If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-155-22078 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.39,"lon":-80.89,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Trumbull | |
Municipality: Bristol Township | |
Operator Name: PETROX, INC | |
Well Pad ID: | |
Farm/Lease Name: WILLIAMS | |
License Status: Final Restoration | |
License Date: 2013-10-21 | |
Spud Date: 1982-02-26 | |
Spud Drilling Contractor: | |
Final Drill Date: 1982-03-03 | |
Well Total Depth: 4100.00 ft | |
Configuration: Vertical | |
Latitude: 41.390000 | |
Longitude: -80.890000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1981-12-31 | 1777 ALTOS PETROLEUM SERV INC GeoDate 12/31/81 |
Original Spud | 1982-02-26 | FORM 55 RCD 11-29-2013 |
Completed | 1982-03-03 | FORM 55 RCD 11-29-2013 |
Reached Total Depth | 1982-03-03 | FORM 55 RCD 11-29-2013 |
CO | 1993-10-18 | 1966 PETROX INC GeoDate 12/31/81 |
CO | 1994-06-02 | 1966 PETROX INC GeoDate 6/2/94 |
Unknown | 1994-06-02 | Issued Date 6/2/94 Expired Date 6/2/95 Proposed Purpose OG Was Plug Supervised Who Superivsed Plug and Abandon Date |
APP | 1998-01-27 | Proposed Formations:CLINTON, Issued Date:1/27/98, Expired Date:1/27/99 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class: |
APP | 2013-10-21 | Proposed Formations:CLINTON, Issued Date:10/21/2013, Expired Date:10/21/2015 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class: |
Plugged/Abandoned | 2013-10-22 | FORM 55 RCD 11-29-2013 |
Construction Permit Expires | 2015-10-21 | FORM 55 RCD 11-29-2013 |
Record Last Modified | 2016-08-11 | FORM 55 RCD 11-29-2013 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 3916 | 3952 | 15 |
3916 | 3952 | 15 | |
3916 | 3952 | 15 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 57970 Gal | 50000 | |||
N2 | 0 | 145 Mscf | 0 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | YEI INC | 2262.00 | 506.00 | 0 |
1985 | YEI INC | 1609.00 | 341.00 | 189 |
1987 | ALTOS PETROLEUM SERV INC | 920.00 | 305.00 | 209 |
1988 | ALTOS PETROLEUM SERV INC | 1572.00 | 274.00 | 358 |
1989 | ALTOS PETROLEUM SERV INC | 999.00 | 280.00 | 340 |
1990 | ALTOS PETROLEUM SERV INC | 727.00 | 268.00 | 344 |
1991 | CGAS EXPLORATION | 385.00 | 226.00 | 365 |
1992 | ALSID OIL & GAS | 490.00 | 224.00 | 365 |
1993 | PETROX, INC | 103.00 | 0.00 | 80 |
1994 | CGAS EXPLORATION | 500.00 | 173.00 | 365 |
1995 | PETROX, INC | 0.00 | 0.00 | 365 |
1996 | PETROX, INC | 0.00 | 0.00 | 365 |
1997 | PETROX, INC | 0.00 | 0.00 | 365 |
1998 | PETROX, INC | 0.00 | 0.00 | 365 |
1999 | PETROX, INC | 0.00 | 0.00 | 365 |
2001 | PETROX, INC | 0.00 | 0.00 | 0 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | YEI INC | Brine | 0 | 0 |
1985 | YEI INC | Brine | 325 | 189 |
1987 | ALTOS PETROLEUM SERV INC | Brine | 141 | 209 |
1988 | ALTOS PETROLEUM SERV INC | Brine | 290 | 358 |
1989 | ALTOS PETROLEUM SERV INC | Brine | 265 | 340 |
1990 | ALTOS PETROLEUM SERV INC | Brine | 261 | 344 |
1991 | CGAS EXPLORATION | Brine | 0 | 365 |
1992 | ALSID OIL & GAS | Brine | 195 | 365 |
1993 | PETROX, INC | Brine | 140 | 80 |
1994 | CGAS EXPLORATION | Brine | 0 | 365 |
1995 | PETROX, INC | Brine | 0 | 365 |
1996 | PETROX, INC | Brine | 0 | 365 |
1997 | PETROX, INC | Brine | 0 | 365 |
1998 | PETROX, INC | Brine | 0 | 365 |
1999 | PETROX, INC | Brine | 0 | 365 |
2001 | PETROX, INC | Brine | 0 | 0 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-2066222449 | 2013-10-22 0:00 | PB | No Violations | 8.50 |
1532465027 | 2016-06-03 | Final Restoration | No Violations | I was on location for a final restoration. I found during my inspection all of the production equipment removed. The site was graded. Vegetation was well established. The pits were filled and closed. All debris was removed. The lease road was being used to service an existing well. Final restoration passed. |
1842110072 | 2014-07-30 | Final Restoration | No Violations | I was on location for a final restoration. I found during my inspection all of the production equipment removed. The site was graded. Vegetation was well established. The pits were filled and closed. All debris was removed. The lease road was being used to service an existing well. Final restoration passed. |
2066222449 | 2013-10-22 | Plug / Plug Back | No Violations | I witnessed Nicks Well Plugging plug the well for Petrox, Inc. Nick bull headed 25 sacks of Class A cement for Plug #1. The cement was displace with 60 bbls of salt water. Plug #1 was set from 3,716 to 4,002. The operator pressured up to 900 psi and held it for 30 minutes. Next, the 4.5 casing was ripped at 2,760 and 8 joints were removed. Nick established circulation and pumped 86 sacks of Class A cement. The cement was displaced with 36 bbls of fresh water. Plug #2 was set from 2,172 to 2,472 to cover the top of the Big Lime. The operator pull 61 joints. Nick established circulation and pumped 139 bbls of Class A cement. I witnessed a good cement returned to surface. Plug #3 was set from 450 to surface. The operator pulled the remaining 13 joints and the cement was topped off. Cement was static at surface after 20 minutes. A total of 82 joints of 4.5 casing was removed from the well. |
For data sources see[9]