If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-23144 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.24,"lon":-81.47,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: OHIO VALLEY ENERGY SYSTEMS COR | |
Well Pad ID: | |
Farm/Lease Name: LAUREL LAKE | |
License Status: Producing | |
License Date: 2011-10-17 | |
Spud Date: 2011-11-09 | |
Spud Drilling Contractor: WILDCAT DRILLING | |
Final Drill Date: 2011-11-13 | |
Well Total Depth: 3990.00 ft | |
Configuration: Vertical | |
Latitude: 41.240000 | |
Longitude: -81.470000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2011-09-30 | Proposed Formations:OHIO SHALE THRU CLINTON, Issued Date:9/30/2011, Expired Date:9/29/2013 12:00:00 PM, Drilling unit acres:113.17, Proposed Well Type:OG, Proposed Well Class:POOL |
APP | 2011-10-17 | Proposed Formations:OHIO SHALE THRU CLINTON, Issued Date:10/17/2011, Expired Date:10/16/2013 12:00:00 PM, Drilling unit acres:113.17, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2011-11-13 | |
Completion Report Received | 2012-02-21 | |
Construction Permit Expires | 2012-10-16 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2012-03-06 | 3731 | 3771 | 70 |
3731 | 3771 | 70 | |
3731 | 3771 | 70 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2011-12-06 | H2O | 15 | 110500 Gal | 80000 | Producers Service Corporation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | OHIO VALLEY ENERGY SYSTEMS COR | 12593.00 | 643.00 | 162 |
2013 | OHIO VALLEY ENERGY SYSTEMS COR | 18779.00 | 470.00 | 365 |
2014 | OHIO VALLEY ENERGY SYSTEMS COR | 12183.00 | 304.00 | 365 |
2015 | OHIO VALLEY ENERGY SYSTEMS COR | 9689.00 | 168.00 | 365 |
2016 | OHIO VALLEY ENERGY SYSTEMS COR | 7368.00 | 192.00 | 365 |
2017 | OHIO VALLEY ENERGY SYSTEMS COR | 6035.00 | 96.00 | 365 |
2018 | OHIO VALLEY ENERGY SYSTEMS COR | 6471.00 | 222.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 0 | 162 |
2013 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 259 | 365 |
2014 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 139 | 365 |
2015 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 173 | 365 |
2016 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 0 | 365 |
2017 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 38 | 365 |
2018 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 75 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1102460996 | 2012-7-16 0:00: | PL | No Violations | |
-1308464958 | 2011-12-14 0:00 | UD | No Violations | |
-243340128 | 2012-1-18 0:00: | UD | No Violations | |
-259533211 | 2011-11-9 0:00: | UD | No Violations | |
-28258359 | 2011-11-8 0:00: | UD | No Violations | |
-546416530 | 2012-4-17 0:00: | UD | No Violations | |
0028258359 | 2011-11-08 | Urban Drill / Deepen / Reopen | No Violations | Wildcat Drilling is moving on location and should spud the well later tonight or early tomorrow morning. The pits are being excavated in dense clay with no indication of a shallow water table. No violations at this time. |
0243340128 | 2012-01-18 | Urban Drill / Deepen / Reopen | No Violations | No change in the status of this well. Waiting for the tank battery to be set and the salesline to be installed. |
0259533211 | 2011-11-09 | Urban Drill / Deepen / Reopen | No Violations | Wildcat drilled a 17.5 hole and ran 186 of 11.75 conductor casing. They should be ready to run surface casing later today. The drilling pits are in good condition. |
0546416530 | 2012-04-17 | Urban Drill / Deepen / Reopen | No Violations | Preliminary Restoration is due. I spoke with Ted Hill about finish grading, seeding and mulch. He stated that a contractor was scheduled to complete the work as soon as possible. The Laurel Lake maintenance group has reportedly taken responsibility for reclaiming the lease road to the tank battery since it will be a shared drive. |
0710876019 | 2011-12-28 | Urban Drill / Deepen / Reopen | No Violations | There is no change in the status of the well, which has been fraced and tubing has been run. The tank battery has not been set and the flowline and salesline need to be installed before the well can be turned in line. |
0734592884 | 2011-11-15 | Urban Drill / Deepen / Reopen | No Violations | Wildcat has moved off location. The pits are fenced and lined but will need fluid removed as soon as possible. The location and lease road are very soft following recent rains. |
1102460996 | 2012-07-16 | Preliminary Restoration | No Violations | Preliminary Restoration is approved. |
1308464958 | 2011-12-14 | Urban Drill / Deepen / Reopen | No Violations | The well has been fraced and tubing run. The tank battery parts are on location but need to be assembled. |
1323702539 | 2011-11-30 | Urban Drill / Deepen / Reopen | No Violations | The drilling pits have been solidified and covered over. The well is scheduled to be completed next week. No violations at this time. |
710876019 | 2011-12-28 0:00 | UD | No Violations | |
734592884 | 2011-11-15 0:00 | UD | No Violations |
For data sources see[9]