Well ID: 34-153-23146
Loading map...
Country: United States
State: Ohio
County: <County>
Municipality:
Operator Name: BASS ENERGY CO INC
Well Pad ID:
Farm/Lease Name: CCWD UNIT
License Status: Producing
License Date: 2011-12-07
Spud Date: 2012-01-16
Spud Drilling Contractor: POULSON DRILLING
Final Drill Date: 2012-01-22
Well Total Depth: 4025.00 ft
Configuration: Vertical
Latitude: 41.100000
Longitude: -81.490000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2011-12-07 Proposed Formations:OHIO SHALE THRU CLINTON, Issued Date:12/7/2011, Expired Date:12/6/2013 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2012-01-22
Construction Permit Expires 2012-12-06
Completion Report Received 2013-05-16
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2013-05-17 3848 3916 100
3848 3916 100
3848 3916 100

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2012-03-28 H2O 15 73678 Gal 53300 Universal Well Services Inc.

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2012 BASS ENERGY CO INC 11020.00 571.00 207
2013 BASS ENERGY CO INC 10670.00 648.00 365
2014 BASS ENERGY CO INC 7469.00 436.00 365
2015 BASS ENERGY CO INC 6657.00 331.00 365
2016 BASS ENERGY CO INC 5494.00 347.00 365
2017 BASS ENERGY CO INC 4744.00 342.00 365
2018 BASS ENERGY CO INC 4283.00 308.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2012 BASS ENERGY CO INC Brine 955 207
2013 BASS ENERGY CO INC Brine 689 365
2014 BASS ENERGY CO INC Brine 447 365
2015 BASS ENERGY CO INC Brine 356 365
2016 BASS ENERGY CO INC Brine 322 365
2017 BASS ENERGY CO INC Brine 250 365
2018 BASS ENERGY CO INC Brine 333 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1033022294 2012-1-9 0:00:0 UD No Violations
-1215709114 2012-3-26 0:00: UD No Violations
-505161678 2012-1-20 0:00: UD No Violations
-936273302 2012-1-31 0:00: UD No Violations
-9763827 2012-7-16 0:00: PL No Violations
0009763827 2012-07-16 Preliminary Restoration No Violations Preliminary Restoration is approved.
0505161678 2012-01-20 Urban Drill / Deepen / Reopen No Violations Poulson is drilling ahead on fluid at 3040. The pits are lined and in good condition. Poulson switched from air to fluid at 3142 as required by permit.
0936273302 2012-01-31 Urban Drill / Deepen / Reopen No Violations The drilling pits have been solidified and covered over. No violations at this time.
1033022294 2012-01-09 Urban Drill / Deepen / Reopen No Violations Equipment to arrive later today to start building the location. Poulson Drilling is scheduled for early next week.
1215709114 2012-03-26 Urban Drill / Deepen / Reopen No Violations Bass Energy is filling four 500 bbl frac tanks from an Akron city fire hydrant. The perforating is scheduled for 3/27 and the frac for 3/28. No violations at this time.
1326990754 2012-01-17 Urban Drill / Deepen / Reopen No Violations The rig set and cemented 109 of 11-3/4 conductor casing was set and cemented yesterday. The job was not witnessed since the activity occurred on a holiday. According to the records left on site by the cement contractor (Universal) and interviews with Poulson employees, cement did not circulate to surface. Circulation was maintained during the job but cement did not reach surface. After displacing the plug, the ground surface started to fail around the well which made surface grouting impractical. Rig integrity was never in doubt. It appears that insufficient cement was mixed and displaced. Additional cement will be ordered for cementing surface casing.
1333979450 2012-03-28 Urban Drill / Deepen / Reopen No Violations Berry Well Service and Universal Well Service were on site to frac the well. The slickwater job included 70,000 gallons of water and sand. No violations at this time.
1465190061 2012-01-27 Urban Drill / Deepen / Reopen No Violations Circle C is on site to provide the solidification material and the equipment to start closing the drilling pits. Pander Trucking has been removing pit water either from a 300 bbl frac tank or directly from the pits.
1951648123 2012-01-18 Urban Drill / Deepen / Reopen No Violations Plug down on the surface casing cement job was at 22:36 on 1/17. On site this morning to witness the blowout preventer (BOP) test. The annular BOP test was successful. Poulson will resume drilling the main hole this morning. The pits are lined and in good condition.
2066609041 2012-01-25 Urban Drill / Deepen / Reopen No Violations Poulson Drilling has moved off location. The drilling pits are fenced, lined and in good condition and are being pumped down. No violations at this time.

For data sources see[9]

References