If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-23128 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.03,"lon":-81.48,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: OHIO VALLEY ENERGY SYSTEMS COR | |
Well Pad ID: | |
Farm/Lease Name: RAYL PROPERTIES UNIT | |
License Status: Producing | |
License Date: 2011-03-29 | |
Spud Date: 2011-10-05 | |
Spud Drilling Contractor: WILDCAT DRILLING | |
Final Drill Date: 2011-10-14 | |
Well Total Depth: 4272.00 ft | |
Configuration: Directional | |
Latitude: 41.030000 | |
Longitude: -81.480000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2011-03-29 | Proposed Formations:OHIO SHALE THRU CLINTON, Issued Date:3/29/2011, Expired Date:3/28/2013 12:00:00 PM, Drilling unit acres:49.82, Proposed Well Type:OG, Proposed Well Class:POOL |
Correction to Well | 2011-10-07 | ADDED "FLUID DRILLING REQUIREMENT WAIVER". |
Reached Total Depth | 2011-10-14 | |
Completion Report Received | 2012-01-09 | |
Correction to Well | 2012-02-24 | CORRECTION TO TARGET FOOTAGE & COORDIATES FROM AS DRILLED SURVEY. |
Construction Permit Expires | 2012-03-28 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2012-01-26 | 4002 | 4071 | 70 |
4002 | 4071 | 70 | |
4002 | 4071 | 70 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2011-11-08 | H2O | 15 | 93069 Gal | 60000 | Producers Service Corporation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | OHIO VALLEY ENERGY SYSTEMS COR | 11725.00 | 1004.00 | 113 |
2013 | OHIO VALLEY ENERGY SYSTEMS COR | 49942.00 | 1928.00 | 365 |
2014 | OHIO VALLEY ENERGY SYSTEMS COR | 36936.00 | 1306.00 | 365 |
2015 | OHIO VALLEY ENERGY SYSTEMS COR | 19979.00 | 655.00 | 365 |
2016 | OHIO VALLEY ENERGY SYSTEMS COR | 9437.00 | 178.00 | 365 |
2017 | OHIO VALLEY ENERGY SYSTEMS COR | 10012.00 | 541.00 | 365 |
2018 | OHIO VALLEY ENERGY SYSTEMS COR | 9056.00 | 419.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 0 | 113 |
2013 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 584 | 365 |
2014 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 541 | 365 |
2015 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 290 | 365 |
2016 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 0 | 365 |
2017 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 213 | 365 |
2018 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 250 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1087891842 | 2012-1-25 0:00: | UD | No Violations | |
-1567732515 | 2011-10-31 0:00 | UD | No Violations | |
-2081990623 | 2012-1-18 0:00: | UD | No Violations | |
-235017535 | 2011-10-5 0:00: | UD | No Violations | |
0235017535 | 2011-10-05 | Urban Drill / Deepen / Reopen | No Violations | Wildcat Drilling is moving on location and will spud the well later today. No violations at this time. |
0445920232 | 2011-10-25 | Urban Drill / Deepen / Reopen | No Violations | The drilling pits have been solidified and covered over. No violations at this time. |
0772205744 | 2012-07-10 | Preliminary Restoration | No Violations | Preliminary Restoration is approved. |
1087891842 | 2012-01-25 | Urban Drill / Deepen / Reopen | No Violations | The well and the tank battery have been completed and the security barriers have been set around the well. The salesline is being installed and the well will be turned on after its completion. No violations at this time. |
1092112067 | 2011-10-12 | Urban Drill / Deepen / Reopen | No Violations | Wildcat is drilling at 3800 feet. They should TD the well within 48 hours. The pits are fenced, lined and in good condition. |
1321366504 | 2011-11-08 | Urban Drill / Deepen / Reopen | No Violations | Producers Services was on site to frac the well. There were no indications of well construction problems and the job was completed as planned. No violations at this time. |
1567732515 | 2011-10-31 | Urban Drill / Deepen / Reopen | No Violations | Frac tanks have been moved on location in anticipation of perforating and fracing the well in the near future. |
2081990623 | 2012-01-18 | Urban Drill / Deepen / Reopen | No Violations | The tank battery is under construction and the security fence poles have been set. Waiting for the meter to be set before turn on is possible. I called Ted Hill and requested that the safety bollards be installed around the wellhead as soon as possible. |
445920232 | 2011-10-25 0:00 | UD | No Violations | |
772205744 | 2012-7-10 0:00: | PL | No Violations |
For data sources see[9]