If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-155-20382 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.39,"lon":-80.98,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Trumbull | |
Municipality: Farmington Township | |
Operator Name: PIN OAK ENERGY PARTNERS LLC | |
Well Pad ID: | |
Farm/Lease Name: TURON J& J | |
License Status: Producing | |
License Date: 1977-01-18 | |
Spud Date: 1978-09-02 | |
Spud Drilling Contractor: | |
Final Drill Date: 1978-09-08 | |
Well Total Depth: 3999.00 ft | |
Configuration: Vertical | |
Latitude: 41.390000 | |
Longitude: -80.980000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1977-01-18 | 935 HUTCHESON RH/BoCOR PROD GeoDate 1/18/77 |
Original Spud | 1978-09-02 | R.L. & CHGE IN OPER. 8-30-78, R.I. 1-26-77, R.L. 6-29-77 |
Completed | 1978-09-08 | R.L. & CHGE IN OPER. 8-30-78, R.I. 1-26-77, R.L. 6-29-77 |
Reached Total Depth | 1978-09-08 | R.L. & CHGE IN OPER. 8-30-78, R.I. 1-26-77, R.L. 6-29-77 |
Change of Owner | 2016-10-11 | Operator changed from 935, BOCOR HOLDINGS, LLC/BOCOR PROD to 9722, PIN OAK ENERGY PARTNERS LLC |
Record Last Modified | 2019-06-04 | R.L. & CHGE IN OPER. 8-30-78, R.I. 1-26-77, R.L. 6-29-77 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 3884 | 3924 | 24 |
3884 | 3924 | 24 | |
3884 | 3924 | 24 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 83000 Gal | 72000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1985 | GIANT PETROLEUM CORP | 1578.00 | 327.00 | 365 |
1986 | GIANT PETROLEUM CORP | 1254.00 | 232.00 | 365 |
1988 | GIANT PETROLEUM CORP | 263.00 | 138.00 | 329 |
1989 | ATLAS ENERGY GROUP INC | 1992.00 | 0.00 | 182 |
1990 | ATLAS ENERGY GROUP INC | 1678.00 | 0.00 | 330 |
1992 | ATLAS ENERGY GROUP INC | 1439.00 | 42.00 | 365 |
1993 | ATLAS ENERGY GROUP INC | 1191.00 | 0.00 | 154 |
1995 | ATLAS ENERGY GROUP INC | 1014.00 | 0.00 | 365 |
1996 | ATLAS ENERGY GROUP INC | 428.00 | 0.00 | 84 |
1997 | ATLAS ENERGY GROUP INC | 1763.00 | 0.00 | 305 |
1999 | ATLAS ENERGY GROUP INC | 897.00 | 47.00 | 365 |
2003 | BOCOR HOLDINGS, LLC | 0.00 | 0.00 | 0 |
2004 | BOCOR HOLDINGS, LLC | 0.00 | 0.00 | 0 |
2005 | BOCOR HOLDINGS, LLC | 0.00 | 0.00 | 0 |
2012 | BOCOR HOLDINGS, LLC | 0.00 | 0.00 | 0 |
2013 | BOCOR HOLDINGS, LLC | 0.00 | 0.00 | 0 |
2016 | BOCOR HOLDINGS, LLC | 240.00 | 66.00 | 365 |
2017 | PIN OAK ENERGY PARTNERS LLC | 153.00 | 0.00 | 365 |
2018 | PIN OAK ENERGY PARTNERS LLC | 218.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1985 | GIANT PETROLEUM CORP | Brine | 0 | 365 |
1986 | GIANT PETROLEUM CORP | Brine | 71 | 365 |
1988 | GIANT PETROLEUM CORP | Brine | 84 | 329 |
1989 | ATLAS ENERGY GROUP INC | Brine | 80 | 182 |
1990 | ATLAS ENERGY GROUP INC | Brine | 80 | 330 |
1992 | ATLAS ENERGY GROUP INC | Brine | 125 | 365 |
1993 | ATLAS ENERGY GROUP INC | Brine | 0 | 154 |
1995 | ATLAS ENERGY GROUP INC | Brine | 0 | 365 |
1996 | ATLAS ENERGY GROUP INC | Brine | 0 | 84 |
1997 | ATLAS ENERGY GROUP INC | Brine | 86 | 305 |
1999 | ATLAS ENERGY GROUP INC | Brine | 25 | 365 |
2003 | BOCOR HOLDINGS, LLC | Brine | 0 | 0 |
2004 | BOCOR HOLDINGS, LLC | Brine | 0 | 0 |
2005 | BOCOR HOLDINGS, LLC | Brine | 0 | 0 |
2012 | BOCOR HOLDINGS, LLC | Brine | 0 | 0 |
2013 | BOCOR HOLDINGS, LLC | Brine | 0 | 0 |
2016 | PIN OAK ENERGY PARTNERS LLC | Brine | 0 | 365 |
2017 | PIN OAK ENERGY PARTNERS LLC | Brine | 12 | 365 |
2018 | PIN OAK ENERGY PARTNERS LLC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1489494849 | 2015-6-2 0:00:0 | PW | No Violations | 1.00 |
0029763576 | 2015-03-25 | Production Wells | No Violations | I was on location for a status check. I called Bocors well tender, Greg, to help locate the well. Greg and I found the well engulfed with weeds and shrubs. The well is a swab well. The main flow line valve is in the closed position. The tank battery consists of a 210 barrel production tank, a 100 barrel brine tank, a compressor and two (2), mechanical separators. A dike surrounded the tank battery. There is no identification sign posted for the well. The lease road is in stable condition. I researched the RBDMS database and found Bocor filed zero annual production for 2012 and 2013. There is no annual production filed from 2006 to 2011. I called and spoke with Todd Sutko, field supervisor for Bocor. Mr. Sutko request time to make repairs and place the well back into production. I told Mr. Sutko to post a proper identification sign and to cut down the weeds and shrubs. A follow-up inspection will be conducted by 4/21/2015. |
1489494849 | 2015-06-02 | Production Wells | No Violations | I was on location for a follow-up inspection. During my inspection, I found the well still not in production. The shrubs around the well have not been cut down. I called and spoke with Jim Palmier, field supervisor for Bocor. Mr. Palmier asked for more time to allow the area to dry up in order to get a rig onto location. He stated Bocor plans to swab the well by the end of June. I told Mr. Palmier a follow-up inspection will be conducted by 7/6/2015. |
156473186 | 2019-7-29 0:00: | PW | No Violations | |
29763576 | 2015-3-25 0:00: | PW | No Violations | 1.50 |
For data sources see[9]