{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.26,"lon":-80.56,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Trumbull | |
Municipality: Brookfield Township | |
Operator Name: BIG SKY ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: O'BRIEN | |
License Status: Producing | |
License Date: 1982-08-03 | |
Spud Date: 1982-10-02 | |
Spud Drilling Contractor: ARMSTRONG DRLG | |
Final Drill Date: 1982-10-07 | |
Well Total Depth: 5000.00 ft | |
Configuration: Vertical | |
Latitude: 41.260000 | |
Longitude: -80.560000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1982-08-03 | Issued Date 8/3/82 Expired Date 2/1/83 Acres 0040000 Tool Type RTA Proposed Formation CLINTON Proposed Depth 05000 Proposed Drill Depth 05000 |
Original Spud | 1982-10-02 | |
Completed | 1982-10-07 | |
Reached Total Depth | 1982-10-07 | |
CO | 1982-11-25 | 54 TITAN ENERGY CORP GeoDate 8/3/82 |
Completion Report Received | 1982-12-16 | |
Construction Permit Expires | 1983-02-01 | |
Change of Owner | 1998-01-26 | Operator changed from 54, TITAN ENERGY CORP to 1333, BARR ROBT/dba BIG SKY PET |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 4771 | 4833 | 3 |
4772 | 4833 | 0 | |
1997-06-29 | 4772 | 4833 | 0 |
4771 | 4833 | 3 | |
4771 | 4833 | 3 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 62000 Gal | 70000 | FRAC;62MG H2O,70M# SAND,220MCF N2,ACID | ||
N2 | 0 | 220 Mscf | 0 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | TITAN ENERGY CORP | 15959.00 | 138.00 | 0 |
1985 | TITAN ENERGY CORP | 10213.00 | 100.00 | 0 |
1986 | TITAN ENERGY CORP | 7539.00 | 40.00 | 365 |
1987 | TITAN ENERGY CORP | 5287.00 | 71.00 | 365 |
1988 | TITAN ENERGY CORP | 5291.00 | 36.00 | 365 |
1989 | TITAN ENERGY CORP | 9513.00 | 153.00 | 365 |
1990 | TITAN ENERGY CORP | 6295.00 | 63.00 | 365 |
1991 | TITAN ENERGY CORP | 1734.00 | 35.00 | 365 |
1992 | TITAN ENERGY CORP | 3500.00 | 40.00 | 365 |
1993 | TITAN ENERGY CORP | 3652.00 | 29.00 | 365 |
1994 | TITAN ENERGY CORP | 1862.00 | 0.00 | 365 |
1997 | TITAN ENERGY CORP | 2189.00 | 14.00 | 245 |
2000 | BIG SKY ENERGY INC | 1679.00 | 18.00 | 365 |
2001 | BIG SKY ENERGY INC | 1672.00 | 20.00 | 365 |
2002 | BIG SKY ENERGY INC | 1287.00 | 0.00 | 365 |
2003 | BIG SKY ENERGY INC | 1909.00 | 0.00 | 365 |
2004 | BIG SKY ENERGY INC | 1775.00 | 20.00 | 365 |
2005 | BIG SKY ENERGY INC | 1253.00 | 0.00 | 365 |
2006 | BIG SKY ENERGY INC | 972.00 | 26.00 | 365 |
2007 | BIG SKY ENERGY INC | 744.00 | 0.00 | 365 |
2008 | BIG SKY ENERGY INC | 2022.00 | 0.00 | 365 |
2009 | BIG SKY ENERGY INC | 1151.00 | 0.00 | 365 |
2010 | BIG SKY ENERGY INC | 1579.00 | 0.00 | 365 |
2011 | BIG SKY ENERGY INC | 2128.00 | 0.00 | 365 |
2012 | BIG SKY ENERGY INC | 1504.00 | 0.00 | 366 |
2013 | BIG SKY ENERGY INC | 286.00 | 0.00 | 280 |
2014 | BIG SKY ENERGY INC | 447.00 | 0.00 | 365 |
2016 | BIG SKY ENERGY INC | 57.00 | 0.00 | 98 |
2017 | BIG SKY ENERGY INC | 0.00 | 0.00 | 0 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | TITAN ENERGY CORP | Brine | 0 | 0 |
1985 | TITAN ENERGY CORP | Brine | 0 | 0 |
1986 | TITAN ENERGY CORP | Brine | 0 | 365 |
1987 | TITAN ENERGY CORP | Brine | 0 | 365 |
1988 | TITAN ENERGY CORP | Brine | 0 | 365 |
1989 | TITAN ENERGY CORP | Brine | 0 | 365 |
1990 | TITAN ENERGY CORP | Brine | 0 | 365 |
1991 | TITAN ENERGY CORP | Brine | 0 | 365 |
1992 | TITAN ENERGY CORP | Brine | 0 | 365 |
1993 | TITAN ENERGY CORP | Brine | 0 | 365 |
1994 | TITAN ENERGY CORP | Brine | 0 | 365 |
1997 | TITAN ENERGY CORP | Brine | 245 | |
2000 | BIG SKY ENERGY INC | Brine | 0 | 365 |
2001 | BIG SKY ENERGY INC | Brine | 0 | 365 |
2002 | BIG SKY ENERGY INC | Brine | 0 | 365 |
2003 | BIG SKY ENERGY INC | Brine | 0 | 365 |
2004 | BIG SKY ENERGY INC | Brine | 0 | 365 |
2005 | BIG SKY ENERGY INC | Brine | 0 | 365 |
2006 | BIG SKY ENERGY INC | Brine | 0 | 365 |
2007 | BIG SKY ENERGY INC | Brine | 0 | 365 |
2008 | BIG SKY ENERGY INC | Brine | 0 | 365 |
2009 | BIG SKY ENERGY INC | Brine | 0 | 365 |
2010 | BIG SKY ENERGY INC | Brine | 0 | 365 |
2011 | BIG SKY ENERGY INC | Brine | 0 | 365 |
2012 | BIG SKY ENERGY INC | Brine | 0 | 366 |
2013 | BIG SKY ENERGY INC | Brine | 0 | 280 |
2014 | BIG SKY ENERGY INC | Brine | 0 | 365 |
2016 | BIG SKY ENERGY INC | Brine | 0 | 98 |
2017 | BIG SKY ENERGY INC | Brine | 0 | 0 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1020306529 | 2019-2-5 0:00:0 | UP | No Violations | 0.40 |
-1211111439 | 2017-3-10 0:00: | UP | No Violations | 0.60 |
-124830954 | 2016-4-19 0:00: | UP | No Violations | |
-1739208384 | 2015-8-11 0:00: | UP | No Violations | 0.50 |
0000PL3978 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
0006736138 | 2018-03-22 | UrbanProduction Wells | No Violations | I conducted a compliance notice follow-up inspection for compliance notice 124830954. The well was equipped with a plunger lift assembly and the annulus and flow line valves were open. There was a domestic gas supply plumbed off of the wellhead with an open 2 inch ball valve. There was still a small gas leak coming from the tubing packing. The diked tank battery has four (4) storage tanks. There is approximately 6 to 8 inches of standing water within the entire diked tank battery. Due to the standing water in the dike, I was unable to see if the oil impacted soil and vegetation was cleaned up. There are two (2) separators outside of the dike. Valves on the separator were open. The tank battery was shared with permit #2-2236 and #2-1702. A new identification sign has been stenciled onto the right door of the separator with the owner name listed as Vortex Energy, LLC. Signage was also added at the well location. The permit #2-2237 was stenciled on the separator, which is incorrect for this well. This separator was shared with permit # 2-2236. The access was stable. |
0124830954 | 2016-04-19 | UrbanProduction Wells | Violations Noted | I conducted an inspection on this well. The well is equipped with a plunger lift assembly and the valves on the wellhead are open. There is domestic line off of the 4.5 inch casing. The tank battery consists of two, 100 BBL production tanks, two, 50 BBL brine tanks. The last date on the chart was 2/29/16 and showed production. There is pooled oil within the tank battery covering half of the inside of the tank battery. Absorbant pads have been placed on top of the pooled oil. A dike surrounds the tanks but not the mechanical separators. The well shares the tank battery with permits 21702 and 22236. Identification signs are posted on the separators but not at the wellhead. The lease road is stable and driveable. The following items need addressed:
1) Clean-up and remove all of the oil in the tank battery and properly dispose of the impacted soil. 2) Add signage to the wellhead. 3) Find and repair the leak in the tank battery. 4) The well needs shut in immediately per the temporary restraining order issued by the Trumbull County Court of Common Pleas, dated 4/11/2016. |
1020306529 | 2019-02-05 | UrbanProduction Wells | No Violations | I conducted a compliance notice follow-up inspection for compliance notice 124830954, regarding the leaking 100 BBL heater tube and remediation of the impacted soil within the tank battery. The well was equipped with a plunger lift assembly and in production, at the time of this inspection. There was a domestic gas supply plumbed off of the wellhead with an open 2 inch ball valve. The gas leak on the tubing packing has been repaired. The tank battery consisted of two 100 BBL production tanks, two 50 BBL steel brine tanks. Two heater treater separators were also present and had been installed outside of the diked tank battery. Valves on the separator were open, and the chart on the sales line showed production. The oil impacted soil within the diked battery could not be seen due to the standing frozen water within the battery, and I could not observe if cleanup efforts have been made. One of the heater tubes on the 100 BBL production tank was also covered in frozen ice and I could not see if the leak was still present. Identification signs have been stenciled onto the right door of the separator with the current owner information. The access road was stable. The tank battery was shared with permits 2-2235 and 2-1702. |
1211111439 | 2017-03-10 | UrbanProduction Wells | No Violations | I was on location to assess compliance notice #--2237 is stenciled on the separator, which is incorrect for this well. A deduct meter and 31 day chart dated 2-29--2236. The access road is in good repair. Photos were taken and are available upon request. The tank battery is shared with permit #2-2236 and #2-1702.
Big Sky still needs to: 1) Clean-up and remove all of the oil in the tank battery and properly dispose of the impacted soil. 2) Add signage to the wellhead. 3) Install a dike around the mechanical separators. 4) Properly remove the standing water from the tank battery. |
1567608039 | 2019-9-4 0:00:0 | UP | No Violations | |
1721973838 | 2016-09-15 | UrbanProduction Wells | No Violations | I was on location to assess compliance notice # --2236 and 2-1702. Photos were taken and are available upon request. |
1739208384 | 2015-08-11 | UrbanProduction Wells | No Violations | I was on location for a status check. During my inspection, I found the well in production. The well is equipped with a plunger lift assembly. The permit number is written on the rabbit catcher at the well. The tank battery consists of a 100 barrel production tank, a 50 barrel brine tank, and two (2), mechanical separators. A dike surrounds the tanks. An identification sign is posted on the separator. A plug is installed on the load line. The lease road is paved and in good condition. The well shares the tank battery with permits 2-2236 and 2-1702. The well was placed into production prior to House Bill 278. |
6736138 | 2018-3-22 0:00: | UP | No Violations | |
PL3978 | PL | No Violations |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
0124830954 | US-OH-106609 | 2016-05-26 | ID (a-i) | |
0124830954 | US-OH-106610 | 2016-05-26 | Well operation causing pollution and contamination | |
0124830954 | US-OH-106611 | 2016-05-26 | Failure to keep dike or pit free of brine or other wastes |