition. |
1298391128 | 2011-02-11 | Urban Drill / Deepen / Reopen | No Violations | Status check inspection found Wildcat drilling ahead in the Big Lime as required. The drilling pits are fenced, lined and in good condition. |
1314722013 | 2011-08-22 | Preliminary Restoration | No Violations | Preliminary restoration is approved. |
1433909327 | 2010-12-02 | Urban Drill / Deepen / Reopen | No Violations | No change in the status of this project. According to John Suhar, Dominion still has not arranged for a drilling rig to finish this well. I advised him that the drilling pits will have to be closed if there is any further delay. |
1560050465 | 2018-02-15 | Storage Well | No Violations | I did a status check inspection for this storage well. The well is equipped with a plunger-lift system. The diked tank battery consists of a steel tank, a plastic brine tank, a vertical separator and a meter. The dike and heater are shared with the tank battery for well #153-23045. The well and tank battery are fenced in with locked gates. The well is legibly identified. No compliance issues are cited at this time. |
1623447382 | 2010-11-16 | Urban Drill / Deepen / Reopen | No Violations | Dominion is still trying to locate a drilling rig to finish this well. Since there is no start date, I asked that they empty the pits. The drilling pits have been emptied and are still fenced and lined. |
1924374251 | 2011-02-15 | Urban Drill / Deepen / Reopen | No Violations | Wildcat is drilling ahead and should TD the well tomorrow. No violations at this time. |
1952728147 | 2011-04-05 | Urban Drill / Deepen / Reopen | No Violations | Dailey Excavating is on site to work on site reclamation. The tank battery has been set and the well has been fraced but is not in production. No violations at this time. |
2001990211 | 2010-12-22 | Urban Drill / Deepen / Reopen | No Violations | No change in the status or condition of the drilling location. According to Don Kreager, there is no firm date for a drilling rig to finish this well. Therefore, the drilling pits need to be closed now. Dailey Excavating is scheduled start closure next week. |
2117340244 | 2017-01-26 | Storage Well | No Violations | At the time of this inspection, the well was equipped with a plunger lift assembly and the valves on the wellhead were closed and locked. The well was fenced and locked. The tank battery still contained production equipment and consisted of one 100 BBL production tank, one 50 BBL poly brine tank, a mechanical separator, and a line heater. The valves on the separator were closed. The tank battery was diked and fenced with a locked man door. The proper, legible signage was located at the tank battery. Lease access was stable. No violations at this time. |
For data sources see[7]