34-153-23119

Well Details

Well ID: 34-153-23119
Loading map...
Country: United States
State: Ohio
County: <County>
Municipality:
Operator Name: DOMINION EAST OHIO
Well Pad ID:
Farm/Lease Name: SEBE UNIT NO.
License Status: Storage Well
License Date: 2014-03-05
Spud Date: 2010-10-28
Spud Drilling Contractor: WHIPSTOCK OHIO DRILLING
Final Drill Date: 2011-02-16
Well Total Depth: 4350.00 ft
Configuration: Directional
Latitude: 40.940000
Longitude: -81.630000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2010-09-01 Proposed Formations:CLINTON, Issued Date:9/1/2010, Expired Date:8/31/2012 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2011-02-16
Change of Owner 2014-02-20 Operator changed from 8632, DOMINION FIELD SERVICES INC to 240, DOMINION EAST OHIO
APP 2014-03-05 Proposed Formations:CLINTON, Issued Date:3/5/2014, Expired Date:3/4/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:SO, Proposed Well Class:
Construction Permit Expires 2015-03-05
Record Last Modified 2015-09-24

For data sources see[2]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2011 DOMINION FIELD SERVICES INC 11507.00 0.00 365
2012 DOMINION FIELD SERVICES INC 7023.00 0.00 366
2013 DOMINION FIELD SERVICES INC 2792.00 0.00 355

For data sources see[3] [4]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2011 DOMINION FIELD SERVICES INC Brine 0 365
2012 DOMINION FIELD SERVICES INC Brine 0 366
2013 DOMINION FIELD SERVICES INC Brine 0 355

For data sources see[5] [6]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1121749397 2011-1-27 0:00: DD No Violations
-1273135239 2011-2-14 0:00: UD No Violations
-1433909327 2010-12-2 0:00: UD No Violations
-1560050465 2018-2-15 0:00: SO No Violations 0.50
-1924374251 2011-2-15 0:00: UD No Violations
-1952728147 2011-4-5 0:00:0 UD No Violations
-2001990211 2010-12-22 0:00 UD No Violations
-2117340244 2017-1-26 0:00: SO No Violations
-332233041 2010-10-13 0:00 UD No Violations
-369982073 2011-3-3 0:00:0 UD No Violations
-455445039 2010-10-28 0:00 UD No Violations
-491794112 2014-12-26 0:00 UP No Violations
-929824967 2011-2-24 0:00: UD No Violations
-989170800 2010-11-2 0:00: UD No Violations
0332233041 2010-10-13 Urban Drill / Deepen / Reopen No Violations Dailey Excavating is building the location. The rig should arrive in the next ten days.
0369982073 2011-03-03 Urban Drill / Deepen / Reopen No Violations The pits have been solidified and covered over. The site has also been graded in anticipation of perforating and fracing in the next week to 10 days. No violations at this time.
0455445039 2010-10-28 Urban Drill / Deepen / Reopen No Violations Whipstock Rig 1 is moving on location and will spud later today. The pits are being dug and will be lined and fenced.
0491794112 2014-12-26 UrbanProduction Wells No Violations I was on location to conduct a status check of this well. The well is of plunger lift construction. The tank battery consists of a 140 BBL production tank, mechanical separator, a 1500 gallon poly brine tank. The valves at the wellhead were open. The low pressure relief valve, spark arrestor and charcoal filter were installed on the 140 BBL production tank. The tank battery was diked. The fencing around the wellhead and tank battery is an 8 foot high chain link fence and topped with three strands of barbed wire. The man doors to the tank battery and well were locked. The well is properly identified with a clear, legibly marked well identification sign. The lease road is stable and drivable. No violations found.
0929824967 2011-02-24 Urban Drill / Deepen / Reopen No Violations Daily Excavating and Chem Tech were on site to solidify and cover the drilling pits. Two loads (approximately 22 tons each) of cement dust will be applied to each pit to solidify.
0989170800 2010-11-02 Urban Drill / Deepen / Reopen No Violations Whipstock Rig 1 has been released by Dominion and has moved entirely off the location. The pits have been pumped down and fenced. According to John Suhar, they are looking for a rig capable of the drilling the directional hole that has been proposed. I told John that the pits could stay open for the near future but would have to be pumped out completely if a rig is not on site within the next two weeks.
1121749397 2011-01-27 Drill / Deepen / Reopen No Violations The drilling rig has been delayed and will not arrive until the second week of February.
1253886544 2019-02-20 Storage Well No Violations My inspection found the well is equipped with a plunger-lift system. The diked tank battery consists of a steel tank, a plastic brine tank, a vertical separator and a meter. The dike and heater are shared with the tank battery for well #153-23045. The well and tank battery are fenced in with locked gates. The well is legibly identified. No compliance issues are cited at this time.
1273135239 2011-02-14 Urban Drill / Deepen / Reopen No Violations Lost 50 bbl of fluid at the base of the Salina. Wildcat mixed starch and gel and healed the lost circulation zone. They will closely monitor the pits for any fluid loss or gain.
1294067635 2010-12-27 Urban Drill / Deepen / Reopen No Violations Dailey Excavating is on site to close the drilling pits. The pits will be redug when the rig arrives to finish drilling the well.
1294836087 2011-01-04 Urban Drill / Deepen / Reopen No Violations The drilling pits have been closed and waiting for a rig to finish drilling the well. According to Don Kreager, they anticipate a rig available by early February.
1296218434 2011-01-25 Urban Drill / Deepen / Reopen No Violations Still waiting for a drilling rig to complete this well.
1297283137 2011-02-09 Urban Drill / Deepen / Reopen No Violations Wildcat Drilling is on site and drilling ahead on air in the directional portion of the hole. The directional driller asked for permission to switch over to fluid drilling after drilling two kellys into the lime. Permission was granted. The drilling pits are lined and in good condition.
1298391128 2011-02-11 Urban Drill / Deepen / Reopen No Violations Status check inspection found Wildcat drilling ahead in the Big Lime as required. The drilling pits are fenced, lined and in good condition.
1314722013 2011-08-22 Preliminary Restoration No Violations Preliminary restoration is approved.
1433909327 2010-12-02 Urban Drill / Deepen / Reopen No Violations No change in the status of this project. According to John Suhar, Dominion still has not arranged for a drilling rig to finish this well. I advised him that the drilling pits will have to be closed if there is any further delay.
1560050465 2018-02-15 Storage Well No Violations I did a status check inspection for this storage well. The well is equipped with a plunger-lift system. The diked tank battery consists of a steel tank, a plastic brine tank, a vertical separator and a meter. The dike and heater are shared with the tank battery for well #153-23045. The well and tank battery are fenced in with locked gates. The well is legibly identified. No compliance issues are cited at this time.
1623447382 2010-11-16 Urban Drill / Deepen / Reopen No Violations Dominion is still trying to locate a drilling rig to finish this well. Since there is no start date, I asked that they empty the pits. The drilling pits have been emptied and are still fenced and lined.
1924374251 2011-02-15 Urban Drill / Deepen / Reopen No Violations Wildcat is drilling ahead and should TD the well tomorrow. No violations at this time.
1952728147 2011-04-05 Urban Drill / Deepen / Reopen No Violations Dailey Excavating is on site to work on site reclamation. The tank battery has been set and the well has been fraced but is not in production. No violations at this time.
2001990211 2010-12-22 Urban Drill / Deepen / Reopen No Violations No change in the status or condition of the drilling location. According to Don Kreager, there is no firm date for a drilling rig to finish this well. Therefore, the drilling pits need to be closed now. Dailey Excavating is scheduled start closure next week.
2117340244 2017-01-26 Storage Well No Violations At the time of this inspection, the well was equipped with a plunger lift assembly and the valves on the wellhead were closed and locked. The well was fenced and locked. The tank battery still contained production equipment and consisted of one 100 BBL production tank, one 50 BBL poly brine tank, a mechanical separator, and a line heater. The valves on the separator were closed. The tank battery was diked and fenced with a locked man door. The proper, legible signage was located at the tank battery. Lease access was stable. No violations at this time.

For data sources see[7]