If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-155-22395 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.25,"lon":-80.63,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Trumbull | |
Municipality: Vienna Township | |
Operator Name: KLEESE DEVELOPMENT ASSOCIATES | |
Well Pad ID: | |
Farm/Lease Name: PANNUNZIO-HERROCK | |
License Status: Producing | |
License Date: 2020-06-11 | |
Spud Date: 1983-09-28 | |
Spud Drilling Contractor: SERVICE RIG | |
Final Drill Date: 1983-10-06 | |
Well Total Depth: 5118.00 ft | |
Configuration: Vertical | |
Latitude: 41.250000 | |
Longitude: -80.630000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1983-09-14 | Issued Date 9/14/83 Expired Date 3/12/84 Acres 0040000 Tool Type RTA Proposed Formation CLINTON Proposed Depth 05118 Proposed Drill Depth 05118 |
Original Spud | 1983-09-28 | |
Completed | 1983-10-06 | |
Reached Total Depth | 1983-10-06 | |
CO | 1983-12-01 | 1510 B & K DRILLING CO GeoDate 9/14/83 |
Construction Permit Expires | 1984-03-12 | |
Completion Report Received | 1984-07-31 | |
CO | 1995-01-30 | 2655 KLEESE DEVELOPMENT ASSOCS GeoDate 9/14/83 |
Record Last Modified | 2015-09-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 0 | 0 | |
0 | 0 | ||
2006-09-11 | 4848 | 5005 | 21 |
4848 | 5005 | 21 | |
0 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 80000 Gal | 50000 | FRAC: WATER-SAND |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-177220538 | 2016-4-19 0:00: | PW | No Violations | |
-191161047 | 2016-2-9 0:00:0 | PW | No Violations | 0.30 |
0000PL3859 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
0177220538 | 2016-04-19 | Production Wells | No Violations | I was contacted by Dave Little from KDA at 4:00 PM about a dump line that had leaked into a field. I contacted Emergency Response Services at 4:05 PM to report the spill to them. Upon arrival on location the affected area was in between the separator and the production tank and was 135 by 60. There is 2 BBLs of oil and 4 BBLs of brine that has escaped from the dump line. The spill is contained by high grass. The company will return on 4/20/16 with an excavator and lined roll off containers to remove the impacted soil. The company will then bring in new soil to replace the soil that was removed from the location. |
0191161047 | 2016-02-09 | Production Wells | No Violations
| |
1172376582 | 2003-12-11 | Production Wells | No Violations | WW 03-004 , Richard Dascenzo . Inspection showed 8 5/8 surface casing was shut-in . There is no visible violations . |
1461593078 | 2016-04-20 | Production Wells | No Violations | I was on location for the clean up process of the oil and brine spill from the previous day. The company has removed the oil and brine contaminated soil in six roll off containers that are being taken to shale mountain resources to be processed and disposed of. The company has excavated the dump line and made a temporary repair until they can replace the line with new plastic line. The company has brought in new soil to replace the contaminated soil. They have seeded and strawed the location. The clean up of the location is complete. |
1463061451 | 2016-05-12 | Production Wells | No Violations | At the time of my inspection, I found KDA posted an identification sign on the 100 bbl storage tank per my request. |
1574780790 | 2019-11-26 0:00 | PW | No Violations | |
1578062335 | 2020-1-3 0:00:0 | EX | No Violations | |
PL3859 | PL | No Violations |
For data sources see[9]