{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.26,"lon":-80.52,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Trumbull | |
Municipality: Brookfield Township | |
Operator Name: VORTEX ENERGY LLC | |
Well Pad ID: | |
Farm/Lease Name: RUST K | |
License Status: Producing | |
License Date: 1983-11-10 | |
Spud Date: 1983-12-07 | |
Spud Drilling Contractor: ARMSTRONG DRLG | |
Final Drill Date: 1983-12-13 | |
Well Total Depth: 5070.00 ft | |
Configuration: Vertical | |
Latitude: 41.260000 | |
Longitude: -80.520000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1983-11-10 | Issued Date 11/10/83 Expired Date 5/8/84 Acres 0040000 Tool Type RTA Proposed Formation CLINTON Proposed Depth 05070 Proposed Drill Depth 05070 |
Original Spud | 1983-12-07 | |
Completed | 1983-12-13 | |
Reached Total Depth | 1983-12-13 | |
CO | 1984-05-05 | 54 TITAN ENERGY CORP GeoDate 11/10/83 |
Construction Permit Expires | 1984-05-08 | |
Completion Report Received | 1984-06-04 | |
CO | 1995-09-20 | 1639 BASS ENERGY CO INC GeoDate 11/10/83 |
Change of Owner | 2000-10-21 | Operator changed from 1639, BASS ENERGY CO INC to 1333, BARR ROBT/dba BIG SKY PET |
Change of Owner | 2017-04-13 | Operator changed from 1333, BIG SKY ENERGY INC to 9841, VORTEX ENERGY LLC |
Record Last Modified | 2017-04-13 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 4843 | 4925 | 0 |
4843 | 4925 | 0 | |
2006-09-11 | 4876 | 4924 | 35 |
4876 | 4924 | 35 | |
4843 | 4925 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 59000 Gal | 70000 | |||
ACID | 0 | 500 Gal | 0 | FRAC;H2O,SAND,ACID |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | TITAN ENERGY CORP | 16931.00 | 58.00 | 0 |
1985 | TITAN ENERGY CORP | 18446.00 | 49.00 | 365 |
1986 | TITAN ENERGY CORP | 10681.00 | 0.00 | 365 |
1987 | TITAN ENERGY CORP | 10552.00 | 0.00 | 365 |
1988 | TITAN ENERGY CORP | 13829.00 | 77.00 | 365 |
1989 | TITAN ENERGY CORP | 10017.00 | 0.00 | 365 |
1990 | TITAN ENERGY CORP | 14739.00 | 0.00 | 365 |
1991 | TITAN ENERGY CORP | 5201.00 | 0.00 | 365 |
1992 | TITAN ENERGY CORP | 11440.00 | 64.00 | 365 |
1993 | TITAN ENERGY CORP | 8246.00 | 0.00 | 365 |
1994 | TITAN ENERGY CORP | 1306.00 | 0.00 | 365 |
1996 | BASS ENERGY CO INC | 1651.00 | 0.00 | 120 |
1997 | BASS ENERGY CO INC | 2359.00 | 0.00 | 365 |
1998 | BASS ENERGY CO INC | 358.00 | 0.00 | 365 |
1999 | BASS ENERGY CO INC | 0.00 | 0.00 | 0 |
2001 | BIG SKY ENERGY INC | 11075.00 | 0.00 | 365 |
2002 | BIG SKY ENERGY INC | 8478.00 | 67.00 | 365 |
2003 | BIG SKY ENERGY INC | 3817.00 | 0.00 | 365 |
2004 | BIG SKY ENERGY INC | 4391.00 | 0.00 | 365 |
2005 | BIG SKY ENERGY INC | 4031.00 | 58.00 | 365 |
2006 | BIG SKY ENERGY INC | 3533.00 | 0.00 | 365 |
2007 | BIG SKY ENERGY INC | 2632.00 | 0.00 | 365 |
2008 | BIG SKY ENERGY INC | 1753.00 | 0.00 | 365 |
2009 | BIG SKY ENERGY INC | 854.00 | 0.00 | 365 |
2010 | BIG SKY ENERGY INC | 2534.00 | 0.00 | 365 |
2011 | BIG SKY ENERGY INC | 2517.00 | 0.00 | 365 |
2012 | BIG SKY ENERGY INC | 4063.00 | 0.00 | 366 |
2013 | BIG SKY ENERGY INC | 2278.00 | 0.00 | 365 |
2014 | BIG SKY ENERGY INC | 1574.00 | 0.00 | 365 |
2016 | BIG SKY ENERGY INC | 5.00 | 0.00 | 98 |
2017 | BIG SKY ENERGY INC | 0.00 | 0.00 | 0 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | TITAN ENERGY CORP | Brine | 0 | 0 |
1985 | TITAN ENERGY CORP | Brine | 0 | 365 |
1986 | TITAN ENERGY CORP | Brine | 0 | 365 |
1987 | TITAN ENERGY CORP | Brine | 0 | 365 |
1988 | TITAN ENERGY CORP | Brine | 0 | 365 |
1989 | TITAN ENERGY CORP | Brine | 0 | 365 |
1990 | TITAN ENERGY CORP | Brine | 0 | 365 |
1991 | TITAN ENERGY CORP | Brine | 0 | 365 |
1992 | TITAN ENERGY CORP | Brine | 0 | 365 |
1993 | TITAN ENERGY CORP | Brine | 0 | 365 |
1994 | TITAN ENERGY CORP | Brine | 0 | 365 |
1996 | BASS ENERGY CO INC | Brine | 0 | 120 |
1997 | BASS ENERGY CO INC | Brine | 0 | 365 |
1998 | BASS ENERGY CO INC | Brine | 0 | 365 |
1999 | BASS ENERGY CO INC | Brine | 0 | 0 |
2001 | BIG SKY ENERGY INC | Brine | 0 | 365 |
2002 | BIG SKY ENERGY INC | Brine | 0 | 365 |
2003 | BIG SKY ENERGY INC | Brine | 0 | 365 |
2004 | BIG SKY ENERGY INC | Brine | 0 | 365 |
2005 | BIG SKY ENERGY INC | Brine | 0 | 365 |
2006 | BIG SKY ENERGY INC | Brine | 0 | 365 |
2007 | BIG SKY ENERGY INC | Brine | 0 | 365 |
2008 | BIG SKY ENERGY INC | Brine | 0 | 365 |
2009 | BIG SKY ENERGY INC | Brine | 0 | 365 |
2010 | BIG SKY ENERGY INC | Brine | 0 | 365 |
2011 | BIG SKY ENERGY INC | Brine | 0 | 365 |
2012 | BIG SKY ENERGY INC | Brine | 0 | 366 |
2013 | BIG SKY ENERGY INC | Brine | 0 | 365 |
2014 | BIG SKY ENERGY INC | Brine | 0 | 365 |
2016 | BIG SKY ENERGY INC | Brine | 0 | 98 |
2017 | BIG SKY ENERGY INC | Brine | 0 | 0 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1744328580 | 2015-7-27 0:00: | PW | No Violations | 8.00 |
-1937671653 | 2015-7-25 0:00: | PW | No Violations | |
0000PL3829 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
0791140639 | 2016-08-17 | Production Wells | No Violations
The equipment on the site consists of the following:
| |
1303905741 | 2015-07-29 | Production Wells | No Violations | On location at 9:00 am to observe continuing oil spill clean-up and remediation. During my inspection, I found Mr. Bob Barr Sr. on location discussing further remediation with Federal EPAs Mr. Stephen Wolfe. Next, Mr. Barr left the well site to continue cleaning along the Big Run Creek in Pennsylvania. Meyers was removing pooled water and oil from trench #1. Additional lined containers arrived on location from IWC. Meyer began scraping the top 6 of impacted top soil between the wire fence and tank battery. The area scraped measured 45 long x 20 wide. Meyers decided to dig two, 2 wide x 2 deep x 15 long trenches between the fence and tank battery to capture residual oil from the spill. After 3.5 hours, I observed no oil or water entering the two trenches. Full containers were taken to IWC to be tested for disposal at a proper landfill. Photos were taken and are available upon request. |
1348900573 | 2015-08-03 | Production Wells | No Violations | On location to observe continuing oil spill clean-up and remediation. During my inspection, I found the entire site graded and seeded. Straw has been spread over the grass seed. A new dike has been constructed around a 50 barrel tank. An identification sign is posted at the separator. I observed no oil at the soft booms in the Big Run Creek. |
1437777090 | 2015-07-24 | Production Wells | Violations Noted | I was notified at 10:21 A.M by Terry Whitehair out of the Uniontown office that there was a spill that made it into a creek at this well location. I arrived on location at 11:00 A.M to find the Trumbull County Hazmat crew along with Brookfield fire were on location installing absorbent pads and booms in the Big Run Creek to absorb the oil that had made it into the creek. My inspection found the heating tube on the 100 BBL production tank had rusted through and caused the leak. The 15 BBL of oil that has escaped the tank had made its way 100 to the Big Run Creek and flowed the 500 in the creek before it made it into Pennsylvania. The pasture between the tank battery and the creek was saturated with oil. The pasture that was affected was 100 by 45. The owner of Big Sky, Bob Barr was on location. KDA had a truck on location and was in the process of emptying the 100 BBL production tank, the 50 BBL brine tank, and the puddles of oil in the pasture that could be removed. The company is going to have the tanks removed and the oil saturated soil will be removed as well. The tank battery was not equipped with a proper dike. The well has been shut in until the necessary repairs have been made. |
1438106821 | 2015-07-28 | UrbanProduction Wells | No Violations | On location at 8:00 am to observe continuing oil spill clean-up and remediation. Myers Well Service had disassembled the tank battery. The 100 barrel and 50 barrel tanks were placed into a newly constructed dike with a liner. A 2 deep trench dug yesterday (7/27/2015) by Myers to cut-off the source of the oil spill contained approximately 4 of water and oil. Myers used their super vac truck to remove all of the fluids from the trench. Next, two roll off containers with liners were delivered to the site by Wolford. Myers began removing impacted soil starting at the tank battery location. Myers dug a hole where the 100 barrel tank was located measuring 3 x 3 x 12 deep. A pool of water and oil immediately seeped into the hole measuring 2 deep. The water and oil was removed and Myers continued to remove all of the impacted material working their way towards the Big Run Creek. A total of 6 roll-off containers were filled and removed by Wolford. The containers were taken to IWC for testing prior to disposal. Photos were taken and are available upon request. Follow-up inspection will continue. |
1439551681 | 2015-07-30 | UrbanProduction Wells | No Violations | On location at 9:00 am to observe continuing oil spill clean-up and remediation. During my inspection, I found all of the trenched backfilled and graded by Meyers. KDA arrived and removed the 100 barrel production tank. Next, four loads of material arrived by semi-truck to replace all of the impacted material that Meyers removed. Meyer will seed the entire area once the clean fill has been graded. The four, anchored, soft booms in the Big Run Creek will remain in place until August 7, 2015. Photos were taken and available upon request. |
1461006209 | 2016-04-18 | Production Wells | Violations Noted | |
1587483016 | 2020-4-21 0:00: | UP | No Violations | |
1674105198 | 2015-08-11 | UrbanProduction Wells | No Violations | On location for a compliance notice follow-up. During my inspection, I found Big Sky had re-connected the dump line to the 50 barrel tank. The well has been placed back into production. |
1744328580 | 2015-07-27 | Production Wells | No Violations | On location at 9:25 am to observe continuing oil spill clean-up and remediation. During my inspection, I found Big Sky Energy had contracted Meyers Well Service to perform the remediation of the oil spill. Next, I attended a morning meeting with the Northeast Ohio Regional Manager Tom Hill, ODNR Inspector Kevin Perry, Federal EPA, Ohio EPA, PA EPA, Brookfield Township Fire Department and Sharon PA Fire Department in Sharon, Pennsylvania where the Big Run Creek enters the Shenango River. Mr. Stephen Wolfe briefed everyone that 95% of the oil in the Big Run Creek and Shenango River was remediated. Mr. Wolfe stated completing all remediation by 7/28/2015. Afterward, I returned to the Big Sky well site. Meyers began digging a 2 wide x 2 deep x 20 long trench #1 within 3 of a wire fence cutting off the oil spill source to the creek from the tank battery. I observed oil entering from the west side of the trench. Meyers used a super vac truck to remove water and oil from the trench. Meyer continued to remove impacted material between the trench and creek. All impacted material was placed in line containers supplied by IWC. Meyer anchored four 4 soft boom in the creek. Follow-up inspection will continue. |
1937671653 | 2015-07-25 | Production Wells | No Violations | I arrived on location at 9:30 A:M. The company has hired Myers Well Service to perform the clean up on the location. Myers is in the process of removing the oil contaminated soil from where the oil entered the creek up to the tank battery. Myers has a stock pile of oil saturated soil being stored on a liner near the tank battery until the proper containers are delivered to remove the contaminated soil from the location. The Federal Environmental Protection Agency is on location instructing Myers on how to perform the clean up of the Big Run Creek bed that was contaminated with oil. |
791140639 | 2016-8-17 0:00: | PW | No Violations | 0.70 |
PL3829 | PL | No Violations |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
1437777090 | US-OH-112769 | 2015-09-08 | Well operation causing pollution and contamination | |
1437777090 | US-OH-112770 | 2015-09-08 | No SPCC dike/or failure to keep dike free of water or oil | |
1437777090 | US-OH-112771 | 2015-09-08 | Dike or pit not able to prevent escape of brine or other wastes | |
1461006209 | US-OH-113347 | 2016-06-10 | Failure to legibly identify well |